11. Detailed Tasks Assigned
12. Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned
1. Name of assignment or Project: New Ha Noi-Thai Nguyen Expressway Construction Supervision Stage (ODA)
Year: September 2011 to April 2014.
Location: Bac Ninh, Vietnam
Client: PMU2 (JICA fund)
Main project features:
Expressway consisting 4 motorized lanes, designed with 100Km/h. Starting point is at Ninh Hiep Town (Hanoi) and the Ending point is connected to Thai Nguyen Bypass Road.
- Xuan Tao Bridge (Km 20): The bridge consists 18 spans, and requires construction of bored piles with diameter of 1200mm having average depth of 34m. The construction involved in fabrication of PCI girder (post-tensioned) with 33m long.
- Ngoc Cau Bridge (Km 23), which requires bored pile construction of 1200mm, and the average depth of 25m. The bridge consists spans having PCI girders (post-tensioned) of 33m.
- Flyover at Soc Son Interchange, which requires bored pile construction with diameter of 1200mm and PCI girders of 25m.
- Flyover No.7, which required the construction of bored piles D1200mm with average depth of 20m. The flyover consists spans having PCI girders of 25m.
- The Bridge at Km 21+366 (Main Alignment). The bridge is a 20m double simple supported span bridge (pre-tensioned slab girder).
- Drainage box culverts, underpasses, which requires construction on pre-cast reinforced concrete piles 30x30cm foundation
Positions held: Inspector (Highway)
Activities performed:
- Inspection work for quality, schedule of project.
- Take countermeasures for technical occurences on site.
- Directly involve the procedures to claim for necessary additional works and inspection for the construction of these works in coordination with Consultant Engineer to ensure required quality
- Check technical documentation and as-built drawings of project.
2. Name of assignment or Project: The Cua Dai Bridge
Year: November 2010 to August 2011.
Location: Quang Nam Province, Viet Nam
Client: PMU85
Main project features: Construction Supervision of project:
- Structural of Project: Total long of bridge: 1481m, B = 25m.Chart span:(39+8x40+39)m + 70+120+3x150+120+70)m + (39+4x40+39)m.
- Substructure: Bored Piles D1500 & D1000 L>50m.
Positions held: Inspector
Activities performed:
- Inspection work for quality, schedule of project.
- Take countermeasures for technical occurences on site.
- Directly involve the procedures to claim for necessary additional works and inspection for the construction of these works in coordination with Consultant Engineer to ensure required quality
- Check technical documentation and as-built drawings of project.
3. Name of assignment or Project: Ho Chi Minh Highway Project – Ngoc Thap Bridge
Year: August 2009 to October 2010.
Location: Phu Tho Province, Viet Nam
Client: PMU Ho Chi Minh
Main project features: Construction Supervision of project:
- Total length of bridge: 1051.6m
- Span arrangement: (39+3x40)+(2x40+2x32)+(2x32+2x40)+(65+3x102+65)+(39+2x40+39)m
- Main bridge: continuous PC girder constructed by free cantilever balanced method.
- Approached bridge: simple span using Super T-girder(38.3m&30m).
Positions held: Inspector
Activities performed:
- Inspection work for quality, schedule of project.
- Take countermeasures for technical occurences on site.
- Directly involve the procedures to claim for necessary additional works and inspection for the construction of these works in coordination with Consultant Engineer to ensure required quality
- Check technical documentation and as-built drawings of project.
4. Name of assignment or Project: Transport section loan for National Road network Improvement Project – Bridge 1-5
Year: July 2008 to August 2009.
Location: Nam Dinh province, Vietnam
Client: PMU 6 (JICA fund)
Main project features: Construction Supervision of project:
- Total length of bridge: 118m
- Span arrangement (6x18)m, with of bridge 11m.
- PC voided slab girder constructed by Pre-tensioned method (L=18m).
Positions held: Inspector
Activities performed:
- Inspection work for quality, schedule of project.
- Take countermeasures for technical occurences on site.
- Directly involve the procedures to claim for necessary additional works and inspection for the construction of these works in coordination with Consultant Engineer to ensure required quality
- Check technical documentation and as-built drawings of project.
5. Name of assignment or Project: Nam Song Hau Project – Bac Lieu 2 Bridge
Year: December 2005 to July 2008.
Location: Bac Lieu province, Vietnam
Client: PMU My Thuan
Main project features: Construction Supervision of project:
- Total length of bridge: 350m
- Span arrangement (2x40+(42+63+42)+3x40)m
- Main bridge: continuous PC girder constructed by free cantilever balanced method.
- Approached bridge: simple span using Super T-beam(38.3m)
Positions held: Site Engineer
Activities performed:
- Inspection work for quality, schedule of project.
- Take countermeasures for technical occurrences on site.
- Prepare as-built drawings of project, payment...