5.1 BEFORE PILE SINKING, THE OVERHEAD LINE (HIGH-VOLTAGE POWER LINE) AND THE UNDERGROUND OBSTACLES MUST BE REMOVED; THE SITE SHOULD BE LEVELED, DRAINAGE SMOOTH AND GROUND-BEARING LOAD SATISFIED WITH PILE HAMMERING REQUIREMENTS.
5.1 TRƯỚC KHI CỌC ĐÁNH CHÌM, OVERHEAD DÒNG (ĐIỆN ÁP CAO DÒNG) VÀ PHẢI ĐƯỢC LOẠI BỎ NHỮNG TRỞ NGẠI NGẦM; CÁC TRANG WEB NÊN ĐƯỢC SAN LẤP, THOÁT NƯỚC MỊN VÀ MẶT ĐẤT-MANG TẢI HÀI LÒNG VỚI ĐỐNG HAMMERING YÊU CẦU.