Phase Three – Design Development
• Development of approved schematic phase documents to establish the final scope,
and extent of both BOH and public area show kitchens, systems, components, and
equipment by scaled plans, sections, elevations and details.
• Detailed specifications and cut sheets for of all manufactured and custom made
systems, materials, and equipment in a form suitable for competitive tendering.
• Preparation of final service connections and loads for all MEP services together with
drawings detailing the dimensioned locations of such connections, extraction hoods
and if required, separate exhaust system for gas, electrical, and organically fueled
equipment, shut off valves located at each system, component and equipment
location.