1. Thunderstorm risk: need sufficient lightning rods that are away from solar PV panels and various wiring systems
2. Mains wiring needs to be through pipes across the house that are separate from water supply and drainage pipes; main electricity pipes / boxes must be accessible
3. Wiring must enable solar PV supply as well as public power supply
4. One solar system for 2 houses will save investment cost / kWh (especially because of inverter)– this requires the property to have just one connection to the public grid – but with sub metering for each house
5. Solar PV must be positioned on the most favourable roof(s) from analysis of the position of the sun through the year and the expected sunshine / season but considering aesthetics
6. Inverter of solar PV system must be in a ventilated space
7. Solar PV system must be designed so that it can include a small set of batteries for back-up (battery prices and quality are expected to improve massively in about 1-3 years from now)
8. Switches that make certain appliances work when there is solar power supply, such as fridge and water pumps, and that switch off when there is no solar power supply (with over-ride options)
9. Wiring must enable air conditioners in all bedrooms, minimally, and in the main downstairs sitting room, even if aircos may not be installed immediately
10. Wiring must enable ceiling fans in every room
11. Wiring must enable automatic switches (sensors) so that lights switch off when nobody in room, and external lighting on veranda and over main and side gates with motion activated sensors
12. All lights should be LED
13. Wiring must enable electric cooking / oven even though gas cooker may be installed
14. If cavity walls then wiring must be between the two (brick) walls,
15. Wiring must enable fans and other small appliances in the outdoor sitting areas, also around the pool (which may be built later)

Walls
1. Consider cavity walls (cavity walls will cost more)
2. Consider various types of bricks without cement rendering, which requires very skilful bricklayers and smart electricians / wiring designers
3. Consider cement walls if /where no “raw” bricks (without “matit” that makes all smooth but is not water resistant)
4. Water proofing of bathroom walls up to at least 1.5 m high, even if tradition is perhaps 10-20 cm
5. Consider both outside and inside water proofing of ground floor walls, also 1.5 m high

Foundation
1. Flood proofing: the house should be built on raised ground (though the foundation goes into the ground), with the ground floor level about 1 meter above the current garden level, which is somewhat higher than the ground floors of the newest houses that were built and are being built in this neighbourhood
2. Local tradition is pillars below all designed walls (corners) of 1-2 deep, that are based on a reinforced concrete slab of about 1 m2, leading to perhaps 10-20 pillars and m2 of foundation (=what the whole house rests on). Alternative is to make one “stiff” flat foundation of reinforced concrete, which is more expensive but would essentially be like a raft “floating” in the deep mud, meaning that even if it tilts a bit the house will not crack
3. Consider whether to put some of the water storage tanks under the house(s), or not (foundation should be quite deep, but house should be quite high and these tanks would be above the foundation and below the ground floor and should not leak at all, ever)
4. Consider a (wine) cellar in the cavity between foundation and ground floor, as the temperature will be relatively low and constant
Technical checklist

Water drainage and supply
1. Rainwater drainage to rice fields in front through pipe under the road: size?, connect to concrete system after construction (now earth ditches)
2. Waste water drainage to community? Where is pipe if any? how do the neighbours handle waste water drainage? Are there septic tanks at the neighbouring properties? Two separate septic tanks with overflow to existing system (if there is?)
3. Waste water filter at each property, with grey water for garden, possibly to flush toilets
4. Rainwater capture requires gutters below every roof, which influences the aesthetics and requires creative options – many roofs in Hoi An do not have gutters or rudimentary ones only
5. Rainwater storage to be kept for garden, possibly after a filter also for household supply (backup) or into grey water system for toilet flushing? Rainwater stored underground (with suitable overflow) requires a pump to upper grey water tank.
6. Rainwater drainage (overflow) separate from un-filtered waste water drainage
7. Public water supply tank under each house, or in the garden
8. Each house a water supply tank in the loft, with pump
9. Shower and kitchen sink drainage separate from toilet? (to water filter, into grey water supply system with overflow into public drainage, and to septic tank respectively)
10. Pipes under bathrooms included in the concrete floor slabs, instead of below it
11. Supply and drainage pipes in piping cases that are accessible, and that are separate from power supply pipes with wires
12. Double water supply piping to allow for solar hot water heaters for each house
13. Supply pipes that include valves to close off separate parts of the system - agree
14. Solar water heaters must be positioned on the most favourable roofs but considering aesthetics
15. Add electric “boosters” to solar hot water system for winter period
16. Ensure that underground water tanks (public supply, grey water storage, rainwater storage, septic tank) are duly separated with no possibility for mixing of the water)
17. A simple irrigation system that uses grey water / rainwater through the garden; it must be possible to also connect the mains water system in case of severe drought / water shortage
18. Clean water supply and waste water drainage also at the outdoor sitting area; an outside toilet, shower and hand basin adjacent to pool is needed

Electricity
1. Thunderstorm risk: need sufficient lightning rods that are away from solar PV panels and various wiring systems
2. Mains wiring needs to be through pipes across the house that are separate from water supply and drainage pipes; main electricity pipes / boxes must be accessible
3. Wiring must enable solar PV supply as well as public power supply
4. One solar system for 2 houses will save investment cost / kWh (especially because of inverter)– this requires the property to have just one connection to the public grid – but with sub metering for each house
5. Solar PV must be positioned on the most favourable roof(s) from analysis of the position of the sun through the year and the expected sunshine / season but considering aesthetics
6. Inverter of solar PV system must be in a ventilated space
7. Solar PV system must be designed so that it can include a small set of batteries for back-up (battery prices and quality are expected to improve massively in about 1-3 years from now)
8. Switches that make certain appliances work when there is solar power supply, such as fridge and water pumps, and that switch off when there is no solar power supply (with over-ride options)
9. Wiring must enable air conditioners in all bedrooms, minimally, and in the main downstairs sitting room, even if aircos may not be installed immediately
10. Wiring must enable ceiling fans in every room
11. Wiring must enable automatic switches (sensors) so that lights switch off when nobody in room, and external lighting on veranda and over main and side gates with motion activated sensors
12. All lights should be LED
13. Wiring must enable electric cooking / oven even though gas cooker may be installed
14. If cavity walls then wiring must be between the two (brick) walls,
15. Wiring must enable fans and other small appliances in the outdoor sitting areas, also around the pool (which may be built later)
0/5000
Từ: -
Sang: -
Kết quả (Việt) 1: [Sao chép]
Sao chép!
Electricity1. Thunderstorm risk: need sufficient lightning rods that are away from solar PV panels and various wiring systems2. Mains wiring needs to be through pipes across the house that are separate from water supply and drainage pipes; main electricity pipes / boxes must be accessible3. Wiring must enable solar PV supply as well as public power supply4. One solar system for 2 houses will save investment cost / kWh (especially because of inverter)– this requires the property to have just one connection to the public grid – but with sub metering for each house5. Solar PV must be positioned on the most favourable roof(s) from analysis of the position of the sun through the year and the expected sunshine / season but considering aesthetics6. Inverter of solar PV system must be in a ventilated space7. Solar PV system must be designed so that it can include a small set of batteries for back-up (battery prices and quality are expected to improve massively in about 1-3 years from now)8. Switches that make certain appliances work when there is solar power supply, such as fridge and water pumps, and that switch off when there is no solar power supply (with over-ride options)9. Wiring must enable air conditioners in all bedrooms, minimally, and in the main downstairs sitting room, even if aircos may not be installed immediately10. Wiring must enable ceiling fans in every room11. Wiring must enable automatic switches (sensors) so that lights switch off when nobody in room, and external lighting on veranda and over main and side gates with motion activated sensors12. All lights should be LED13. Wiring must enable electric cooking / oven even though gas cooker may be installed14. If cavity walls then wiring must be between the two (brick) walls,15. Wiring must enable fans and other small appliances in the outdoor sitting areas, also around the pool (which may be built later) Walls1. Consider cavity walls (cavity walls will cost more)2. Consider various types of bricks without cement rendering, which requires very skilful bricklayers and smart electricians / wiring designers3. Consider cement walls if /where no “raw” bricks (without “matit” that makes all smooth but is not water resistant)4. Water proofing of bathroom walls up to at least 1.5 m high, even if tradition is perhaps 10-20 cm5. Consider both outside and inside water proofing of ground floor walls, also 1.5 m high Foundation1. Flood proofing: the house should be built on raised ground (though the foundation goes into the ground), with the ground floor level about 1 meter above the current garden level, which is somewhat higher than the ground floors of the newest houses that were built and are being built in this neighbourhood2. Local tradition is pillars below all designed walls (corners) of 1-2 deep, that are based on a reinforced concrete slab of about 1 m2, leading to perhaps 10-20 pillars and m2 of foundation (=what the whole house rests on). Alternative is to make one “stiff” flat foundation of reinforced concrete, which is more expensive but would essentially be like a raft “floating” in the deep mud, meaning that even if it tilts a bit the house will not crack3. Consider whether to put some of the water storage tanks under the house(s), or not (foundation should be quite deep, but house should be quite high and these tanks would be above the foundation and below the ground floor and should not leak at all, ever)4. Consider a (wine) cellar in the cavity between foundation and ground floor, as the temperature will be relatively low and constant Technical checklist Water drainage and supply1. Rainwater drainage to rice fields in front through pipe under the road: size?, connect to concrete system after construction (now earth ditches)2. Waste water drainage to community? Where is pipe if any? how do the neighbours handle waste water drainage? Are there septic tanks at the neighbouring properties? Two separate septic tanks with overflow to existing system (if there is?)3. Waste water filter at each property, with grey water for garden, possibly to flush toilets4. Rainwater capture requires gutters below every roof, which influences the aesthetics and requires creative options – many roofs in Hoi An do not have gutters or rudimentary ones only5. Rainwater storage to be kept for garden, possibly after a filter also for household supply (backup) or into grey water system for toilet flushing? Rainwater stored underground (with suitable overflow) requires a pump to upper grey water tank.6. Rainwater drainage (overflow) separate from un-filtered waste water drainage7. Public water supply tank under each house, or in the garden8. Each house a water supply tank in the loft, with pump9. Shower and kitchen sink drainage separate from toilet? (to water filter, into grey water supply system with overflow into public drainage, and to septic tank respectively)10. Pipes under bathrooms included in the concrete floor slabs, instead of below it11. Supply and drainage pipes in piping cases that are accessible, and that are separate from power supply pipes with wires12. Double water supply piping to allow for solar hot water heaters for each house13. Supply pipes that include valves to close off separate parts of the system - agree14. Solar water heaters must be positioned on the most favourable roofs but considering aesthetics15. Add electric “boosters” to solar hot water system for winter period16. Ensure that underground water tanks (public supply, grey water storage, rainwater storage, septic tank) are duly separated with no possibility for mixing of the water)17. A simple irrigation system that uses grey water / rainwater through the garden; it must be possible to also connect the mains water system in case of severe drought / water shortage18. Clean water supply and waste water drainage also at the outdoor sitting area; an outside toilet, shower and hand basin adjacent to pool is needed Electricity1. Thunderstorm risk: need sufficient lightning rods that are away from solar PV panels and various wiring systems2. Mains wiring needs to be through pipes across the house that are separate from water supply and drainage pipes; main electricity pipes / boxes must be accessible3. Wiring must enable solar PV supply as well as public power supply4. One solar system for 2 houses will save investment cost / kWh (especially because of inverter)– this requires the property to have just one connection to the public grid – but with sub metering for each house5. Solar PV must be positioned on the most favourable roof(s) from analysis of the position of the sun through the year and the expected sunshine / season but considering aesthetics6. Inverter of solar PV system must be in a ventilated space7. Solar PV system must be designed so that it can include a small set of batteries for back-up (battery prices and quality are expected to improve massively in about 1-3 years from now)8. Switches that make certain appliances work when there is solar power supply, such as fridge and water pumps, and that switch off when there is no solar power supply (with over-ride options)9. Wiring must enable air conditioners in all bedrooms, minimally, and in the main downstairs sitting room, even if aircos may not be installed immediately10. Wiring must enable ceiling fans in every room
11. Wiring must enable automatic switches (sensors) so that lights switch off when nobody in room, and external lighting on veranda and over main and side gates with motion activated sensors
12. All lights should be LED
13. Wiring must enable electric cooking / oven even though gas cooker may be installed
14. If cavity walls then wiring must be between the two (brick) walls,
15. Wiring must enable fans and other small appliances in the outdoor sitting areas, also around the pool (which may be built later)
đang được dịch, vui lòng đợi..
Kết quả (Việt) 2:[Sao chép]
Sao chép!
Điện
1. Nguy cơ Dông: cần đủ thu lôi mà là đi từ các tấm pin mặt trời và hệ thống dây điện khác nhau
2. Mains dây cần phải được thông qua đường ống trên các ngôi nhà được tách biệt với cấp nước và thoát nước đường ống; Ống điện chính / hộp phải được tiếp cận
3. Lắp ráp phải cho phép cung cấp điện mặt trời cũng như nguồn điện công cộng
4. Một hệ thống năng lượng mặt trời cho 2 nhà đầu tư sẽ tiết kiệm chi phí / kWh (đặc biệt là bởi vì các biến tần) - điều này đòi hỏi phải có tài sản để có chỉ là một kết nối vào lưới điện chung - nhưng với phụ đo cho mỗi ngôi nhà
5. Solar PV phải được đặt trên mái nhà thuận lợi nhất (s) từ phân tích của các vị trí của mặt trời thông qua các năm và ánh nắng mặt trời / mùa dự kiến nhưng xem xét thẩm mỹ
6. Biến tần của hệ thống điện mặt trời phải ở trong một không gian thông thoáng
7. Hệ thống điện mặt trời phải được thiết kế để nó có thể bao gồm một tập hợp nhỏ của pin cho back-up (giá pin và chất lượng được dự kiến sẽ cải thiện một cách ồ ạt trong khoảng 1-3 năm kể từ bây giờ)
8. Thiết bị chuyển mạch mà làm cho các thiết bị nhất định làm việc khi có nguồn cung cấp năng lượng mặt trời, chẳng hạn như tủ lạnh và máy bơm nước, và tắt khi không có nguồn cung cấp năng lượng mặt trời (với hơn đi xe tùy chọn)
9. Dây phải bật điều hòa không khí trong tất cả các phòng ngủ, tối thiểu, và trong phòng ở tầng dưới ngồi chính, thậm chí nếu aircos có thể không được cài đặt ngay lập tức
10. Dây phải bật quạt trần trong mỗi phòng
11. Dây phải bật công tắc tự động (cảm biến) để tắt đèn khi không có ai trong phòng và ánh sáng bên ngoài vào hiên và qua cửa khẩu chính và phụ với chuyển động cảm biến kích hoạt
12. Tất cả các đèn nên LED
13. Lắp ráp phải cho phép nấu ăn điện / lò mặc dù bếp ga có thể được cài đặt
14. Nếu tường khoang sau đó nối dây phải có từ hai (gạch) bức tường,
15. Lắp ráp phải cho phép người hâm mộ và các thiết bị nhỏ khác trong khu vực ngồi ngoài trời, còn xung quanh hồ bơi (có thể được xây dựng sau) Walls 1. Hãy xem xét những bức tường khoang (tường khoang sẽ có giá hơn) 2. Hãy xem xét nhiều loại gạch mà không cần vẽ xi măng, trong đó yêu cầu thợ nề rất khéo léo và thợ điện thông minh / nhà thiết kế hệ thống dây điện 3. Hãy xem xét những bức tường xi măng nếu / nơi không có gạch "thô" (không có "matit" mà làm cho tất cả mịn nhưng không có khả năng chống nước) 4. Chống nước của bức tường phòng tắm lên tới ít nhất 1,5 m cao, thậm chí nếu truyền thống có lẽ là 10-20 cm 5. Hãy xem xét cả bên ngoài và bên trong chống thấm nước của tường tầng trệt, còn 1,5 m cao Foundation 1. Lũ đinh: ngôi nhà phải được xây dựng trên mặt đất nâng lên (mặc dù các nền tảng đi vào lòng đất), với tầng trệt khoảng 1 mét trên mực vườn hiện nay, trong đó có phần cao hơn so với tầng trệt của căn nhà mới được xây dựng và đang được xây dựng quanh khu vực này 2. Truyền thống của địa phương là trụ cột dưới đây tất cả các bức tường được thiết kế (góc) 1-2 sâu, được dựa trên một phiến bê tông cốt thép khoảng 1 m2, dẫn đến có lẽ 10-20 m2 trụ cột và móng (= gì cả ngôi nhà nghỉ trên) . Thay thế là làm cho một "cứng" nền tảng phẳng bê tông cốt thép, mà là tốn kém hơn nhưng về cơ bản sẽ giống như một chiếc bè "nổi" trong bùn sâu, có nghĩa là thậm chí nếu nó nghiêng một chút ngôi nhà sẽ không bị nứt 3. Xem xét có nên đưa một số các bể chứa nước dưới nhà (s), hoặc không (móng nên được khá sâu, nhưng ngôi nhà nên được khá cao và những thùng này sẽ được ở trên các nền tảng và dưới tầng trệt và không nên bị rò rỉ tại tất cả, bao giờ) 4. Hãy xem xét một (rượu) hầm trong khoang giữa móng và tầng trệt, khi nhiệt độ sẽ tương đối thấp và không đổi danh sách kiểm tra kỹ thuật thoát nước và cung cấp 1. Thoát nước mưa để ruộng lúa ở phía trước thông qua đường ống dưới đường: kích thước ?, kết nối với hệ thống bê tông sau khi xây dựng (nay là mương đất) 2. Xử lý chất thải thoát nước cho cộng đồng? Trường hợp đường ống là nếu có? làm thế nào để những người hàng xóm xử lý thoát nước thải? Có bể phốt tại các thuộc tính lân cận? Hai bể tự hoại riêng biệt với tràn vào hệ thống hiện tại (nếu có?) 3. Xử lý chất thải lọc nước tại mỗi tài sản, với nước màu xám cho khu vườn, có thể để tuôn ra nhà vệ sinh 4. Chụp Rainwater yêu cầu máng nước bên dưới mỗi mái nhà, mà ảnh hưởng đến thẩm mỹ và yêu cầu tùy chọn sáng tạo - nhiều mái nhà ở Hội An không có máng xối hoặc những thô sơ chỉ 5. Lưu trữ nước mưa để được giữ cho khu vườn, có thể sau khi một bộ lọc cũng cung cấp các hộ gia đình (backup) hoặc vào hệ thống nước xám cho nhà vệ sinh xả nước? Nước mưa ngầm lưu trữ (với tràn phù hợp) đòi hỏi một máy bơm để ngăn chứa nước màu xám phía trên. 6. Thoát nước mưa (overflow) tách biệt với thoát nước thải un-lọc 7. Bể cấp nước công cộng theo từng ngôi nhà, hoặc trong vườn 8. Mỗi nhà một bể cấp nước trong loft, với máy bơm 9. Vòi hoa sen và bồn rửa nhà bếp thoát nước riêng biệt từ nhà vệ sinh? (để lọc nước, hệ thống cấp nước thành màu xám với tràn vào hệ thống thoát nước công cộng, và bể tự hoại tương ứng) 10. Ống dưới phòng tắm bao gồm trong các tấm sàn bê tông, thay vì dưới nó 11. Ống cấp và thoát nước trong trường hợp đường ống có thể truy cập, và được tách biệt khỏi đường ống cung cấp điện với dây 12. Đôi nguồn cung cấp nước đường ống để cho phép năng lượng mặt trời máy nước nóng nóng cho mỗi nhà 13. Ống cấp bao gồm các van để đóng tắt các bộ phận riêng biệt của hệ thống - đồng ý 14. Máy nước nóng năng lượng mặt trời phải được đặt trên những mái nhà thuận lợi nhất nhưng xem xét thẩm mỹ 15. Thêm điện "tên lửa đẩy" để năng lượng mặt trời hệ thống nước nóng cho thời gian mùa đông 16. Đảm bảo rằng hầm hố nước (cung cấp công cộng, trữ nước màu xám, lưu trữ nước mưa, bể phốt) là hợp lệ tách biệt với không có khả năng để pha trộn của các nước) 17. Một hệ thống tưới tiêu đơn giản có sử dụng nước xám / nước mưa qua khu vườn; nó phải được thể cũng để kết nối các hệ thống đường ống nước trong trường hợp thiếu hụt hạn hán / nước nặng 18. Cung cấp nước sạch và thoát nước thải cũng tại khu vực ngồi ngoài trời; một nhà vệ sinh bên ngoài, vòi hoa sen và tay lưu vực tiếp giáp với hồ bơi là cần thiết Điện 1. Nguy cơ Dông: cần đủ thu lôi mà là đi từ các tấm pin mặt trời và hệ thống dây điện khác nhau 2. Mains dây cần phải được thông qua đường ống trên các ngôi nhà được tách biệt với cấp nước và thoát nước đường ống; Ống điện chính / hộp phải được tiếp cận 3. Lắp ráp phải cho phép cung cấp điện mặt trời cũng như nguồn điện công cộng 4. Một hệ thống năng lượng mặt trời cho 2 nhà đầu tư sẽ tiết kiệm chi phí / kWh (đặc biệt là bởi vì các biến tần) - điều này đòi hỏi phải có tài sản để có chỉ là một kết nối vào lưới điện chung - nhưng với phụ đo cho mỗi ngôi nhà 5. Solar PV phải được đặt trên mái nhà thuận lợi nhất (s) từ phân tích của các vị trí của mặt trời thông qua các năm và ánh nắng mặt trời / mùa dự kiến nhưng xem xét thẩm mỹ 6. Biến tần của hệ thống điện mặt trời phải ở trong một không gian thông thoáng 7. Hệ thống điện mặt trời phải được thiết kế để nó có thể bao gồm một tập hợp nhỏ của pin cho back-up (giá pin và chất lượng được dự kiến sẽ cải thiện một cách ồ ạt trong khoảng 1-3 năm kể từ bây giờ) 8. Thiết bị chuyển mạch mà làm cho các thiết bị nhất định làm việc khi có nguồn cung cấp năng lượng mặt trời, chẳng hạn như tủ lạnh và máy bơm nước, và tắt khi không có nguồn cung cấp năng lượng mặt trời (với hơn đi xe tùy chọn) 9. Dây phải bật điều hòa không khí trong tất cả các phòng ngủ, tối thiểu, và trong phòng ở tầng dưới ngồi chính, thậm chí nếu aircos có thể không được cài đặt ngay lập tức 10. Dây phải bật quạt trần trong mỗi phòng 11. Dây phải bật công tắc tự động (cảm biến) để tắt đèn khi không có ai trong phòng và ánh sáng bên ngoài vào hiên và qua cửa khẩu chính và phụ với chuyển động cảm biến kích hoạt 12. Tất cả các đèn nên LED 13. Lắp ráp phải cho phép nấu ăn điện / lò mặc dù bếp ga có thể được cài đặt 14. Nếu tường khoang sau đó nối dây phải có từ hai (gạch) bức tường, 15. Lắp ráp phải cho phép người hâm mộ và các thiết bị nhỏ khác trong khu ngồi ngoài trời, còn xung quanh hồ bơi (có thể được xây dựng sau)



















































đang được dịch, vui lòng đợi..
 
Các ngôn ngữ khác
Hỗ trợ công cụ dịch thuật: Albania, Amharic, Anh, Armenia, Azerbaijan, Ba Lan, Ba Tư, Bantu, Basque, Belarus, Bengal, Bosnia, Bulgaria, Bồ Đào Nha, Catalan, Cebuano, Chichewa, Corsi, Creole (Haiti), Croatia, Do Thái, Estonia, Filipino, Frisia, Gael Scotland, Galicia, George, Gujarat, Hausa, Hawaii, Hindi, Hmong, Hungary, Hy Lạp, Hà Lan, Hà Lan (Nam Phi), Hàn, Iceland, Igbo, Ireland, Java, Kannada, Kazakh, Khmer, Kinyarwanda, Klingon, Kurd, Kyrgyz, Latinh, Latvia, Litva, Luxembourg, Lào, Macedonia, Malagasy, Malayalam, Malta, Maori, Marathi, Myanmar, Mã Lai, Mông Cổ, Na Uy, Nepal, Nga, Nhật, Odia (Oriya), Pashto, Pháp, Phát hiện ngôn ngữ, Phần Lan, Punjab, Quốc tế ngữ, Rumani, Samoa, Serbia, Sesotho, Shona, Sindhi, Sinhala, Slovak, Slovenia, Somali, Sunda, Swahili, Séc, Tajik, Tamil, Tatar, Telugu, Thái, Thổ Nhĩ Kỳ, Thụy Điển, Tiếng Indonesia, Tiếng Ý, Trung, Trung (Phồn thể), Turkmen, Tây Ban Nha, Ukraina, Urdu, Uyghur, Uzbek, Việt, Xứ Wales, Yiddish, Yoruba, Zulu, Đan Mạch, Đức, Ả Rập, dịch ngôn ngữ.