• Provide all equipment schedules, calculations and other information as required to
owners, H.I.T.S. and T & C Team.
• Prior to initiation of production information/tendering documents, coordination
meetings shall take place to confirm and ensure design intent is understood and precontract
• Final determination of all vertical/horizontal shaft openings required for mechanical,
electrical and plumbing equipment, in coordination with the relevant Building
Consultants (Architects, Interior Designers, Landscape Consultants, Lighting
Consultants, etc.). Identify potential conflicts.
• If detail design has deviation from approved preliminary design, comparison table
with reason of change should be submitted to H.I.T.S. for review.
• Provide updated budget and identify long lead items.
• Attend periodic coordination meetings.
• Prepare the made-up MEP drawings