If the supporting width of the entire cargo available exceeds 3.0 m, they can be self-loaded andself-unloaded. In self-loading, the shelf of the cargo available will be firstly overhead to about 1,090 mm of the height of cargo floor of the trailer; the platform shall be lowered and the truck enters under the overwide cargo through going astern; then the platform is ascended to transfer the weight of the goods from the support to the trailer and the self-loading process is finished; the self-discharging can be made through the opposing steps.
đang được dịch, vui lòng đợi..
