INSTRUCTIONS AND CHECK REINFORCED FRAMEI/General regulations:All steel types when used also to ensure new, quality certification certificate and have been checked, enter the repository.Reinforced frame must satisfy the requirements of the design drawings Previous to machining steel surfaces clean, mud, grease does not Flake and don't scar cleft.II/reinforced frame fabrication instructions:1. Cut the steel: Steel cut according to size with scissors, shears, power plus size according to the drawing.2. Bend the belt: Depending on the type of drain, workers used steel belt bending table nest to bend the belt according to the size of the drawing. Steel belt after being finished bending will be separated according to each type.3. Fabrication of reinforced frames: Seamless vertical belt of steel columns, the distance between the belt according to the design drawings. Use a 1 mm steel link belts with steel reinforced steel. Termites forcing staggered vertically in different columns.II/reinforced frame test instructions: -Check the surface clean not sticky mud. -Check the longitudinal force: enough, link-Check the distance between the rings false reinforced frame allows + 2 mm-Check the wrong length allowing + 5 mm - APPROVAL
đang được dịch, vui lòng đợi..
