BORING PILE HOLES
Shaft boring for piles commencing at the existing ground levels including supplying, handling, transporting, pitching, driving and withdrawing temporary pile casing and bentonite slurry, and subsequently removal of temporary pile casing, and clearing waste and sand or suitable excavated material filling, disposal excavated materials to a dump provided by the Contractor and approved by the Engineer.

Total length of pile shaft measured from existing ground level to pile toe level.

For piles type ZH1a, D800mm; 66nos
For piles type ZH2, D1000mm; 926nos
For piles type ZH2a, D1000mm; 20nos

TEST PILE

SONIC LOGGING TESTING
Allow for providing all necessary equipment, materials, labour and supervision for executing SONIC LOGGING TESTING including preparing pile head, etc. as described.
Providing all necessary equipments, materials, labour and supervision for carrying out the test.
Remove testing equipment from the site on completion of testing.

Carrying out Sonic Logging Test of completed bored piles in accordance with Specification and Engineer instructions
Sonic logging test

Sundries
Submitting piling records duly signed by the Contractor and the Engineer as the work proceeds
Piling records in triplicate of all piles installed

Preparation and submission of all piling test reports
Piling test reports in triplicate for each type of test

Filling grouting
Filling grouting in sonic pile
0/5000
Từ: -
Sang: -
Kết quả (Việt) 1: [Sao chép]
Sao chép!
KHOAN CỌC LỖTrục nhàm chán cho cọc bắt đầu ở mức mặt đất hiện có bao gồm việc cung cấp, xử lý, vận chuyển, bày, lái xe và thu hồi tạm thời đống vỏ và bentonit bùn, và sau đó loại bỏ tạm thời đống vỏ, và làm sạch các chất thải và cát hoặc thích hợp vật liệu khai quật đã làm thủ tục, xử lý đã khai quật các vật liệu đến một bãi chứa cung cấp bởi các nhà thầu và được chấp thuận bởi các kỹ sư.Tổng chiều dài cọc trục đo từ mặt đất hiện có cọc cấp độ ngón chân.Cho cọc loại ZH1a, D800mm; 66nosCho cọc loại ZH2, D1000mm; 926nosCho cọc loại ZH2a, D1000mm; 20nosTHỬ NGHIỆM ĐỐNGÂM THANH ĐĂNG NHẬP THỬ NGHIỆMCho phép cho việc cung cấp tất cả các thiết bị cần thiết, vật liệu, lao động và các giám sát để thực hiện âm thanh đăng nhập thử nghiệm bao gồm chuẩn bị đầu cọc, vv như được mô tả.Cung cấp tất cả các thiết bị cần thiết, vật liệu, lao động và các giám sát để thực hiện các bài kiểm tra.Loại bỏ thiết bị phân tích từ các trang web khi kết thúc thử nghiệm.Thực hiện các bài kiểm tra âm cọc hoàn thành phù hợp với đặc điểm kỹ thuật và kỹ sư hướng dẫn và đăng nhậpÂm thanh đăng nhập thử nghiệmTạp hóaĐệ trình xi măng đất hồ sơ hợp lệ chữ ký của nhà thầu và kỹ sư như công việc tiền thu đượcĐóng hồ sơ trong triplicate kéo cọc lên tất cả cài đặtChuẩn bị và nộp hồ sơ của tất cả các báo cáo thử nghiệm đóng cọcĐóng kiểm tra báo cáo trong triplicate đối với từng loại thử nghiệmLàm đầy vữaLàm đầy vữa trong đống âm
đang được dịch, vui lòng đợi..
Kết quả (Việt) 2:[Sao chép]
Sao chép!
BORING PILE HOLES
Shaft boring for piles commencing at the existing ground levels including supplying, handling, transporting, pitching, driving and withdrawing temporary pile casing and bentonite slurry, and subsequently removal of temporary pile casing, and clearing waste and sand or suitable excavated material filling, disposal excavated materials to a dump provided by the Contractor and approved by the Engineer.

Total length of pile shaft measured from existing ground level to pile toe level.

For piles type ZH1a, D800mm; 66nos
For piles type ZH2, D1000mm; 926nos
For piles type ZH2a, D1000mm; 20nos

TEST PILE

SONIC LOGGING TESTING
Allow for providing all necessary equipment, materials, labour and supervision for executing SONIC LOGGING TESTING including preparing pile head, etc. as described.
Providing all necessary equipments, materials, labour and supervision for carrying out the test.
Remove testing equipment from the site on completion of testing.

Carrying out Sonic Logging Test of completed bored piles in accordance with Specification and Engineer instructions
Sonic logging test

Sundries
Submitting piling records duly signed by the Contractor and the Engineer as the work proceeds
Piling records in triplicate of all piles installed

Preparation and submission of all piling test reports
Piling test reports in triplicate for each type of test

Filling grouting
Filling grouting in sonic pile
đang được dịch, vui lòng đợi..
 
Các ngôn ngữ khác
Hỗ trợ công cụ dịch thuật: Albania, Amharic, Anh, Armenia, Azerbaijan, Ba Lan, Ba Tư, Bantu, Basque, Belarus, Bengal, Bosnia, Bulgaria, Bồ Đào Nha, Catalan, Cebuano, Chichewa, Corsi, Creole (Haiti), Croatia, Do Thái, Estonia, Filipino, Frisia, Gael Scotland, Galicia, George, Gujarat, Hausa, Hawaii, Hindi, Hmong, Hungary, Hy Lạp, Hà Lan, Hà Lan (Nam Phi), Hàn, Iceland, Igbo, Ireland, Java, Kannada, Kazakh, Khmer, Kinyarwanda, Klingon, Kurd, Kyrgyz, Latinh, Latvia, Litva, Luxembourg, Lào, Macedonia, Malagasy, Malayalam, Malta, Maori, Marathi, Myanmar, Mã Lai, Mông Cổ, Na Uy, Nepal, Nga, Nhật, Odia (Oriya), Pashto, Pháp, Phát hiện ngôn ngữ, Phần Lan, Punjab, Quốc tế ngữ, Rumani, Samoa, Serbia, Sesotho, Shona, Sindhi, Sinhala, Slovak, Slovenia, Somali, Sunda, Swahili, Séc, Tajik, Tamil, Tatar, Telugu, Thái, Thổ Nhĩ Kỳ, Thụy Điển, Tiếng Indonesia, Tiếng Ý, Trung, Trung (Phồn thể), Turkmen, Tây Ban Nha, Ukraina, Urdu, Uyghur, Uzbek, Việt, Xứ Wales, Yiddish, Yoruba, Zulu, Đan Mạch, Đức, Ả Rập, dịch ngôn ngữ.

Copyright ©2024 I Love Translation. All reserved.

E-mail: