1. How long is the time constraint of below process? Phylon UV priming to cementing for s/b primer? 4 Week Maximum (must be bagged well) Outsole/Cupsole chlorinates priming to cementing? 24 hours maximum Outsole/Cupsole degreasing to chlorinate priming? 5 hours maximum2. How should chemical empty container be handled in adhesive storage and preparation room? Empty cans or containers are automatically removed; no hang ups left; cover and labels are kept. 3. Please mention 3 things that should be checked in degreaser machine regularly. + Temperature and pH of the tanks. + Last time chemicals are replenished or re-charged. + Cleaning of separator filter.4. Why must rubber parts be thoroughly dried after degreasing prior to chlorinate priming? Avoid standing water in rubber surface for bonding 5. Name 5 key points that should be checked in rubber priming process.+ Chlorinating agent is mixed accordance with manufacturer requirements+ Pot life of primer is maintained+ Primer is done within 5 hours after degreasing.+ Primer is applied properly to all bonding areas.+ Primed outsole is transferred to stock fit line and cemented Within 24 hours 6. What is the purpose of Phylon warm water washing process?Phylon Have to clean on the Phylon surface to make sure UV primer attached stronger so that prevent Bonding gap. To remove processing contaminants from the phylon surface in readiness for UV treatment.
đang được dịch, vui lòng đợi..