Arab Republic of Egypt
Cabinet of Ministers
Ministry of State for Environmental Affairs
Egyptian Environmental Affairs Agency EEAA
Environmental Management Sector
Environmental Impact Assessment
Guidelines
for
Cement Manufacturing Plants
January 2005
2 OSP
TABLE OF CONTENTS:
1 INTRODUCTION 4
2 OBJECTIVE OF THE ENVIRONMENTAL IMPACT ASSESSMENT 4
3 THE EIA PROCESS 4
4 GUIDELINES FOR THE EIA REPORT 5
A. Non Technical Executive Summary 5
B. Description of the Proposed Industrial Development 6
B.1 Objectives and Scope of the Proposal 6
B.2 The Location 6
B.3 Detailed Description and Layout of the Proposed Industrial Development and Associated
Facilities 6
B.4 Site Preparation and Construction 8
B.5 Existing Development in the Locality 8
C Background Information 9
C.1 Legislative Framework 9
C.2 Method 9
C.3 Consultation 9
D. Description of the Existing Environment – the Baseline 10
D.1 Overview 10
D.2 Land Characteristics and Use 10
D.3 Landscape Character and Existing Views 11
D.4 Flora and Fauna 11
D.5 Water Including Hydrology, Groundwater and Water Quality 11
D.6 Air Quality 11
D.7 Noise Levels 12
D.8 Antiquities and Other Sites of Historical and Cultural Importance 12
D.9 Social and Economic Context 12
D.10 Existing Transport Infrastructure and Traffic Flows 12
D.11 Existing Utilities Infrastructure and Usage 13
E. Prediction of Impacts and Evaluation of Significant Environmental Effects 13
E.1 Basic Methodology 13
E.2 Landtake 14
E.3 Construction Works 14
E.4 Economic Impacts During Construction 15
E.5 Economic Impacts During Operation 15
E.6 Dust 16
E.7 Gaseous Emissions to Air 17
E.8 Emissions to Water 18
E.9 Waste Disposal 19
E.10 Noise 19
E.11 Traffic 19
E.12 Services and Infrastructure 20
E.13 Risk Assessment 20
F. Mitigation 21
F.1 Mitigation Strategy 21
3 OSP
F.2 Specific Mitigation Measures 21
F.3 Environmental Management Plan 22
G. Conclusions 23