The power system shall be equipped with automatic load shedding or other automatic means to preventsustained overload of any generator, ref. G101.— Where the electrical power is normally supplied by one generator provision shall be made, upon loss of power, for automatic starting and connecting to the main switchboard of standby generator(s) of sufficient capacity, and automatic restarting of the essential auxiliaries, in sequential operation if required. Starting and connection to the main switchboard of the standby generator is to be preferably within 30 seconds, but in any case not more than 45 seconds, after loss of power. Either restart of the previous running auxiliary, or start of a standby auxiliary system is accepted.
đang được dịch, vui lòng đợi..