• Purpose of the well: A given well may serve any one of several diffe dịch - • Purpose of the well: A given well may serve any one of several diffe Việt làm thế nào để nói

• Purpose of the well: A given well

• Purpose of the well: A given well may serve any one of several different functions— production, injection, exploration, or workover—and the well design will be influenced by its purpose. For example, an exploration well might be of smaller diameter than one intended for production and, because it might be scheduled for abandonment once the reservoir is characterized, it might also be completed with less attention to the well’s longevity (different cement, casing material, or the like.) Some considerations for hole diameter in small exploration wells, or “slimholes” are described below under Rig Selection.
• Surface or shallow hole conditions: High, shallow temperatures or geothermal surface manifestations may require setting the surface casing too shallow, complicate the well design, and require more strings of casing to mitigate well control risks. An alternate location with directional drilling to the target is one option to avoid these shallow hazards. If the surface conditions are unknown, it may be cost effective to drill a small- diameter pilot hole to determine the surface conditions, rather than having to move the hole location after a larger rig and drill pad have been installed.
• Reservoir conditions: It is extremely useful to know as much as possible about the prospective reservoir; such information might come from previous temperature and pressure logs in offset wells, nearby thermal gradient holes, or geophysical information. Clearly, temperature and pressure are crucial, but brine chemistry is also very important because it can have a major impact on casing selection and cost.
• Logistical requirements: It is common that, for reasons including the lease, a power sales contract, other financing requirements, or even weather, a drilling project must be completed on a given schedule. If this is the case, it can complicate planning because of factors ranging from drill rig availability to acquisition of the necessary permits. It is also more or less a standard condition that any lease site will have regulatory stipulations that affect drilling fluid disposal, cuttings disposal, possibly water supply, and even air- quality requirements that may necessitate emissions control on the rig’s engines. The well planner has little recourse in dealing with these factors, but it is certainly essential to consider them in the planning process.
• Likely problems in drilling: Experience in similar wells or general knowledge of the reservoir can sometimes offer a prediction of what problems may be encountered in

drilling the well. If this knowledge is available it will guide the preparations in many ways: having lost circulation material for underpressured formations; appropriate drilling fluid additives for corrosive brines or for exceptionally high temperatures; high- temperature logging or steering tools and drilling motors if those tools will be used in a hot hole; preparation for pressure anomalies (either depleted zones or overpressured formations); and stand-by fishing tools and possibly shock absorbers in the BHA if there is likely to be rough drilling with twist-offs. It may also provide better definition of the best operating envelope (weight on bit, rotary speed, hydraulics) for the bit in specific formations.
• Casing requirements: The heart of well design is the specification of the casing program, which will be discussed in more detail in the following Chapter.
0/5000
Từ: -
Sang: -
Kết quả (Việt) 1: [Sao chép]
Sao chép!
• Purpose of the well: A given well may serve any one of several different functions— production, injection, exploration, or workover—and the well design will be influenced by its purpose. For example, an exploration well might be of smaller diameter than one intended for production and, because it might be scheduled for abandonment once the reservoir is characterized, it might also be completed with less attention to the well’s longevity (different cement, casing material, or the like.) Some considerations for hole diameter in small exploration wells, or “slimholes” are described below under Rig Selection.• Surface or shallow hole conditions: High, shallow temperatures or geothermal surface manifestations may require setting the surface casing too shallow, complicate the well design, and require more strings of casing to mitigate well control risks. An alternate location with directional drilling to the target is one option to avoid these shallow hazards. If the surface conditions are unknown, it may be cost effective to drill a small- diameter pilot hole to determine the surface conditions, rather than having to move the hole location after a larger rig and drill pad have been installed.• Reservoir conditions: It is extremely useful to know as much as possible about the prospective reservoir; such information might come from previous temperature and pressure logs in offset wells, nearby thermal gradient holes, or geophysical information. Clearly, temperature and pressure are crucial, but brine chemistry is also very important because it can have a major impact on casing selection and cost.• Logistical requirements: It is common that, for reasons including the lease, a power sales contract, other financing requirements, or even weather, a drilling project must be completed on a given schedule. If this is the case, it can complicate planning because of factors ranging from drill rig availability to acquisition of the necessary permits. It is also more or less a standard condition that any lease site will have regulatory stipulations that affect drilling fluid disposal, cuttings disposal, possibly water supply, and even air- quality requirements that may necessitate emissions control on the rig’s engines. The well planner has little recourse in dealing with these factors, but it is certainly essential to consider them in the planning process.• Likely problems in drilling: Experience in similar wells or general knowledge of the reservoir can sometimes offer a prediction of what problems may be encountered in drilling the well. If this knowledge is available it will guide the preparations in many ways: having lost circulation material for underpressured formations; appropriate drilling fluid additives for corrosive brines or for exceptionally high temperatures; high- temperature logging or steering tools and drilling motors if those tools will be used in a hot hole; preparation for pressure anomalies (either depleted zones or overpressured formations); and stand-by fishing tools and possibly shock absorbers in the BHA if there is likely to be rough drilling with twist-offs. It may also provide better definition of the best operating envelope (weight on bit, rotary speed, hydraulics) for the bit in specific formations.• Casing requirements: The heart of well design is the specification of the casing program, which will be discussed in more detail in the following Chapter.
đang được dịch, vui lòng đợi..
Kết quả (Việt) 2:[Sao chép]
Sao chép!
• Mục đích của giếng: A cũng có thể phục vụ cho bất kỳ một trong những sản xuất khác nhau functions-, tiêm, thăm dò, hoặc workover và thiết kế cũng sẽ bị ảnh hưởng bởi mục đích của nó. Ví dụ, một giếng thăm dò có thể có đường kính nhỏ hơn một dành cho sản xuất và, vì nó có thể được sắp xếp từ bỏ một khi hồ chứa được đặc trưng, ​​nó cũng có thể được hoàn thành với ít chú ý đến tuổi thọ của giếng (xi măng khác nhau, vật liệu vỏ, . hoặc tương tự) Một số cân nhắc cho đường kính lỗ trong giếng thăm dò nhỏ, hoặc "slimholes" được mô tả dưới đây Rig Selection.
• Bề mặt hoặc lỗ nông điều kiện: cao, nhiệt độ nông hay biểu hiện bề mặt địa nhiệt có thể yêu cầu thiết lập các vỏ bề mặt quá nông cạn, phức tạp thiết kế tốt, và đòi hỏi nhiều dây của vỏ để giảm thiểu rủi ro kiểm soát tốt. Một vị trí thay thế với hướng khoan với mục tiêu là một trong những lựa chọn để tránh những mối nguy hiểm nông. Nếu các điều kiện bề mặt chưa được biết, nó có thể được hiệu quả chi phí để khoan một lỗ có đường kính nhỏ thí điểm để xác định các điều kiện bề mặt, thay vì phải di chuyển vị trí lỗ sau khi một giàn khoan lớn hơn và khoan pad đã được cài đặt.
• Các điều kiện chứa: Nó là cực kỳ hữu ích để biết càng nhiều càng tốt về các hồ chứa tiềm năng; thông tin đó có thể đến từ nhiệt độ trước và các bản ghi áp suất trong giếng bù đắp, gần lỗ Gradient nhiệt, hoặc các thông tin địa vật lý. Rõ ràng, nhiệt độ và áp lực là rất quan trọng, nhưng nước muối hóa học cũng rất quan trọng vì nó có thể có tác động lớn trên vỏ lựa chọn và chi phí.
• Các yêu cầu về mặt hậu cần: Nó được phổ biến rằng, vì lý do bao gồm cả cho thuê, một hợp đồng mua bán điện, tài chính khác yêu cầu, hoặc thậm chí thời tiết, một dự án khoan phải được hoàn thành theo một lịch trình nhất định. Nếu đây là trường hợp, nó có thể làm phức tạp kế hoạch vì các yếu tố khác nhau, từ khả giàn khoan để mua lại các giấy phép cần thiết. Nó cũng là nhiều hơn hoặc ít hơn một điều kiện tiêu chuẩn mà bất kỳ trang web cho thuê sẽ có quy định pháp lý có ảnh hưởng đến khoan xử lý chất lỏng, cắt xử lý, có thể cung cấp nước, và thậm chí cả không khí yêu cầu chất lượng mà có thể đòi hỏi phải kiểm soát lượng khí thải trên các công cụ của giàn khoan. Các kế hoạch cũng có chút tin tưởng trong việc đối phó với những yếu tố này, nhưng nó chắc chắn là cần thiết để xem xét trong quá trình lập kế hoạch.
• Các vấn đề có khả năng khoan: Kinh nghiệm trong các giếng tương tự hoặc kiến thức tổng quát của hồ chứa đôi khi có thể đưa ra một dự đoán về những gì các vấn đề có thể thể gặp phải trong khoan giếng. Nếu kiến thức này là có sẵn, nó sẽ hướng dẫn chuẩn bị bằng nhiều cách: có tài liệu lưu thông bị mất hình underpressured; phụ gia dung dịch khoan thích hợp cho nước mặn ăn mòn hoặc nhiệt độ đặc biệt cao; khai thác gỗ cao nhiệt độ hoặc chỉ đạo các công cụ và động cơ khoan nếu những công cụ này sẽ được sử dụng trong một lỗ nóng; chuẩn bị cho áp lực bất thường (hoặc khu cạn kiệt hoặc hình overpressured); và đứng bởi các công cụ đánh bắt cá và có thể gây sốc hấp thụ trong BHA nếu có khả năng là khoan thô với xoắn-off. Nó cũng có thể cung cấp tốt hơn định nghĩa của phong bì tốt nhất điều hành (trọng lượng trên bit, tốc độ quay, thủy lực) cho các bit trong hình cụ thể. • Các yêu cầu Vỏ bọc: Trái tim của thiết kế cũng là đặc điểm kỹ thuật của chương trình vỏ, sẽ được thảo luận trong chi tiết hơn trong chương sau.



đang được dịch, vui lòng đợi..
 
Các ngôn ngữ khác
Hỗ trợ công cụ dịch thuật: Albania, Amharic, Anh, Armenia, Azerbaijan, Ba Lan, Ba Tư, Bantu, Basque, Belarus, Bengal, Bosnia, Bulgaria, Bồ Đào Nha, Catalan, Cebuano, Chichewa, Corsi, Creole (Haiti), Croatia, Do Thái, Estonia, Filipino, Frisia, Gael Scotland, Galicia, George, Gujarat, Hausa, Hawaii, Hindi, Hmong, Hungary, Hy Lạp, Hà Lan, Hà Lan (Nam Phi), Hàn, Iceland, Igbo, Ireland, Java, Kannada, Kazakh, Khmer, Kinyarwanda, Klingon, Kurd, Kyrgyz, Latinh, Latvia, Litva, Luxembourg, Lào, Macedonia, Malagasy, Malayalam, Malta, Maori, Marathi, Myanmar, Mã Lai, Mông Cổ, Na Uy, Nepal, Nga, Nhật, Odia (Oriya), Pashto, Pháp, Phát hiện ngôn ngữ, Phần Lan, Punjab, Quốc tế ngữ, Rumani, Samoa, Serbia, Sesotho, Shona, Sindhi, Sinhala, Slovak, Slovenia, Somali, Sunda, Swahili, Séc, Tajik, Tamil, Tatar, Telugu, Thái, Thổ Nhĩ Kỳ, Thụy Điển, Tiếng Indonesia, Tiếng Ý, Trung, Trung (Phồn thể), Turkmen, Tây Ban Nha, Ukraina, Urdu, Uyghur, Uzbek, Việt, Xứ Wales, Yiddish, Yoruba, Zulu, Đan Mạch, Đức, Ả Rập, dịch ngôn ngữ.

Copyright ©2024 I Love Translation. All reserved.

E-mail: