STRUCTURAL WORKSDesign & Build for mezzanine floor and staircase structural works by steel system in black paint finishes; Structural Design is required to be confirmed and stamped by certified Structure EngineerSTAIRCASE FINISHING WORKSStaircase finishing works is in compliance with drawing & specifications; Steel Handrail in round section R20mm with chaining fence in black color; laminated step with nosing edge in connection with build in Cabinet with openable doors and Drawer system underneath the staircaseDRY WALLSupply, delivery & installation of feature wall, overall 200mm thick comprising 12mm thick gypsum board, metal frame galvanized steel channel 400mmx600mm, Rockwool insulation density 80kg/m3 including accessories and all necessary connections for completion of the workMANSORY WORKBrick wall 100mm thick behind reception counter as back drop of internal CapitaLand logo with mild steel stiffener including accessories and all necessary connections for completion of the works (plaster & paint tobe measured separately)GLASS PARTITIONSupply, delivery and installation of glass panel with stainless steel supporting frame and accessoriesDiscussion room: 12mm tempered glass panel with stainless steel hardwaresCreative room: 12mm tempered glass panel with stainless steel hardwares and frosted sticker h=900mmPLASTER, PAINTING & COATINGWork to plaster, paint and coatings to include preparation of substrate, protection to other finished items, putty works, applying emulsion painting. The minimum requirement of coating numbers, specification and the thickness of coating shall conform to Painting Manufacturer's recommendation (DULUX or equivalent)Texture paint finishPlaster and White Painting to brick wallsConcrete look alike wall paperLaminate finishConcrete look alike paintCEILINGSExposed ceiling: Work to re-plaster, paint and coatings to include preparation of substrate and protection to other finished items, putty works, applying emulsion painting. The minimum requirement of coating numbers, specification and the thickness of coating shall be conform to the Painting Manufacturer's recommendation (DULUX or equivalent)Ceiling in black paint in mat finishSupply, delivery & installation of false ceiling by 10mm thick calcium silicate board with plaster & paint finishes including accessories and all necessary connections for completion of the workCreative Room: false ceiling in black paintFLOOR FINISHESSupply, delivery and installation of laminated timber flooring 15mm thick in compliance with design and specification.Reception Area & Lounge Area at lower floorSupply, delivery and lay carpet including preparing surface for laying; butt joins, water repellent application, accessories and the like. Works to include wastage, necessary accessories and any sub material to finish it in properly manner such as surface treatment, bonding agents and control joints.Discussion Area at lower floorCreative Area at upper floorDOORSSupply, deliver and install Glass door with SST hardwares (Hafele or equivalent), with supporting frame and accessories compliance with design and specificationCreative Room: Sliding glass door 1.0m(W)x2.0m(H)Supply, delivery and install Timber door with Timber frame; SST hardwares (Hafele or equivalent), laminate finishes, with supporting frame and accessories incompliance with design and specificationStore RoomSIGNAGESupply, delivery & installation of CapitaLand logo with backlit (width 1500mm) on the brick wall backdrop at reception area in compliance with CapitaLand Signage GuidelineAny Others Works to be inserted by the Contractor
đang được dịch, vui lòng đợi..
