Table of ContentsChapter I Project Overview 1Project Description 1Engineering geological condition of the Wind Farm 1Civil construction range 1Chapter II Construction Site Management Organization 3Construction site organization principle 3Responsibility and Division of work 3Chapter III Plane Layout of Construction Site 7Construction plane layout description 7General plane layout of construction site 7General layout of temporary electricity and water used in the construction site 7General layout of fire protection in construction site 7Chapter IV Construction Machinery, Personnel and Land for Temporary Use 8Wind turbine construction machinery scheme description 8Table of Main Construction Machinery and Equipment to be Used in the Section 8Table of Construction Machinery for Wind Turbine Installation 10Table of Instrument and Equipment Proposed to be Used for Testing and Detecting of the Section 10Table of Land for Temporary Use 12Labor Schedule 12Chapter V Road Construction Plan and Construction of Wind Turbine Platform 14Overview of road 14Construction survey and positioning 14Subgrade construction 14Excavation of road trough 14Pavement construction 15Construction of clay-bound macadam pavement 16Culvert engineering 16Construction of wind turbine platform 17Chapter VI Construction Plan of Wind Turbine Foundation 20Overall construction plan 20Fabrication of reinforcement cage 20Installation of reinforcement cage and conduit 20Construction plan of wind turbine foundation 20Lightning protection and earthing 25Chapter VII Substation 26Civil works 26Equipment installation 26Installation plan of transformer 26Method Statement of Cable Work 28Method Statement of Earthing Work 32High-voltage Cable Test Scheme 33Chapter VIII Method Statement of Wind Turbine Installation Work 35On-site Installation Preparation 35On-site Off-loading of wind turbine generator sets 35Installing the hatches 49Installing the blades 65Chapter IX Construction Duration and Schedule 85Construction Duration Planning 85Network Chart of Construction Schedule 86Chapter X Project Organization and Coordination 87Construction coordination 87Chapter XI Special Construction Measures 88Construction measures in rainy season 88Chapter XII Environmental Protection and Water and Soil Conservation 91Environmental protection measures 91Investment in environmental protection 91Water and soil conservation 91
đang được dịch, vui lòng đợi..