SUSPENDED LOOPING COASTER INSTALLATION PLAN














Page number 01 OBJECTIVE INSTALLATION PLAN 3
2 SAFETY RULES 3
3 SEQUENCE OF OPERATION. 4
4 QUALIFICATION FOR SITE WELDERS 13
5 WELDING INSPECTION FOR SITE WELDING 28
6 WELDING PROCEDURES 39
7 PAINT TOUCH UP PROCEDURE 40
8 GROUTING SPECIFICATIONS 49
9 RECOMMENDED TOOLLIST 54
ENCLOSURE: 1 Detail footing column 69
ENCLOSURE: 2 Detail high tension bolt (10.9) torque connection 70
ENCLOSURE: 3 Detail 5’’- railpipe connection 71
ENCLOSURE: 4 sample track connection 72
ENCLOSURE: 5 Indicative overview site-welds 73
ENCLOSURE: 6 Alarm card 74





















SCHAAPWEG 18 6063 BA VLODROP
PO BOX 8006 6060 AA POSTERHOLT THE NETHERLANDS
TEL + 31 (0) 475 – 409222
FAX +31 (0) 475 - 402115
INFO@VEKOMA.COM






















By : M. Graef
Date : March-2016
Revision 9







1. OBJECTIVE INSTALLATION PLAN

This installation plan has been set up to create a guide line for the installation of the Vekoma Suspended Looping Coaster and gives a global description of main items of the preparation before installation and the actual installation of the Suspended Looping Coaster.

This plan together with the knowledge of the local site situation and other local requirements can therefore also be of help during tender of installation activities.

The project installation schedule which is part of this plan states a recommended installation sequence. Subject to site situation, access of cranes and other installation equipment, a custom made installation sequence can be composed in close co-operation between customer, installation contractor and Vekoma.
When the installation sequence has to deviate from the enclosed recommended project installation schedule it is advisable to discuss this in early stage with Vekoma. Fabrication and shipment sequence can then possibly be adjusted in conformity with the required installation sequence.

To discuss further details it can be helpful to have a meeting between customer, Installation Company and Vekoma in view of this plan.


2. SAFETY RULES

All local government and Owner proscribed Safety Rules of the customer and/or country shall be obeyed on the site.
In the absence of specific Safety Rules, the Installation Contractor shall adhere to those rules determined to be necessary by the owner. If the Owner determines Safety Rules in excess of those required by local government for any aspect of the installation Contract, the Installation Contractor shall abide by the Owner’s direction in these regards.
The Vekoma on site supervisor takes care that the minimum safety conditions are being kept for its personnel and advises the Owner and Installation Contractor in regards with Safety on site when necessary. This in conformance with the local rules and the Vekoma Safety Rules which ever are of the highest standard.
The Installation Contractor shall ensure that all of his personnel have the necessary basic and specialized safety equipment that is required by local government and Owner proscribed requirements. These include, but are not limited to safety shoes or boots, safety helmet, safety glasses and/or goggles and safety belts.
The Installation Contractor shall arrange that the Vekoma supervisors have hygienic sanitary facilities (toilets and washrooms), which are cleaned regularly, available close to the site.
In enclosure 5 of this plan an alarm card is enclosed. The owner/general contractor is requested to complete this form and send it to Vekoma Project Manager ultimately 2 weeks before start of installation in order it can be handed over to Vekoma site representatives to have such at hand in case of any emergency.









3. SEQUENCE OF OPERATION

In this chapter the installation of the Suspended Looping Coaster will be described global, following under mentioned headlines:
- Deployment of cranes / installation equipment / installation manpower
- Supply of material / arrangement of the site
- Preparation foundations for installing columns
- Installation of columns and tracks
- Installation of drive / brakes / release / gates
- Installation of stairs and platforms
- welding on site / on site modifications
- Finishing / paint touch up
- Installation electric, pneumatic and hydraulic
- Installation of train
- testing / instructions / commissioning
- Requirements installation labour

Deployment of cranes / installation equipment / installation manpower
- With help of this plan and taking in account the local situation cranes, installation equipment and installation manpower can be arranged. This installation plan is based on the remarks as mentioned in the project installation schedule regarding site situation, equipment, normal weather situation and qualification of manpower.

Supply of material / arrangement of the site
- Before start of installation and during installation of the ride the materials arrive at the jobsite.
To save a lot of paint touch up work afterwards we advis
0/5000
Từ: -
Sang: -
Kết quả (Việt) 1: [Sao chép]
Sao chép!
TREO LOOPING COASTER CÀI ĐẶT KẾ HOẠCH Trang số 01 mục tiêu lắp đặt các kế hoạch 3QUY TẮC AN TOÀN 2 33 CHUỖI CÁC HOẠT ĐỘNG. 4CÁC BẰNG CẤP 4 CHO THỢ HÀN TRANG 135 HÀN THANH TRA CHO TRANG WEB HÀN 28THỦ TỤC 6 HÀN 397 SƠN LIÊN LẠC LÊN THỦ TỤC 40THÔNG SỐ KỸ THUẬT 8 VỮA 499 ĐỀ NGHỊ TOOLLIST 54Bao vây: 1 chi tiết chân cột 69Bao vây: 2 chi tiết cao căng thẳng bolt mô-men xoắn (10,9) kết nối 70Bao vây: 3 chi tiết 5''-railpipe kết nối 71Bao vây: 4 mẫu theo dõi kết nối 72Bao vây: 5 chỉ mang tính tổng quan trang web-mối hàn 73Bao vây: 6 báo thẻ 74 SCHAAPWEG 18 6063 BA VLODROPPO BOX 8006 6060 AA POSTERHOLT HÀ LANTEL + 31 (0) 475-409222FAX + 31 (0) 475-402115INFO@VEKOMA.COM Bởi: M. GraefNgày: Tháng ba-2016Phiên bản 9 1. MỤC TIÊU LẮP ĐẶT KẾ HOẠCHKế hoạch cài đặt này đã được thiết lập để tạo ra một đường dẫn để cài đặt Vekoma treo Looping Coaster và cung cấp cho một mô tả toàn cầu của các mặt hàng chính của việc chuẩn bị trước khi cài đặt và cài đặt thực tế treo Looping Coaster.Kế hoạch này cùng với các kiến thức về tình hình địa phương trang web và các yêu cầu khác của địa phương do đó cũng có thể giúp đỡ trong quá trình đấu thầu của các hoạt động cài đặt.The project installation schedule which is part of this plan states a recommended installation sequence. Subject to site situation, access of cranes and other installation equipment, a custom made installation sequence can be composed in close co-operation between customer, installation contractor and Vekoma.When the installation sequence has to deviate from the enclosed recommended project installation schedule it is advisable to discuss this in early stage with Vekoma. Fabrication and shipment sequence can then possibly be adjusted in conformity with the required installation sequence.To discuss further details it can be helpful to have a meeting between customer, Installation Company and Vekoma in view of this plan.2. SAFETY RULESAll local government and Owner proscribed Safety Rules of the customer and/or country shall be obeyed on the site.In the absence of specific Safety Rules, the Installation Contractor shall adhere to those rules determined to be necessary by the owner. If the Owner determines Safety Rules in excess of those required by local government for any aspect of the installation Contract, the Installation Contractor shall abide by the Owner’s direction in these regards.The Vekoma on site supervisor takes care that the minimum safety conditions are being kept for its personnel and advises the Owner and Installation Contractor in regards with Safety on site when necessary. This in conformance with the local rules and the Vekoma Safety Rules which ever are of the highest standard.The Installation Contractor shall ensure that all of his personnel have the necessary basic and specialized safety equipment that is required by local government and Owner proscribed requirements. These include, but are not limited to safety shoes or boots, safety helmet, safety glasses and/or goggles and safety belts.The Installation Contractor shall arrange that the Vekoma supervisors have hygienic sanitary facilities (toilets and washrooms), which are cleaned regularly, available close to the site.In enclosure 5 of this plan an alarm card is enclosed. The owner/general contractor is requested to complete this form and send it to Vekoma Project Manager ultimately 2 weeks before start of installation in order it can be handed over to Vekoma site representatives to have such at hand in case of any emergency. 3. SEQUENCE OF OPERATIONIn this chapter the installation of the Suspended Looping Coaster will be described global, following under mentioned headlines:- Deployment of cranes / installation equipment / installation manpower- Supply of material / arrangement of the site- Preparation foundations for installing columns- Installation of columns and tracks- Installation of drive / brakes / release / gates- Installation of stairs and platforms- welding on site / on site modifications- Finishing / paint touch up- Installation electric, pneumatic and hydraulic- Installation of train- testing / instructions / commissioning- Requirements installation labourDeployment of cranes / installation equipment / installation manpower- With help of this plan and taking in account the local situation cranes, installation equipment and installation manpower can be arranged. This installation plan is based on the remarks as mentioned in the project installation schedule regarding site situation, equipment, normal weather situation and qualification of manpower.Supply of material / arrangement of the site- Before start of installation and during installation of the ride the materials arrive at the jobsite.To save a lot of paint touch up work afterwards we advis
đang được dịch, vui lòng đợi..
Kết quả (Việt) 2:[Sao chép]
Sao chép!




































TREO looping COASTER KẾ HOẠCH LẮP ĐẶT Trang số 01 KẾ HOẠCH LẮP ĐẶT MỤC TIÊU 3 2 QUY AN TOÀN 3 3 TRÌNH TỰ HOẠT ĐỘNG. 4 4 ĐỦ CHO THỢ HÀN SITE 13 5 HÀN THANH TRA CHO TRANG HÀN 28 6 THỦ TỤC HÀN 39 7 PAINT Touch UP THỦ TỤC 40 8 Thông số kỹ thuật phun vữa 49 9 KHUYẾN TOOLLIST 54 bao vây: 1 Chi tiết thăng bằng cột 69 bao vây: 2 chi tiết căng thẳng cao tia (10.9) mô-men xoắn kết nối 70 bao vây: 3 chi tiết 5 '' - kết nối railpipe 71 bao vây: 4 mẫu kết nối đường 72 bao vây: 5 CHỈ trang web mối hàn tổng quan 73 bao vây: 6 Alarm thẻ 74 SCHAAPWEG 18 6063 BA Vlodrop PO BOX 8006 6060 AA POSTERHOLT HÀ LAN TEL + 31 (0) 475-409.222 FAX +31 (0) 475-402.115 INFO@VEKOMA.COM bởi: M. Graef ngày: March-2016 Revision 9 1. KẾ hOẠCH lẮP đẶT MỤC TIÊU kế hoạch cài đặt này đã được thiết lập để tạo ra một dòng hướng dẫn cho việc cài đặt của Vekoma Bị treo Coaster Looping và đưa ra một mô tả toàn cầu của các hạng mục chính của việc chuẩn bị trước khi cài đặt và cài đặt thực tế của Coaster Looping Bị treo giò. Kế hoạch này cùng với các kiến thức về tình hình trang web của địa phương và yêu cầu địa phương khác có thể do đó cũng được giúp đỡ trong quá trình đấu thầu các hoạt động cài đặt. lịch trình lắp đặt dự án là một phần của kế hoạch này nói một chuỗi cài đặt được đề nghị. Tùy thuộc vào tình hình trang web, truy cập các cần cẩu và các thiết bị lắp đặt khác, một tùy chỉnh thực hiện trình tự cài đặt có thể được bao gồm trong hợp tác chặt chẽ giữa khách hàng, nhà thầu lắp đặt và Vekoma. Khi trình tự cài đặt đã đi chệch khỏi lịch trình lắp đặt dự án đề nghị kèm theo nó là nên thảo luận điều này trong giai đoạn đầu với Vekoma. Chế tạo và trình tự lô hàng có thể sau đó có thể được điều chỉnh phù hợp với trình tự cài đặt cần thiết. Để tiếp tục thảo luận chi tiết về nó có thể hữu ích để có một cuộc họp giữa các khách hàng, Công ty Lắp đặt và Vekoma trong quan điểm của kế hoạch này. 2. AN TOÀN QUY Tất cả các chính quyền địa phương và quy định an toàn chủ bị cấm của khách hàng và / hoặc quốc gia phải được tuân theo trên trang web. Trong trường hợp không quy an toàn cụ thể, các nhà thầu lắp chịu trách nhiệm tuân thủ các quy tắc xác định là cần thiết bởi các chủ sở hữu. Nếu chủ sở hữu quyết định Nội quy an toàn vượt quá những yêu cầu của chính quyền địa phương đối với bất kỳ khía cạnh nào của hợp đồng lắp đặt, Nhà thầu lắp đặt phải tuân theo sự chỉ đạo của chủ sở hữu trong các liên quan. Các Vekoma vào giám thị chăm sóc mà các điều kiện an toàn tối thiểu đang được lưu giữ cho nhân viên của mình và tư vấn cho các nhà thầu Chủ đầu tư và lắp đặt trong liên quan với an toàn trên trang web khi cần thiết. Điều này phù hợp với các quy định của địa phương và các quy tắc an toàn Vekoma đó bao giờ là tiêu chuẩn cao nhất. Nhà thầu lắp chịu trách nhiệm đảm bảo rằng tất cả các nhân viên của mình có các trang thiết bị an toàn cơ bản và chuyên ngành cần thiết mà là yêu cầu của chính quyền địa phương và yêu cầu bị cấm chủ đầu tư. Chúng bao gồm, nhưng không giới hạn an toàn giày hoặc ủng, mũ bảo hiểm an toàn, kính an toàn và / hoặc kính bảo hộ và dây an toàn. Nhà thầu lắp chịu trách nhiệm sắp xếp cho các giám sát viên Vekoma có công trình vệ sinh hợp vệ sinh (nhà vệ sinh và nhà vệ sinh), được làm sạch thường xuyên, gần có sẵn cho các trang web. trong bao vây 5 của kế hoạch này là một thẻ báo động được kèm theo. Các chủ sở hữu / tổng thầu được yêu cầu để hoàn thành mẫu này và gửi nó đến Vekoma Quản lý dự án cuối cùng là 2 tuần trước khi bắt đầu cài đặt để nó có thể được bàn giao cho đại diện trang web Vekoma để có như vậy trong tay trong trường hợp khẩn cấp. 3. TRÌNH TỰ HOẠT ĐỘNG Trong chương này, các cài đặt của Coaster Looping Bị treo giò sẽ được mô tả toàn cầu, sau đây theo tiêu đề được đề cập: - Triển khai các cần cẩu / lắp ​​đặt thiết bị / cài đặt nguồn nhân lực - Cung cấp nguyên liệu / sự sắp xếp của trang web - cơ sở chuẩn bị cho việc lắp đặt cột - Lắp đặt các cột và các bài hát - Lắp đặt ổ đĩa / phanh / phát hành / cửa - Lắp đặt cầu thang và nền tảng - hàn trên trang web / về sửa đổi trang web - Hoàn / sơn chạm lên - Lắp đặt điện, khí nén và thủy lực - Lắp đặt tàu - thử nghiệm / hướng dẫn / vận hành - cài đặt Yêu cầu lao động triển khai cần cẩu / lắp ​​đặt thiết bị / cài đặt nguồn nhân lực - với sự giúp đỡ của các kế hoạch này và dùng trong tài khoản cần cẩu tình hình địa phương, thiết bị lắp đặt và nhân lực lắp đặt có thể được sắp xếp. Kế hoạch cài đặt này được dựa trên những nhận xét ​​như đã đề cập trong kế hoạch lắp đặt dự án liên quan đến tình hình tại chỗ, thiết bị, tình hình thời tiết bình thường và trình độ của nguồn nhân lực. Cung cấp tài liệu / sự sắp xếp của trang web - Trước khi bắt đầu cài đặt và trong quá trình cài đặt của đi xe vật liệu đến công trường. Để tiết kiệm rất nhiều sơn chạm lên làm việc sau đó chúng tôi advis









































































































































đang được dịch, vui lòng đợi..
 
Các ngôn ngữ khác
Hỗ trợ công cụ dịch thuật: Albania, Amharic, Anh, Armenia, Azerbaijan, Ba Lan, Ba Tư, Bantu, Basque, Belarus, Bengal, Bosnia, Bulgaria, Bồ Đào Nha, Catalan, Cebuano, Chichewa, Corsi, Creole (Haiti), Croatia, Do Thái, Estonia, Filipino, Frisia, Gael Scotland, Galicia, George, Gujarat, Hausa, Hawaii, Hindi, Hmong, Hungary, Hy Lạp, Hà Lan, Hà Lan (Nam Phi), Hàn, Iceland, Igbo, Ireland, Java, Kannada, Kazakh, Khmer, Kinyarwanda, Klingon, Kurd, Kyrgyz, Latinh, Latvia, Litva, Luxembourg, Lào, Macedonia, Malagasy, Malayalam, Malta, Maori, Marathi, Myanmar, Mã Lai, Mông Cổ, Na Uy, Nepal, Nga, Nhật, Odia (Oriya), Pashto, Pháp, Phát hiện ngôn ngữ, Phần Lan, Punjab, Quốc tế ngữ, Rumani, Samoa, Serbia, Sesotho, Shona, Sindhi, Sinhala, Slovak, Slovenia, Somali, Sunda, Swahili, Séc, Tajik, Tamil, Tatar, Telugu, Thái, Thổ Nhĩ Kỳ, Thụy Điển, Tiếng Indonesia, Tiếng Ý, Trung, Trung (Phồn thể), Turkmen, Tây Ban Nha, Ukraina, Urdu, Uyghur, Uzbek, Việt, Xứ Wales, Yiddish, Yoruba, Zulu, Đan Mạch, Đức, Ả Rập, dịch ngôn ngữ.

Copyright ©2025 I Love Translation. All reserved.

E-mail: