TTJSC commented that option 1 existing Binh Long road level is at RL+4.900m and the proposed internal road level should not be at the same level with the existing road level. - TTJSC also commented to have higher building level as compared with the existing external road level. TTJSC and BYG enquired TW to study both options and to propose a suitable internal road level. Tw to study and propose internal road level- TTJSC also enquired TW to study both options with consideration of existing site and structure level to prevent additional cost for earthwork and cutting of piles. TW to take note.- TTJSC agree with BYG to lower down the roof feature at level R3 by introducing flat beam instead of upturn beam in order to achieve the 2950mm typical floor to floor height. TTJSC and BYG enquired TW to study BYG proposal and propose a suitable flat beam size for the roof feature at level R3. TW to take note and provide drawing.