***************************************** PAINTING WORK REQUIREMENT
VIETNAM SHIPBUILDING ENGINEERING JSC.,(1) (2) (3) (4) (5) (6)
1 Cleaning work
- If salt content over 20~50mg/m2 on the surface must
be cleaned by fresh water.
- Clean surface before painting. m
2 Fresh water wil be
suply by
contractor.
Blasting for welding line & damage area shal be caried
out in acordance with SPC SP10 (Sa2.5). m
2 Swep blasting to remove dust & contaminated on the
primer coat. m
2 Blasting by Hand tol or Power tol to remove rust, mil
scale, rust preventive film together with surface
contamination such as grease, dirt and solid polution. m
2
3 Painting work
(refer to at.#1)
Outside Tank: Total 240 Microns.
-Primer coat- Interzinc 52-Gray@ 40microns
- Second coat- Interqard 475HS-Surf Gray® 125 microns
- Final coat- Irterthane 90- Pure White -Rail 9010
@50microns
Inside Tank: Total 30 microns
-Primer coat- Interline 39-Gray@ 150microns
- Final coat- Interline 39-White@ 150microns
m
2
4 Material Recycle &
Treatment - Colect garnet, grit and recycle, treatment. ton
Garnet,Stel grit,
paint & thiner wil
be suply by
contractor
5 Labour - Scafold asembly & dis-asembly (internal tank)
(06 tanks only -refer to at.#3) m
2
*
*
*
UNIT
PRICE
(VND)
Blasting work
(refer to at.#1)
Tol & Equipments:
- Portable presure blasting machine with remote control system
-Airles sprayers machine
-Airles sprayers horse
-Paint agitator
-Airles guns
-Vacum machine with horse
-Other inspection equipments.
Manpower:
- Operating compres machine
-Gondola operation
-Blaster, painter & Helper
-Inspection
Consumables:
- Blasting hose, blasting nozle
-Paint Nozle Tip
-Abrasive sand cloth
-Paintbrush, paint roler
-Wasted cloth
2
Note: The above work requirement are included:
- Gondola shal be
used for blasting &
Painting Outside of
tanks.
- Scafold shal be
used for blasting &
Painting Inside of
tank
- Lighting, Electric
power, Canvas,
nest, rope, puley
wil be suply by
constractor
I.WORK REQUIREMENT
No. ITEM DESCRIPTION
VIETNAM SHIPBUILDING ENGINEERING JSC.,
Ad: 4th flor, no 12/15 Dinh Cong str., Hoang Mai dist.,Ha Noi, Viet Nam
TEL :+ 84 4 36.687.26 FAX :+ 84 4 36.687.27 E-mail :
UNIT REMARK
Page:1/2VIETNAM SHIPBUILDING ENGINEERING JSC.,
Ad: 4th flor, no 12/15 Dinh Cong str., Hoang Mai dist.,Ha Noi, Viet Nam
TEL :+ 84 4 36.687.26 FAX :+ 84 4 36.687.27 E-mail : *
* Site Ofice:
-Container ofice *
* Lodging for workers *
*
* Al of blasting equipments are suitable for mesh size of garnet: #20/40
*
* Certificate of painter, supervisor and worker identification shal be atached with the quotation. * Oil consumption for Air compresor * Company profile shal be atached with the quotation.(If posible, by English version). * Deadline for quote the price is 17h0 on Tuesday December 16th, 2014. By fax or email to anhn@visec.com.vn
I.OTHER REQUIREMENT
PPE:
- Uniform cloth, Blast cloth, blast helmet
-Safety helmet, safety shoes, safety glas, face shield
-Airline Breathing filter for blaster
-Safety harneses and lifelines
-Safety glove (working gloves, blasting gloves)
-Gas mask (Industry mask, Gas&respirator.), ear plug
Equipment mobilzation & demobilzation:
- 01 Bomtruck
-01 Folk lift
-01 Pickup.
Detail organization of team work (q'ty of team, q'ty of blaster & painter per each team…etc), and Schedule
of work must be atached with the quotation.
Job site at Nghi Son, Thanh Hoa.
Transportation for worker
Page:2/2BLASTING & PAINTING SCHEDULE AT FIELD
Prepared by: Date: 20 Nov, 2014 Rev.1
ShelOutside
Rof (
Ponton/
Deck)-
Outside
Shel -
Inside
Rof
(Deck) -
Inside
Botom -
Inside Others
Area Area Area Area Area Area
(M2) (M2) (M2) (M2) (M2) (M2) (M2)
1 1 153-TK-024 (CRT) 3,209 1,573 53 83 678 32
2 1 154-TK-05 (DFRT) 3,265 1,654 598 84 564 365
3 1 154-TK-06 (DFRT) 3,265 1,654 598 84 564 365
4 1 154-TK-07 (DFRT) 3,265 1,654 598 84 564 365
5 1 152-TK-014 (DFRT) 3,781 1,804 764 95 721 397
6 1 152-TK-015 (DFRT) 2,694 1,541 485 76 456 36
7 1 152-TK-016 (DFRT) 2,694 1,541 485 76 456 36
B 1 153-TK-023 (DFRT) 2,894 1,541 485 76 456 36
9 1 154-TK-015 (DFRT) 3,091 1,598 542 80 51 360
10 1 154-TK-016 (DFRT) 3,091 1,598 542 80 51 360
1 1 154-TK-017 (DFRT) 4,012 1,93 80 97 75 427
12 1 154-TK-018 (DFRT) 4,012 1,93 80 97 75 427
13 1 154-TK-021 (DFRT) 4,012 1,93 80 97 75 427
14 1 153-TK-013 (DRT) 3,630 1,801 731 89 631 378
15 1 153-TK-014 (DRT) 3,630 1,801 731 89 631 378
16 1 153-TK-015 (EFRT) 3,328 1,619 565 81 523 540
17 1 153-TK-016 (EFRT) 3,328 1,619 565 81 523 540
18 1 153-TK-019 (DRT) 3,395 1,610 832 80 515 358
19 1 153-TK-020 (DRT) 3,395 1,610 832 80 515 358
20 1 153-TK-021 (EFRT) 3,567 1,706 624 85 581 571
21 1 153-TK-02 (EFRT) 3,567 1,706 624 85 581 571
2 1 153-TK-017 (CRT) 4,87 2,201 964 10 1,163 49
23 1 153-TK-018 (CRT) 4,87 2,201 964 10 1,163 49
24 1 152-TK-03 (CRT) 4,098 1,965 747 97 903 386
25 1 152-TK-04 (CRT) 4,098 1,965 747 97 903 386
26 1 152-TK-05 (CRT) 4,098 1,965 747 97 903 386
27 1 156-TK-01 (EFRT) 6,517 1,85 784 1,85 656 735 632
28 1 156-TK-02 (EFRT) 6,517 1,85 784 1,85 656 735 632
29 1 156-TK-03 (EFRT) 6,517 1,85 784 1,85 656 735 632
30 1 152-TK-01 (DFRT) 4,543 2,152 93 105 81 472
31 1 152-TK-02 (DFRT) 4,543 2,152 93 105 81 472
32 1 152-TK-013 (DFRT) 3,924 1,928 764 95 721 416
3 1 154-TK-08 (CRT) 9,412 3,464 2,363 172 2,601 812
34 1 154-TK-09 (CRT) 9,412 3,464 2,363 172 2,601 812
35 1 154-TK-010 (CRT) 9,412 3,464 2,363 172 2,601 812
36 1 154-TK-01 (CRT) 9,353 3,412 2,363 172 2,601 805
37 1 154-TK-012 (CRT) 9,353 3,412 2,363 172 2,601 805
38 1 190-TK-101 (CRT) 1,674 596 15 596 15 13 139
39 1 190-TK-201A (EFRT) 3,93 1,169 479 1,083 382 45 375
40 1 190-TK-201B (EFRT) 3,93 1,169 479 1,083 382 45 375
40 182,236 7,673 35,593 1,782 2,847 35,97 18,764
C3TK-09 (1/2)
C3TK-09 (2/2)
C4TK-01
Total
NO. Tank Group
C3TK-04
C3TK-03
C3TK-05
Q'ty NAME OF TANK
Total Painting
area
Description for Area Blasting & Painting at site
C3TK-08
C3TK-01
C3TK-02
C3TK-06
C3TK-07BLASTING & PAINTING SCHEDULE AT FIELD
Prepared by: Date: 20 Nov, 2014 Rev.1
3 4 5 6 7 8 9 10 1 12 1 2 3 4 5 6 7
Ist 2nd 3rd 4th 5th 6th 7th 8th 9th 10th 1th 12th 13th 14th 15th 16th 17th
1 1 153-TK-024 (CRT) 25-Apr-15 31-May-15
2 1 154-TK-05 (DFRT) 20-Apr-15 25-May-15
3 1 154-TK-06 (DFRT) 20-Apr-15 25-May-15
4 1 154-TK-07 (DFRT) 20-Apr-15 25-May-15
5 1 152-TK-014 (DFRT) 15-Mar-15 23-Apr-15
6 1 152-TK-015 (DFRT) 15-Mar-15 18-Apr-15
7 1 152-TK-016 (DFRT) 15-Mar-15 18-Apr-15
B 1 153-TK-023 (DFRT) 15-Mar-15 18-Apr-15
9 1 154-TK-015 (DFRT) 2-Jun-15 7-Jul-15
10 1 154-TK-016 (DFRT) 27-May-15 1 -Jul-15
1 1 154-TK-017 (DFRT) 27-May-15 5-Jul-15
12 1 154-TK-018 (DFRT) 27-May-15 5-Jul-15
13 1 154-TK-021 (DFRT) 9-Jul-15 17-Aug-15
14 1 153-TK-013 (DRT) 3-Jul-15 8-Aug-15
15 1 153-TK-014 (DRT) 7-Jul-15 12-Aug-15
16 1 153-TK-015 (EFRT) 7-Jul-15 17-Aug-15
17 1 153-TK-016 (EFRT) 19-Aug-15 29-Sep-15
18 1 153-TK-019 (DRT) 10-Aug-15 14-Sep-15
19 1 153-TK-020 (DRT) 14-Aug-15 18-Sep-15
20 1 153-TK-021 (EFRT) 19-Aug-15 29-Sep-15
21 1 153-TK-02 (EFRT) 1-Oct-15 1-NOV-15
2 1 153-TK-017 (CRT) 16-Sep-15 28-Oct-15
23 1 153-TK-018 (CRT) 20-Sep-15 l-Nov-15
24 1 152-TK-03 (CRT) 1-Oct-15 IO-Nov-15
25 1 152-TK-04 (CRT) 13-Nov-15 23-D6C-15
26 1 152-TK-05 (CRT) 30-0ct-15 9-Dec-15
27 1 156-TK-01 (EFRT) 15-Jan-16 8-Mar-16
28 1 156-TK-02 (EFRT) 15-Jan-16 8-Mar-16
29 1 156-TK-03 (EFRT) 15-Jan-16 8-Mar-16
30 1 152-TK-01 (DFRT) 14-Feb-16 25-Mar-16
31 1 152-TK-02 (DFRT) 10-Mar-16 19-Apr-16
32 1 152-TK-013 (DFRT) 10-Mar-16 17-Apr-16
3 1 154-TK-08 (CRT) 10-Mar-16 7-May-16
34 1 154-TK-09 (CRT) 27-Mar-16 25-May-16
35 1 154-TK-010 (CRT) 21-Apr-16 19-Jun-16
36 1 154-TK-01 (CRT) 19-Apr-16 17-Jun-16
37 1 154-TK-012 (CRT) 9-May-16 30-Jun-16
38 1 190-TK-101 (CRT) 3-Nov-15 5-Dec-15
39 1 190-TK-201A (EFRT) 12-Nov-15 27-Dec-15
40 1 190-TK-201B (EFRT) 29-Dec-15 12-Feb-16
40 15-Mar-15
C3TK-09 (1/2)
C3TK-09 (2/2)
C4TK-01
Total 30-Jun-16 |
Start Finish
2015 2016
C3TK-01
NO. Tank Group Q'ty NAME OF TANK
C3TK-08
C3TK-02
C3TK-04
C3TK-03
C3TK-05
C3TK-06
C3TK-07Painting Aplications
* 153-TK-015/016
* 153-TK-021/02
Area/Parts Location Paint System ID Remarks
External “A"
(CS1)
Internal N/A
External "A”
(CS1)
Internal “A”
(CS1)
External “A"
(CS1)
Internal "B"
(IL01B)
From botom up to
1m height
External (Underside) N/A
Internal (Top side) “ B”
(IL01B)
External Carbon stel structure (such as Wind
Girder, Top Platform, Spiral Stain/vay etc.) Al “C”
(CS1)
Grating, Roling Lader, Handrail, And other
hot dip galvanise — "D"
Others --- N/A
• 156-TK-01 • 156-TK-03
• 156-TK-02 • 190-7K-201A/B
Area/Parts Location Paint System ID Remarks
External " A" (CS1)
Internal N/A
External "A" (CS1)
Internal “A" (CS1)
External “ A" (CS1)
Internal “ B" (IL01B)
From botom up to
HLL + 50
External (Top side) A" (CS1)
Internal (Underside) " B” (IL01B)
External (Underside) " B” (IL01B)
Internal (Top side) N/A
External (Underside) N/A
Internal (Top side) “ B”
(IL01B)
External Carbon stel structure (such as Wind
Girder, Top Platform, Spiral Stairway etc.) Al (CS1)
Grating, Roling Lader, Handrail, And other
hot dip galvanize "D”
Others --- N/A
Shel Plate of 2nd to HLL, Centering & Guide
poles (Above Deck) Deck Plate, Ponton
Cover plate And Nozles/Man holes on rof
deck
Shel Plate of HLL up to top
Shel Plate of 1 * course, (Incl. atachments on
shel plate Such as nozles, manholes, etc.)
Botom Plate, (incl. Anular Plate and Reinf.
Plate for cleanout)
Ponton Cover Plate, and Centering (Above
Deck)
Shel Plate of HLL + 50 up to top
Shel Plate of 131 course to HLL +50 (incl.
atachments on shel plate Such as nozles,
manholes, etc.)
Deck Plate and Nozles/Manholes/Guide
Poles or Rof Deck
Ponton Botom, and Centering (Below Deck)
Botom Plate, (incL Anular Plate and Reinf.
Plate for cleanout)
Page:1/2• 152-TK-016
Area/Parts Location Paint System ID Remarks
External “A”
(CS1)
Internal N/A
External “A"
(CS1)
Internal "B"
(IL01B)
From botom up to
1m height
External (Und