1.4 SUBMITTALS
A. Contractors and their sub-contractors shall prepare construction plan, factory manufacturing instruction, site construction instruction, work schedule, inspection plan, etc., before construction to be approved by the personnel in charge.
B. Construction plan and others approved by the personnel in charge shall describe the details deemed appropriate to the contract, in reference to the following details.
1. Overview of the construction
2. Master Schedule
3. Organization of construction works
4. Bracket delivery plan
5. Site construction plan - bracket installation and lowering - workers and equipment deployment plan
6. Quality control and inspection plan
7. List of cooperation required for each phase
8. List of opinions for construction improvement
9. Safety and environmental management plan
0/5000
Từ: -
Sang: -
Kết quả (Việt) 1: [Sao chép]
Sao chép!
1.4 SUBMITTALSA. Contractors and their sub-contractors shall prepare construction plan, factory manufacturing instruction, site construction instruction, work schedule, inspection plan, etc., before construction to be approved by the personnel in charge.B. Construction plan and others approved by the personnel in charge shall describe the details deemed appropriate to the contract, in reference to the following details.1. Overview of the construction2. Master Schedule3. Organization of construction works4. Bracket delivery plan5. Site construction plan - bracket installation and lowering - workers and equipment deployment plan6. Quality control and inspection plan7. List of cooperation required for each phase8. List of opinions for construction improvement9. Safety and environmental management plan
đang được dịch, vui lòng đợi..
Kết quả (Việt) 2:[Sao chép]
Sao chép!
1.4 SUBMITTALS
A. Contractors and their sub-contractors shall prepare construction plan, factory manufacturing instruction, site construction instruction, work schedule, inspection plan, etc., before construction to be approved by the personnel in charge.
B. Construction plan and others approved by the personnel in charge shall describe the details deemed appropriate to the contract, in reference to the following details.
1. Overview of the construction
2. Master Schedule
3. Organization of construction works
4. Bracket delivery plan
5. Site construction plan - bracket installation and lowering - workers and equipment deployment plan
6. Quality control and inspection plan
7. List of cooperation required for each phase
8. List of opinions for construction improvement
9. Safety and environmental management plan
đang được dịch, vui lòng đợi..
 
Các ngôn ngữ khác
Hỗ trợ công cụ dịch thuật: Albania, Amharic, Anh, Armenia, Azerbaijan, Ba Lan, Ba Tư, Bantu, Basque, Belarus, Bengal, Bosnia, Bulgaria, Bồ Đào Nha, Catalan, Cebuano, Chichewa, Corsi, Creole (Haiti), Croatia, Do Thái, Estonia, Filipino, Frisia, Gael Scotland, Galicia, George, Gujarat, Hausa, Hawaii, Hindi, Hmong, Hungary, Hy Lạp, Hà Lan, Hà Lan (Nam Phi), Hàn, Iceland, Igbo, Ireland, Java, Kannada, Kazakh, Khmer, Kinyarwanda, Klingon, Kurd, Kyrgyz, Latinh, Latvia, Litva, Luxembourg, Lào, Macedonia, Malagasy, Malayalam, Malta, Maori, Marathi, Myanmar, Mã Lai, Mông Cổ, Na Uy, Nepal, Nga, Nhật, Odia (Oriya), Pashto, Pháp, Phát hiện ngôn ngữ, Phần Lan, Punjab, Quốc tế ngữ, Rumani, Samoa, Serbia, Sesotho, Shona, Sindhi, Sinhala, Slovak, Slovenia, Somali, Sunda, Swahili, Séc, Tajik, Tamil, Tatar, Telugu, Thái, Thổ Nhĩ Kỳ, Thụy Điển, Tiếng Indonesia, Tiếng Ý, Trung, Trung (Phồn thể), Turkmen, Tây Ban Nha, Ukraina, Urdu, Uyghur, Uzbek, Việt, Xứ Wales, Yiddish, Yoruba, Zulu, Đan Mạch, Đức, Ả Rập, dịch ngôn ngữ.