They need to consider how long they will keep an asset in service prior to replacement of the asset:There is a balance between how much to spend in each category: maintenance, repair, and replacement to achieve the most efficient system In developing a wastewater system repair schedule, the utility must determine its own approach to repairing verses replacing assets. The utility will need to decide when it is spending more money (including personnel hours) to repair the asset than it would cost to replace the asset.
đang được dịch, vui lòng đợi..
