PAINTING SPECIFICATIONS Approved ABG







Painting Specifications for Main Process Plant
PROJECT : BIO-FUEL ETHANOL PLANT IN NORTHEN REGION LOCATION : TAM NONG, PHU THO, VIETNAM
OWNER : PETROVIETNAM BIOFUELS JOINT STOCK COMPANY (PVB)









Distribution
PVC
PD
DPD (Site)
Proc M



ALI
PM


JVC
REV
DATE
PAGE
PEM
DESCRIPTION
PREP’D
CHK’D
APP’D
PM
EM
PEN
02
26/10/2010
-
Issued for Design / Construction.
KMD
URL
ABG
CVL
PIP
INST
01
20/08/2010

05
For Approval
KMD
URL
ABG
ELC
DHT


00
30/04/2010
ISSUED FOR PURCHASER APPROVAL
KMD
URL
ABG

C: Circulation
S: Send Copy

PVC-NR-SP-001 Rev. 0 Page 1 of 45





REVISION LIST



SECTION REV DATE DESCRIPTION OF AMENDMENT
00 30/04/2010 ISSUED FOR PURCHASER APPROVAL
01 20/08/2010 For Approval
02 26/10/2010 For Issued for design / construction.
















CONTENTS


SECTION Revision Page
1 PROJECT SEPCIFIC REQUIREMENT 02 4
2 GENERAL 02 5
3 SCOPE 02 5
4 REFERENCES 02 7
5 DEFINITIONS 02 9
6 DESIGN REQUIREMENT 02 10
7 GALVANISED ITEMS 02 13
8 EQUIPMENT 02 14
9 SURFACE PREPARATION, COATING APPLICATION 02 15
10 APPLICATION RESPONSIBILITY 02 22
11 MATERIAL 02 26
12 IDENTIFICATION OF EQUIPMENTS, PIPING ETC. 02 28
13 INSPECTION & TESTING 02 30
14 FIELD SAFETY & HYGIENE 02 32
15 GUARANTEE 02 32
16 QUALIFICATION CRITERIA FOR PAINTING CONTRACTOR 02 32
17 DOCUMENTATION


02 33
ANNEXURE – 1 : PAINTING SYSTEMS SCHEDULE 02 35
ANNEXURE – 2 : COLOUR BANDS 02 37
ANNEXURE – 3 : PAINTING COLOUR CODES 02 41
ANNEXURE – 4 : SURFACE PREPARATION AND
COATING INSPECTION FORM 02 45
ANNEXURE – 5 : LOCAL / SITE CONDITIONS 02 46


PROJECT SPECIFIC REQUIREMENT
Client: PETROVIETNAM BIOFUELS JOINT STOCK COMPANY (PVB)

Project: BIO-FUEL ETHANOL PLANT IN NORTHEN REGION
Plant Location: TAM NONG, PHU THO, VIETNAM
Climatic Condition: Exposure to Moderate corrosive atmosphere


1. For surface preparation blasted to SA 2 / SA 2 ½ quality, with Zinc Silicate (Alkyl) primer or Zinc Rich Epoxy primer, Micaceous Iron Oxide (recoatable) intermediate coat and Aliphatic Acrylic Polyurethane paint (Unlimited recoatable) or Two Pack Epoxy Phenolic finish coat. For details please refer ANNEXURE -1 & 2.

2. This specification covers requirements for the protection of external surfaces of carbon steel and insulated 300 series stainless steel from corrosion.

3. Colour Code: Shall be finalized and issued at the time of detailing.

4. For Climatic Local Conditions, Please refer ANNEXURE-5 attached with this specification.

5. The item listed below shall be shielded and protected to prevent damage during surface preparation and paint material application operation. All openings, including those that are flanged or threaded shall be sealed to prevent entry of blast abrasive or paint material. After completion of painting operation all material used for shielding and sealing shall be removed unless instructed otherwise: nameplates; packing glands and seals; bearing equipment couplings and shafts; lubrication fittings; pressure gauges and flow indicator glasses; motor starters; instrument dials; vents; Exposed linkages; Valve stems; Light bulb, enclosures and reflectors; Air intakes; Rubber part and plastics etc.

6. The painting requirement of individual pipes shall be identified on line classification lists. Contractor shall provide details of the method of identifying protective coating system on the line classification list for Owner review and approval.


1. GENERAL
This engineering standard specification covers the requirements for painting including surface preparation, method of application, inspection of paints/coating and painted surfaces for equipment, piping, structures, electrical, instrumentation equipment for the plants engineered by Alfa Laval (I) Ltd.

• For Painting of Piping/ Exchangers/ Vessels/ Rotary Equipments/ Storage Tanks contractor to follow ANNEXURE 1 for detailed painting schedule. The categories used for above are as follows :


a) For Piping : (Refer ANNEXURE – 1,2 & 3)

b) For Pressure Vessels/ Exchangers: (Refer ANNEXURE – 1,2 & 3) (Painting is done by Vessel Vendor)

e) For Storage Tanks : (Refer ANNEXURE – 1,2 & 3) (Painting is done by Vessel Vendor)

f) For Instrumentation : (Refer ANNEXURE -1)

g) For Electrical: Refer Doc No- 8455001-007-SP-0003 10-83T0040-373 (Protective finishes for
electrical equipments for outdoor use)

For MTO purpose all the above categories fall under code ‘PC’.

This Project Standard shall be read in conjunction with Licensor and Vietnamese mandatory standards, codes and regulations that also apply. In the event of any conflict, Contractor shall seek clarification from Owner before proceeding.

2. SCOPE

2.1. Scop
0/5000
Từ: -
Sang: -
Kết quả (Việt) 1: [Sao chép]
Sao chép!
Hợp đồng số 59/2009 - EPC tài liệu số10-83T0040-244 REV02 NGÀY: 27 tháng 10 năm 2010 tờ 47 Chuẩn bị sẵn sàng KMD Kiểm tra URL Thông số kỹ thuật vẽ tranh chấp thuận ABG Vẽ tranh các chi tiết kỹ thuật cho cây trồng chính quá trìnhDỰ ÁN: CÁC NHIÊN LIỆU SINH HỌC ETHANOL NHÀ MÁY Ở BẮC KHU VỰC VỊ TRÍ: TAM NÔNG, PHÚ THỌ, VIỆT NAMCHỦ ĐẦU TƯ: TỔNG CÔNG TY CỔ PHẦN NHIÊN LIỆU SINH HỌC (PVB) Phân phối NHỰA PVC GIÁM ĐỐC DỰ ÁN DPD (trang web) Proc M ALI AM JVC REV NGÀY TRANG PEM MÔ TẢ CHUẨN BỊ NÀO CHK NÀO ỨNG DỤNG NÀOAM EM BÚT 02 26 tháng 10 năm 2010 - Phát hành cho các thiết kế / xây dựng. KMD URL ABGCVL PIP INST 01 20/08/2010 05 Phê duyệt KMD URL ABGELC DHT 00 30/04/2010 CẤP CHO NGƯỜI MUA CHẤP THUẬN KMD URL ABG C: lưu thông S: gửi bản sao PVC-NR-SP-001 Rev. 0 trang 1 / 45 XEM DANH SÁCHMÔ TẢ PHẦN REV NGÀY SỬA ĐỔI 00 30/04/2010 PHÁT HÀNH CHO NGƯỜI MUA CHẤP THUẬN 01 20/08/2010 phê duyệt 02 26/10/2010 để ban hành cho các thiết kế / xây dựng. NỘI DUNG PHẦN sửa đổi trang1 DỰ ÁN SEPCIFIC YÊU CẦU 02 42 TƯỚNG 02 53 PHẠM VI 02 5TÀI LIỆU THAM KHẢO 4 02 75 ĐỊNH NGHĨA 02 9YÊU CẦU THIẾT KẾ 6 02 107 SƠN MỤC 02 138 THIẾT BỊ 02 149 CHUẨN BỊ BỀ MẶT, LỚP PHỦ ỨNG DỤNG 02 1510 ỨNG DỤNG TRÁCH NHIỆM 02 2211 TÀI LIỆU 02 2612 NHẬN DẠNG THIẾT BỊ, ĐƯỜNG ỐNG VV 02 2813 kiểm tra & thử nghiệm 02 3014 trường an toàn & vệ sinh 02 32BẢO HÀNH 15 02 3216 VĂN BẰNG TIÊU CHUẨN CHO BỨC TRANH NHÀ THẦU 02 3217 DOCUMENTATION 02 33 ANNEXURE – 1 : PAINTING SYSTEMS SCHEDULE 02 35 ANNEXURE – 2 : COLOUR BANDS 02 37 ANNEXURE – 3 : PAINTING COLOUR CODES 02 41 ANNEXURE – 4 : SURFACE PREPARATION ANDCOATING INSPECTION FORM 02 45 ANNEXURE – 5 : LOCAL / SITE CONDITIONS 02 46 PROJECT SPECIFIC REQUIREMENTClient: PETROVIETNAM BIOFUELS JOINT STOCK COMPANY (PVB)Project: BIO-FUEL ETHANOL PLANT IN NORTHEN REGIONPlant Location: TAM NONG, PHU THO, VIETNAMClimatic Condition: Exposure to Moderate corrosive atmosphere 1. For surface preparation blasted to SA 2 / SA 2 ½ quality, with Zinc Silicate (Alkyl) primer or Zinc Rich Epoxy primer, Micaceous Iron Oxide (recoatable) intermediate coat and Aliphatic Acrylic Polyurethane paint (Unlimited recoatable) or Two Pack Epoxy Phenolic finish coat. For details please refer ANNEXURE -1 & 2.2. This specification covers requirements for the protection of external surfaces of carbon steel and insulated 300 series stainless steel from corrosion.3. Colour Code: Shall be finalized and issued at the time of detailing.4. For Climatic Local Conditions, Please refer ANNEXURE-5 attached with this specification.5. The item listed below shall be shielded and protected to prevent damage during surface preparation and paint material application operation. All openings, including those that are flanged or threaded shall be sealed to prevent entry of blast abrasive or paint material. After completion of painting operation all material used for shielding and sealing shall be removed unless instructed otherwise: nameplates; packing glands and seals; bearing equipment couplings and shafts; lubrication fittings; pressure gauges and flow indicator glasses; motor starters; instrument dials; vents; Exposed linkages; Valve stems; Light bulb, enclosures and reflectors; Air intakes; Rubber part and plastics etc.6. The painting requirement of individual pipes shall be identified on line classification lists. Contractor shall provide details of the method of identifying protective coating system on the line classification list for Owner review and approval. 1. GENERALThis engineering standard specification covers the requirements for painting including surface preparation, method of application, inspection of paints/coating and painted surfaces for equipment, piping, structures, electrical, instrumentation equipment for the plants engineered by Alfa Laval (I) Ltd.• For Painting of Piping/ Exchangers/ Vessels/ Rotary Equipments/ Storage Tanks contractor to follow ANNEXURE 1 for detailed painting schedule. The categories used for above are as follows :a) For Piping : (Refer ANNEXURE – 1,2 & 3)b) For Pressure Vessels/ Exchangers: (Refer ANNEXURE – 1,2 & 3) (Painting is done by Vessel Vendor)e) For Storage Tanks : (Refer ANNEXURE – 1,2 & 3) (Painting is done by Vessel Vendor)f) For Instrumentation : (Refer ANNEXURE -1)g) For Electrical: Refer Doc No- 8455001-007-SP-0003 10-83T0040-373 (Protective finishes forelectrical equipments for outdoor use)For MTO purpose all the above categories fall under code ‘PC’.This Project Standard shall be read in conjunction with Licensor and Vietnamese mandatory standards, codes and regulations that also apply. In the event of any conflict, Contractor shall seek clarification from Owner before proceeding.2. SCOPE2.1. Scop
đang được dịch, vui lòng đợi..
Kết quả (Việt) 2:[Sao chép]
Sao chép!

Hợp đồng số 59/2009-EPC văn bản số
10-83T0040-244 REV
02
NGÀY: 27TH tháng 10 năm 2010 TỜ 47
chế KMD
Kiểm tra URL
KỸ THUẬT TRANH Approved ABG Thông số kỹ thuật sơn cho chính Nhà máy chế biến DỰ ÁN: BIO-ETHANOL PLANT NHIÊN LIỆU TRÊN phía Bắc KHU VỰC VỊ TRÍ : TAM NÔNG, PHU THO, VIỆT NAM CHỦ ĐẦU TƯ: CÔNG TY CỔ PHẦN DẦU KHÍ nhiên liệu sinh học (PVB) Phân phối PVC PD DPD (Site) Proc M ALI PM JVC REV NGÀY TRANG PEM tẢ PREP'D CHK'D APP'D PM EM PEN 02 26 / 10/2010 - Ban hành cho thiết kế / xây dựng. KMD URL ABG CVL PIP INST 01 20/08/2010 05 để chấp thuận KMD URL ABG ELC DHT 00 30/04/2010 BAN HÀNH cHO NGƯỜI MUA PHÊ DUYỆT KMD URL ABG C: Circulation S: gửi sao chép PVC-NR-SP-001 Rev. 0 trang 1 của 45 RÀ SOÁT DANH MỤC REV NGÀY MÔ tẢ SỬA ĐỔI 00 30/04/2010 BAN HÀNH cHO NGƯỜI MUA PHÊ DUYỆT 01 20/08/2010 đối Phê duyệt 02 26/10/2010 đối Ban hành cho thiết kế / xây dựng. NỘI DUNG PHẦN Revision trang 1 DỰ ÁN sepcific YÊU CẦU 02 4 2 CHUNG 02 5 3 PHẠM VI 02 5 4 THAM KHẢO 02 7 5 ĐỊNH NGHĨA 02 9 6 THIẾT KẾ YÊU CẦU 02 10 7 MỤC mạ kẽm 02 13 8 THIẾT BỊ 02 14 9 CHUẨN BỊ BỀ MẶT, SƠN ĐƠN 02 15 10 ĐƠN TRÁCH NHIỆM 02 22 11 TÀI LIỆU 02 26 12 XÁC ĐỊNH THIẾT BỊ, PIPING ETC. 02 28 13 KIỂM TRA & KIỂM TRA 02 30 14 LĨNH VỰC AN TOÀN & VỆ SINH 02 32 15 BẢO LÃNH 02 32 16 TIÊU CHUẨN TRÌNH ĐỘ CHO TRANH THẦU 02 32 17 TÀI LIỆU 02 33 Phụ lục - 1: TRANH HỆ THỐNG PHỤ LỤC 02 35 Phụ lục - 2: ban nhạc MÀU 02 37 Phụ lục - 3: Vẽ tranh MÃ MÀU 02 41 Phụ lục - 4: ​​CHUẨN BỊ BỀ MẶT VÀ KIỂM TRA MẪU sƠN 02 45 Phụ lục - 5: ĐIỀU KIỆN ĐỊA PHƯƠNG / SITE 02 46 DỰ áN YÊU CẦU CỤ THỂ khách hàng: CÔNG TY CỔ PHẦN nhiên liệu sinh học DẦU KHÍ (PVB) Dự án: BIO-NHIÊN LIỆU ETHANOL PLANT TRÊN phía Bắc KHU Nhà máy đến từ: TAM NÔNG, PHU THO, VIỆT NAM khí hậu Tình trạng: Tiếp xúc đến trung bình bầu không khí ăn mòn 1. Đối với bề mặt chuẩn bị nổ tung thành SA 2 / SA 2 ½ chất lượng, với kẽm silicat (Alkyl) sơn lót hoặc sơn lót kẽm giàu Epoxy, chứa mica Iron Oxide (recoatable) áo trung gian và Aliphatic Acrylic sơn Polyurethane (Unlimited recoatable) hoặc hai gói Epoxy Phenolic lớp hoàn thiện . Để biết chi tiết vui lòng tham khảo Phụ lục -1 & 2. 2. Đặc điểm kỹ thuật này bao gồm các yêu cầu về bảo vệ bề mặt bên ngoài của thép cacbon và cách nhiệt 300 series thép không gỉ chống ăn mòn. 3. Màu Code: Sẽ được hoàn thiện và ban hành tại thời điểm chi tiết. 4. Đối với điều kiện địa phương khí hậu, Xin vui lòng tham khảo Phụ lục 5 kèm theo đặc điểm kỹ thuật này. 5. Các mục được liệt kê dưới đây được che chắn và bảo vệ để ngăn chặn thiệt hại trong quá trình chuẩn bị bề mặt và sơn hoạt động ứng dụng vật liệu. Tất cả các khe hở, bao gồm cả những người được bích hoặc ren được niêm phong để ngăn ngừa nhập cảnh của vụ nổ mài hoặc sơn vật liệu. Sau khi hoàn thành các hoạt động vẽ tranh tất cả các vật liệu sử dụng cho che chắn và niêm phong phải được loại bỏ trừ khi có hướng dẫn khác: biển hiệu; bịt và con dấu; mang khớp nối thiết bị và trục; phụ kiện bôi trơn; đồng hồ đo áp lực và kính chỉ số dòng chảy; khởi động động cơ; Quay số nhạc cụ; lỗ thông hơi; Liên kết tiếp xúc; Van cành; Bóng đèn, thùng và phản xạ; Cửa hút không khí; Phần Cao su và chất dẻo, vv 6. Yêu cầu sơn ống cá nhân được xác định trên bảng phân loại đường. Nhà thầu phải cung cấp chi tiết về các phương pháp xác định hệ thống lớp phủ bảo vệ trên đường danh sách phân loại cho Chủ đầu xem xét và phê duyệt. 1. CHUNG đặc điểm kỹ thuật tiêu chuẩn kỹ thuật này bao gồm các yêu cầu cho bức tranh bao gồm chuẩn bị bề mặt, phương pháp ứng dụng, kiểm tra sơn / sơn và sơn bề mặt cho các thiết bị, đường ống, kết cấu, điện, thiết bị đo đạc cho các nhà máy chế tạo bởi Alfa Laval (I) Ltd • đối Tranh của Piping / trao đổi / tàu / Rotary Thiết bị / lưu trữ Tanks thầu theo Phụ lục 1 cho lịch trình vẽ chi tiết. Các loại sử dụng cho ở trên là như sau: a) Đối với đường ống: (Tham khảo Phụ lục - 1,2 & 3) b) Đối với các bình chịu áp lực / trao đổi: (Tham khảo Phụ lục - 1,2 & 3) (Tranh được thực hiện bằng tàu bán hàng) e) Đối với Bể chứa: (Tham khảo Phụ lục - 1,2 & 3) (Tranh được thực hiện bằng tàu Vendor) f) Đối với Instrumentation: (Tham khảo Phụ lục -1) g) Đối với điện: Tham khảo Doc không- 8.455.001-007-SP- 0003 10-83T0040-373 (bảo vệ kết thúc cho các thiết bị điện dùng ngoài trời) với mục đích MTO tất cả các loại trên thuộc mã 'PC'. tiêu chuẩn dự án này phải được đọc cùng với cấp phép và tiêu chuẩn Việt Nam bắt buộc, mã số và quy định cũng ứng dụng. Trong trường hợp có xung đột nào, nhà thầu phải tìm cách làm rõ từ Chủ đầu tư trước khi tiếp tục. 2. PHẠM 2.1. scop





















































































































































































đang được dịch, vui lòng đợi..
 
Các ngôn ngữ khác
Hỗ trợ công cụ dịch thuật: Albania, Amharic, Anh, Armenia, Azerbaijan, Ba Lan, Ba Tư, Bantu, Basque, Belarus, Bengal, Bosnia, Bulgaria, Bồ Đào Nha, Catalan, Cebuano, Chichewa, Corsi, Creole (Haiti), Croatia, Do Thái, Estonia, Filipino, Frisia, Gael Scotland, Galicia, George, Gujarat, Hausa, Hawaii, Hindi, Hmong, Hungary, Hy Lạp, Hà Lan, Hà Lan (Nam Phi), Hàn, Iceland, Igbo, Ireland, Java, Kannada, Kazakh, Khmer, Kinyarwanda, Klingon, Kurd, Kyrgyz, Latinh, Latvia, Litva, Luxembourg, Lào, Macedonia, Malagasy, Malayalam, Malta, Maori, Marathi, Myanmar, Mã Lai, Mông Cổ, Na Uy, Nepal, Nga, Nhật, Odia (Oriya), Pashto, Pháp, Phát hiện ngôn ngữ, Phần Lan, Punjab, Quốc tế ngữ, Rumani, Samoa, Serbia, Sesotho, Shona, Sindhi, Sinhala, Slovak, Slovenia, Somali, Sunda, Swahili, Séc, Tajik, Tamil, Tatar, Telugu, Thái, Thổ Nhĩ Kỳ, Thụy Điển, Tiếng Indonesia, Tiếng Ý, Trung, Trung (Phồn thể), Turkmen, Tây Ban Nha, Ukraina, Urdu, Uyghur, Uzbek, Việt, Xứ Wales, Yiddish, Yoruba, Zulu, Đan Mạch, Đức, Ả Rập, dịch ngôn ngữ.

Copyright ©2025 I Love Translation. All reserved.

E-mail: