IDDESCRIPTION OF WORKSDurationStartFinish1Project summary274 dWed 9/30 dịch - IDDESCRIPTION OF WORKSDurationStartFinish1Project summary274 dWed 9/30 Việt làm thế nào để nói

IDDESCRIPTION OF WORKSDurationStart

ID
DESCRIPTION OF WORKS
Duration
Start
Finish
1
Project summary
274 d
Wed 9/30/09
Thu 10/14/10
2
Contract Award
1 d
Wed 9/30/09
Wed 9/30/09
3
NTP for Design
1 d
Tue 10/13/09
Tue 10/13/09
4
Detailed design
23 d
Wed 10/14/09
Fri 11/13/09
5
Architectural drawing and details
23 d
Wed 10/14/09
Fri 11/13/09
6
Structural drawing and details
23 d
Wed 10/14/09
Fri 11/13/09
7
Electrical drawing and details
11 d
Fri 10/30/09
Fri 11/13/09
8
Plumbing drawing and details
11 d
Fri 10/30/09
Fri 11/13/09
9
Submit Design
1 d
Sat 11/14/09
Sat 11/14/09
10
Architectural
1 d
Sat 11/14/09
Sat 11/14/09
11
Structural
1 d
Sat 11/14/09
Sat 11/14/09
12
Survey report
1 d
Sat 11/14/09
Sat 11/14/09
13
Electrical
1 d
Sat 11/14/09
Sat 11/14/09
14
Plumbing
1 d
Sat 11/14/09
Sat 11/14/09
15
Site-Specific Quality Control Plan (SSQCP)
1 d
Sat 11/14/09
Sat 11/14/09
16
Review and Approval
32 d
Mon 11/16/09
Tue 12/29/09
17
TESCO and US Army Corps review
11 d
Mon 11/16/09
Mon 11/30/09
18
Correction all commend from TESCO & USACE
7 d
Thu 12/3/09
Fri 12/11/09
19
Submit to TESCO & USACE for 2nd review
7 d
Mon 12/14/09
Tue 12/22/09
20
Wait for NTP for Construction
5 d
Wed 12/23/09
Tue 12/29/09
21
Construction Works
205 d
Mon 1/4/10
Thu 10/14/10
22
Mobilization
5 d
Mon 1/4/10
Fri 1/8/10
23
Quality control, Safety plans and tempraory works
7 d
Mon 1/11/10
Tue 1/19/10
24
Ground Breaking Ceremony
1 d
Wed 1/20/10
Wed 1/20/10
25
Safety Demonstrations
2 d
Thu 1/21/10
Fri 1/22/10
26
Excavation
10 d
Mon 1/25/10
Fri 2/5/10
27
Bedding made of graded stone
7 d
Mon 2/8/10
Tue 2/16/10
28
Backfilling
14 d
Wed 3/10/10
Mon 3/29/10
29
Concrete works
87 d
Wed 2/17/10
Thu 6/17/10
30
Foundation
10 d
Wed 2/17/10
Tue 3/2/10
31
Stump Columns
5 d
Wed 3/3/10
Tue 3/9/10
32
Ground beam
12 d
Wed 3/10/10
Thu 3/25/10
33
Floor slab
10 d
Tue 3/16/10
Mon 3/29/10
34
Columns
10 d
Tue 3/30/10
Mon 4/12/10
35
Head wall beam
20 d
Tue 4/27/10
Mon 5/24/10
36
Roof beam
18 d
Tue 5/25/10
Thu 6/17/10
37
Masonry works
75 d
Wed 3/3/10
Tue 6/15/10
38
Laying brick wall
75 d
Wed 3/3/10
Tue 6/15/10
39
Supply and install concrete vent block and glass block
30 d
Wed 3/3/10
Tue 4/13/10
40
Roofing work
33 d
Fri 6/18/10
Tue 8/3/10
41
Roof steel structure
18 d
Fri 6/18/10
Tue 7/13/10
42
Laying cement roof tile
8 d
Fri 7/23/10
Tue 8/3/10
43
Install facia board and gutter
5 d
Wed 7/28/10
Tue 8/3/10
44
Rendering & plastering
35 d
Wed 6/16/10
Tue 8/3/10
45
Plastering external and internal
25 d
Wed 6/16/10
Tue 7/20/10
46
Plastering terrazo for bench
10 d
Wed 7/21/10
Tue 8/3/10
47
Carpentry
85 d
Wed 4/14/10
Tue 8/10/10
48
Install door frame
20 d
Wed 4/14/10
Tue 5/11/10
49
Supply and install door sheet
15 d
Wed 6/30/10
Tue 7/20/10
50
Supply and install aluminum window
15 d
Wed 7/21/10
Tue 8/10/10
51
Electrical works
90 d
Wed 4/14/10
Mon 8/16/10
52
Install and connection electrical wiring system
30 d
Wed 4/14/10
Tue 5/25/10
53
Install light, generator and distribution box
10 d
Wed 8/4/10
Mon 8/16/10
54
Plumbing work
89 d
Wed 4/14/10
Sat 8/14/10
55
Water supply system
14 d
Wed 4/14/10
Mon 5/3/10
56
Sanitation and Fittings
10 d
Tue 8/3/10
Sat 8/14/10
57
Painting works
28 d
Wed 7/14/10
Thu 8/19/10
58
External and internal wall
21 d
Fri 7/23/10
Thu 8/19/10
59
Steel work
7 d
Wed 7/14/10
Thu 7/22/10
60
Finishing works
23 d
Mon 7/19/10
Tue 8/17/10
61
Floor tile and wall tile
23 d
Mon 7/19/10
Tue 8/17/10
62
Skirting tile
8 d
Mon 7/19/10
Wed 7/28/10
63
External work
149 d
Wed 3/3/10
Fri 9/24/10
64
Septic Tank and water Tower
50 d
Tue 5/4/10
Mon 7/12/10
65
Waste and Sewage water
20 d
Tue 7/13/10
Mon 8/9/10
66
Drainage
20 d
Tue 7/13/10
Mon 8/9/10
67
Transfer to new buildings
2 d
Fri 8/20/10
Mon 8/23/10
68
Refurbishment existing building
25 d
Mon 8/23/10
Fri 9/24/10
69
Well drilling
30 d
Wed 3/3/10
Tue 4/13/10
70
Entrance road
20 d
Tue 8/24/10
Mon 9/20/10
71
Site cleaning every day
60 d
Thu 7/22/10
Tue 10/12/10
72
Prepare and Submite As built Drawing
14 d
Tue 9/21/10
Fri 10/8/10
73
Pre-final inspection punchlist
2 d
Mon 9/27/10
Tue 9/28/10
74
Correction Pre-final inspection punchlist
10 d
Wed 9/29/10
Tue 10/12/10
75
Final inspection
1 d
Wed 10/13/10
Wed 10/13/10
76
Completed Hand over and Turn over ceremony
1 d
Thu 10/14/10
Thu 10/14/10
0/5000
Từ: -
Sang: -
Kết quả (Việt) 1: [Sao chép]
Sao chép!
IDDESCRIPTION OF WORKSDurationStartFinish1Project summary274 dWed 9/30/09Thu 10/14/102Contract Award1 dWed 9/30/09Wed 9/30/093NTP for Design1 dTue 10/13/09Tue 10/13/094Detailed design23 dWed 10/14/09Fri 11/13/095Architectural drawing and details23 dWed 10/14/09Fri 11/13/096Structural drawing and details23 dWed 10/14/09Fri 11/13/097Electrical drawing and details11 dFri 10/30/09Fri 11/13/098Plumbing drawing and details11 dFri 10/30/09Fri 11/13/099Submit Design1 dSat 11/14/09Sat 11/14/0910Architectural 1 dSat 11/14/09Sat 11/14/0911Structural 1 dSat 11/14/09Sat 11/14/0912Survey report1 dSat 11/14/09Sat 11/14/0913Electrical 1 dSat 11/14/09Sat 11/14/0914Plumbing 1 dSat 11/14/09Sat 11/14/0915Site-Specific Quality Control Plan (SSQCP)1 dSat 11/14/09Sat 11/14/0916Review and Approval32 dMon 11/16/09Tue 12/29/0917TESCO and US Army Corps review11 dMon 11/16/09Mon 11/30/0918Correction all commend from TESCO & USACE7 dThu 12/3/09Fri 12/11/0919Submit to TESCO & USACE for 2nd review7 dMon 12/14/09Tue 12/22/0920Wait for NTP for Construction5 dWed 12/23/09Tue 12/29/0921Construction Works205 dMon 1/4/10Thu 10/14/1022Mobilization5 dMon 1/4/10Fri 1/8/1023Quality control, Safety plans and tempraory works7 dMon 1/11/10Tue 1/19/1024Ground Breaking Ceremony1 dWed 1/20/10Wed 1/20/1025Safety Demonstrations2 dThu 1/21/10Fri 1/22/1026Excavation10 dMon 1/25/10Fri 2/5/1027Bedding made of graded stone7 dMon 2/8/10Tue 2/16/1028Backfilling14 dWed 3/10/10Mon 3/29/1029Concrete works87 dWed 2/17/10Thu 6/17/1030Foundation10 dWed 2/17/10Tue 3/2/1031Stump Columns5 dWed 3/3/10Tue 3/9/1032Ground beam12 dWed 3/10/10Thu 3/25/1033Floor slab10 dTue 3/16/10Mon 3/29/1034Columns10 dTue 3/30/10Mon 4/12/1035Head wall beam20 dTue 4/27/10Mon 5/24/1036Roof beam18 dTue 5/25/10Thu 6/17/1037Masonry works75 dWed 3/3/10Tue 6/15/1038Laying brick wall 75 dWed 3/3/10Tue 6/15/1039Supply and install concrete vent block and glass block30 dWed 3/3/10Tue 4/13/1040Roofing work33 dFri 6/18/10Tue 8/3/1041Roof steel structure18 dFri 6/18/10Tue 7/13/1042Laying cement roof tile8 dFri 7/23/10Tue 8/3/1043Install facia board and gutter5 dWed 7/28/10Tue 8/3/1044Rendering & plastering35 dWed 6/16/10Tue 8/3/1045Plastering external and internal25 dWed 6/16/10Tue 7/20/1046Plastering terrazo for bench10 dWed 7/21/10Tue 8/3/1047Carpentry85 dWed 4/14/10Tue 8/10/1048Install door frame20 dWed 4/14/10Tue 5/11/1049Supply and install door sheet15 dWed 6/30/10Tue 7/20/1050Supply and install aluminum window15 dWed 7/21/10Tue 8/10/1051Electrical works90 dWed 4/14/10Mon 8/16/1052Install and connection electrical wiring system30 dWed 4/14/10Tue 5/25/1053Install light, generator and distribution box10 d
Wed 8/4/10
Mon 8/16/10
54
Plumbing work
89 d
Wed 4/14/10
Sat 8/14/10
55
Water supply system
14 d
Wed 4/14/10
Mon 5/3/10
56
Sanitation and Fittings
10 d
Tue 8/3/10
Sat 8/14/10
57
Painting works
28 d
Wed 7/14/10
Thu 8/19/10
58
External and internal wall
21 d
Fri 7/23/10
Thu 8/19/10
59
Steel work
7 d
Wed 7/14/10
Thu 7/22/10
60
Finishing works
23 d
Mon 7/19/10
Tue 8/17/10
61
Floor tile and wall tile
23 d
Mon 7/19/10
Tue 8/17/10
62
Skirting tile
8 d
Mon 7/19/10
Wed 7/28/10
63
External work
149 d
Wed 3/3/10
Fri 9/24/10
64
Septic Tank and water Tower
50 d
Tue 5/4/10
Mon 7/12/10
65
Waste and Sewage water
20 d
Tue 7/13/10
Mon 8/9/10
66
Drainage
20 d
Tue 7/13/10
Mon 8/9/10
67
Transfer to new buildings
2 d
Fri 8/20/10
Mon 8/23/10
68
Refurbishment existing building
25 d
Mon 8/23/10
Fri 9/24/10
69
Well drilling
30 d
Wed 3/3/10
Tue 4/13/10
70
Entrance road
20 d
Tue 8/24/10
Mon 9/20/10
71
Site cleaning every day
60 d
Thu 7/22/10
Tue 10/12/10
72
Prepare and Submite As built Drawing
14 d
Tue 9/21/10
Fri 10/8/10
73
Pre-final inspection punchlist
2 d
Mon 9/27/10
Tue 9/28/10
74
Correction Pre-final inspection punchlist
10 d
Wed 9/29/10
Tue 10/12/10
75
Final inspection
1 d
Wed 10/13/10
Wed 10/13/10
76
Completed Hand over and Turn over ceremony
1 d
Thu 10/14/10
Thu 10/14/10
đang được dịch, vui lòng đợi..
Kết quả (Việt) 2:[Sao chép]
Sao chép!
ID
MÔ TẢ CÔNG VIỆC
Thời gian
Bắt đầu
Kết thúc
1
Tóm tắt dự án
274 d
Wed 9/30/09
Thu 10/14/10
2
trúng thầu
1 d
Wed 9/30/09
Wed 9/30/09
3
NTP cho thiết kế
1 d
Tue 10 / 13/09
Tue 10/13/09
4
thiết kế chi tiết
23 d
Wed 10/14/09
Fri 11/13/09
5
Bản vẽ kiến trúc và chi tiết
23 d
Wed 10/14/09
Fri 11/13/09
6
bản vẽ và các chi tiết cấu
23 d
Wed 10/14/09
Fri 11/13/09
7
bản vẽ điện và chi tiết
11 d
Fri 10/30/09
Fri 11/13/09
8
Hệ thống nước vẽ và chi tiết
11 d
Fri 10/30/09
Fri 11/13 / 09
9
Gửi Design
1 d
Sat 11/14/09
Sat 11/14/09
10
kiến trúc
1 d
Sat 11/14/09
Sat 11/14/09
11
Kết cấu
1 d
Sat 11/14/09
Sat 11/14 / 09
12
Báo cáo điều tra
1 d
Sat 11/14/09
Sat 11/14/09
13
Điện
1 d
Sat 11/14/09
Sat 11/14/09
14
Hệ thống nước
1 d
Sat 11/14/09
Sat 11/14/09
15
trang web cụ thể trong Kế hoạch Quản lý chất lượng (SSQCP)
1 d
Sat 11/14/09
Sat 11/14/09
16
Xem xét và phê duyệt
32 d
Mon 11/16/09
Tue 12/29/09
17
Tesco và quân đội Mỹ Quân đoàn xem xét
11 d
Mon 11/16/09
Mon 11/30/09
18
Correction tất cả khen từ TESCO & USACE
7 d
Thu 12/3/09
Fri 12/11/09
19
Gửi tới TESCO & USACE cho 2 xem xét
7 d
Mon 12/14 / 09
Tue 12/22/09
20
Chờ cho NTP cho xây dựng
5 d
Wed 12/23/09
Tue 12/29/09
21
Xây dựng công trình
205 d
Mon 1/4/10
Thu 10/14/10
22
Huy động
5 d
Mon 1/4/10
Fri 1/8/10
23
Kiểm soát chất lượng, kế hoạch an toàn và hoạt động tempraory
7 d
Mon 1/11/10
Tue 1/19/10
24
Lễ khởi công
1 d
Wed 1/20/10
Wed 1/20 / 10
25
cuộc biểu tình an toàn
2 d
Thu 1/21/10
Fri 1/22/10
26
khai quật
10 d
Mon 1/25/10
Fri 2/5/10
27
Bộ đồ giường làm bằng đá xếp loại
7 d
Mon 2/8/10
Tue 2/16/10
28
san lấp
14 d
Wed 3/10/10
Mon 3/29/10
29
công việc bê tông
87 d
Wed 2/17/10
Thu 6/17/10
30
Foundation
10 d
Wed 2/17/10
Tue 3 / 2/10
31
Stump Cột
5 d
Wed 3/3/10
Tue 3/9/10
32
trệt chùm
12 d
Wed 3/10/10
Thu 3/25/10
33
Tầng slab
10 d
Tue 3/16/10
Mon 3/29/10
34
Cột
10 d
Tue 3/30/10
Mon 4/12/10
35
Head chùm bức tường
20 d
Tue 4/27/10
Mon 5/24/10
36
Roof chùm
18 d
Tue 5/25/10
Thu 6/17/10
37
Masonry hoạt động
75 d
Wed 3/3/10
Tue 6/15/10
38
Xây dựng nền tường gạch
75 d
Wed 3/3/10
Tue 6/15/10
39
Cung cấp và lắp đặt khối vent kính và bê tông chặn
30 d
Wed 3/3/10
Tue 4/13/10
40
lợp việc
33 d
Fri 6/18/10
Tue 8/3/10
41
Roof kết cấu thép
18 d
Fri 6/18/10
Tue 7/13/10
42
Lắp đặt mái ngói xi măng
8 d
Fri 7/23/10
Tue 8/3/10
43
Cài đặt ban facia và máng xối
5 d
Wed 7/28/10
Tue 8/3/10
44
Rendering & trát
35 d
Wed 16/06 / 10
Tue 8/3/10
45
trát tường bên ngoài và nội bộ
25 d
Wed 6/16/10
Tue 7/20/10
46
trát Lóp cho băng ghế dự bị
10 d
Wed 7/21/10
Tue 8/3/10
47
Mộc
85 d
Wed 4/14/10
Tue 8/10/10
48
Cài đặt cửa khung
20 d
Wed 4/14/10
Tue 5/11/10
49
Cung cấp và lắp đặt tấm cửa
15 d
Wed 6/30/10
Tue 7/20/10
50
Cung cấp và lắp đặt cửa sổ nhôm
15 d
Wed 7/21/10
Tue 8/10/10
51
Điện hoạt động
90 d
Wed 4/14/10
Mon 8/16/10
52
Cài đặt và kết nối dây điện hệ thống
30 d
Wed 14/04 / 10
Tuệ 5/25/10
53
Cài đặt ánh sáng, máy phát điện và phân phối hộp
10 d
Wed 8/4/10
Mon 8/16/10
54
Hệ thống nước làm việc
89 d
Wed 4/14/10
Sat 8/14/10
55
hệ thống cấp nước
14 d
Wed 4/14/10
Mon 5/3/10
56
vệ sinh và phụ kiện
10 d
Tue 8/3/10
Sat 8/14/10
57
Tranh làm việc
28 d
Wed 7/14/10
Thu 8/19/10
58
bên ngoài và nội bộ bức tường
21 d
Fri 7/23/10
Thu 8/19/10
59
Thép làm việc
7 d
Wed 7/14/10
Thu 7/22/10
60
Hoàn thiện hoạt động
23 d
Mon 7/19/10
Tue 8/17 / 10
61
Tấm lát sàn và tường gạch
23 d
Mon 7/19/10
Tue 8/17/10
62
Riềm ngói
8 d
Mon 7/19/10
Wed 7/28/10
63
công việc ngoài
149 d
Wed 3/3/10
Fri 9/24/10
64
Septic Tank và nước Tháp
50 d
Tue 5/4/10
Mon 7/12/10
65
lý chất thải và nước thải
20 d
Tue 7/13/10
Mon 8/9/10
66
Thoát nước
20 d
Tue 7/13/10
Mon 8/9/10
67
Chuyển đến tòa nhà mới
2 d
Fri 8/20/10
Mon 8/23/10
68
tân trang hiện tại tòa nhà
25 d
Mon 8/23/10
Fri 9/24/10
69
Well khoan
30 d
Wed 3/3/10
Tue 4/13/10
70
Entrance đường
20 d
Tue 8/24/10
Mon 9/20/10
71
Site làm sạch mỗi ngày
60 d
Thu 7/22/10
Tue 10/12 / 10
72
Chuẩn bị và Submite Khi xây dựng Vẽ
14 d
Tue 9/21/10
Fri 10/8/10
73
Pre-thức punchlist kiểm tra
2 d
Mon 9/27/10
Tue 9/28/10
74
Correction Pre-thức kiểm tra punchlist
10 d
Wed 9/29/10
Tue 10/12/10
75
kiểm tra cuối cùng
1 d
Wed 10/13/10
Wed 10/13/10
76
tay hoàn thành hơn và Lật lễ
1 d
Thu 10/14/10
Thu 10/14 / 10
đang được dịch, vui lòng đợi..
 
Các ngôn ngữ khác
Hỗ trợ công cụ dịch thuật: Albania, Amharic, Anh, Armenia, Azerbaijan, Ba Lan, Ba Tư, Bantu, Basque, Belarus, Bengal, Bosnia, Bulgaria, Bồ Đào Nha, Catalan, Cebuano, Chichewa, Corsi, Creole (Haiti), Croatia, Do Thái, Estonia, Filipino, Frisia, Gael Scotland, Galicia, George, Gujarat, Hausa, Hawaii, Hindi, Hmong, Hungary, Hy Lạp, Hà Lan, Hà Lan (Nam Phi), Hàn, Iceland, Igbo, Ireland, Java, Kannada, Kazakh, Khmer, Kinyarwanda, Klingon, Kurd, Kyrgyz, Latinh, Latvia, Litva, Luxembourg, Lào, Macedonia, Malagasy, Malayalam, Malta, Maori, Marathi, Myanmar, Mã Lai, Mông Cổ, Na Uy, Nepal, Nga, Nhật, Odia (Oriya), Pashto, Pháp, Phát hiện ngôn ngữ, Phần Lan, Punjab, Quốc tế ngữ, Rumani, Samoa, Serbia, Sesotho, Shona, Sindhi, Sinhala, Slovak, Slovenia, Somali, Sunda, Swahili, Séc, Tajik, Tamil, Tatar, Telugu, Thái, Thổ Nhĩ Kỳ, Thụy Điển, Tiếng Indonesia, Tiếng Ý, Trung, Trung (Phồn thể), Turkmen, Tây Ban Nha, Ukraina, Urdu, Uyghur, Uzbek, Việt, Xứ Wales, Yiddish, Yoruba, Zulu, Đan Mạch, Đức, Ả Rập, dịch ngôn ngữ.