The Sub-Contractor shall provide the incoming telephone line cable from the junction box inthe roadway to the RCU room.The Sub-Contractor shall be responsible for liaising with TOT or Telecom Asia on allinterfaces to ensure that the supply cable is connected in an acceptable manner inaccordance with the construction programme.The Sub-Contractor shall provide all ducts, pipes supports, brackets etc. necessary for theinstallation of the incoming telephone cable.The incoming cable shall be terminated at the RCU and then the appropriate number oflines shall be installed to each of the MDF locations.
đang được dịch, vui lòng đợi..
