PRISON CONSTRUCTION AND REHABILITATION FINDINGS AND RECOMMENDATIONSExp dịch - PRISON CONSTRUCTION AND REHABILITATION FINDINGS AND RECOMMENDATIONSExp Việt làm thế nào để nói

PRISON CONSTRUCTION AND REHABILITAT















PRISON CONSTRUCTION AND REHABILITATION FINDINGS AND RECOMMENDATIONS


Experience gained by UNODC UNOPS June 2003 – September 2007


























Acknowledgments

This report was prepared by Ms. Carla Ciavarella – Justice Program Coordinator of United Nations Office on Drugs and Crime (UNODC) and Mr. Braye Sutherland – Prison and Building design specialist of United Nations Office for Project Services (UNOPS).

The authors wish to thank all involved with the prison rehabilitation and construction program within Afghanistan to date, all people involved have shown immense interest and drive to build a functioning, humane and productive prison system. In particular we wish to thank:

• His Excellencies Mr Abdul Rahim Karimi (former Minister of Justice from 2003 to 2005) and Mr
Sarwar Danish, current Minister of Justice – Afghanistan.

• Heads of Central Prisons Department (CPD), Generals Abdul Salam Bakhshi (from 2003 to 2007)
and Gen Abdul Salam Isamat in his current capacity along with all of their staff.

• UNODC staff in Kabul, in particular; Mr Radifullah Hamid, Mr Sayed Afzal Sherzad, Ms.Doris Buddenberg, in her capacity as UNODC Country Rep (from 2004 to 2006) , Ms Christina Oguz UNODC currently CR, Mr Alexandre Shimdt Mariacarmen Colitti, Matteo Pasquali.

• UNOPS Staff in Kabul; Enayatullah Zafarzai, Aziz Ahmad Hadad, Sher Afghan, Hedayatullah, Mangal, Abdul.Samad, Saifullah Sallimee, John McDonnell, Gordon Nuttall, Jan Ratts, all within the Vertical Structures Unit.
TABLE OF CONTENTS
ACRONYMS ...................................................................................................................................... 4
PREFACE .......................................................................................................................................... 5
1.0 JUSTICE, RULE OF LAW AND PRISONS IN AFGHANISTAN .................................................. 7
2.0 THE EXISTING PRISON SYSTEM ............................................................................................. 8
3.0 INTENT ........................................................................................................................................ 10
4.0 INITIAL APPROACH .................................................................................................................... 11
5.0 AFGHAN PRISON DESIGN CONSTRAINTS.............................................................................. 12
6.0 GENERAL TECHNICAL FINDINGS ............................................................................................ 12
7.0 SPECIFIC TECHNICAL SOLUTIONS ......................................................................................... 13
7.1 External Boundary Walls ....................................................................................................... 14
7.2 Internal Divisional Walls – Secondary Fence ........................................................................ 15
7.3 Third Wall Integral and Exercise Area ................................................................................... 15
7.4 Section ................................................................................................................................... 16
7.5 Female + Children ................................................................................................................. 18
7.6 Office and First Security ........................................................................................................ 19
7.7 Kitchen ................................................................................................................................... 19
7.8 Visits ...................................................................................................................................... 21
7.9 Vocational .............................................................................................................................. 22
7.10 Clinic .................................................................................................................................... 23
7.11 Doors and Windows ............................................................................................................ 23
7.12 Infrastructure........................................................................................................................ 24
7.12.1 Electricity..................................................................................................................... 24
7.12.2 Heating........................................................................................................................ 25
7.12.3 Water........................................................................................................................... 25
7.12.4 Sewerage .................................................................................................................... 25
8.0 FINDINGS .................................................................................................................................... 26
8.1 Negative factors..................................................................................................................... 26
8.2 Cost ....................................................................................................................................... 26
8.3 Ongoing Problems ................................................................................................................. 27
9.0 RECOMMENDATIONS.............................................................................................................. 28
10.0 REFERENCES........................................................................................................................... 29

TABLE OF FIGURES
Figure 1:Kabul male detention centre – prior to rehabilitation……………………………………………5
Figure 2:Masons building new wall Kabul Female & Juvenile Facility…………………………………..6
Figure 3:Female & Juvenile Facility Visits Centre…………………………………………………………6
Figure 4:Pol-e-Charki Damaged prison now high security wiring………………………………………. 8
Figure 5:Gardez prison damaged wing - now repaired…………………………………………………. 8
Figure 6:Gardez toilets inside the section…………………………………………………………………. 9
Figure 7:Kabul male detention centre dormitory prior to works…………………………………………. 9
Figure 8:Pol-e-Charki new high security compound for serious drug offenders……………………..10
Figure 9:3D image of the proposed new Gardez medium security provincial prison……………….. 11
Figure 10:Prison kitchen - showing open plan, central food preparation bench & fire brick stoves.. 13
Figure 11:Gardez under construction winter…………………………………………………………….. 13
Figure 12:Gardez Mud wall – rehabilitated & heightened……………………………………………… 14
Figure 13:Gardez prison mud boundary wall prior to rehabilitation works…………………………….14
Figure 14:Mazar provincial prison new excavation for boundary wall ……………………………….. 15
Figure 15:Schematic diagram showing the principle floor plan & security room view area………… 16
Figure 16:Schematic diagram showing inmate flow and control …………………………………….…17
Figure 17:Female and children section under construction – Kabul August 2007……………………18
Figure 18: New wood fired stove. Fire brick and steel construction with steel covers……………..…20
Figure 19: Secure single visit – High Security Facility ….……………………………………...……..…21
Figure 20: High security cell door ….…………………………………..………………………….…….…23
Figure 21: Corridor partition gate………………………….……………………………………….…….…23
Figure 22: Generators and fuel store – Expensive to run and install ………………………….……….24
Figure 23: Juvenile Female yard showing inner fence and visual barrier with outer fence behind….27
TABLE OF GRAPHS
Graph 1: Table showing contemporary inmate population……………………………………………… 5
Graph 2: Table showing floor area per inmate………………………………………………………… 27

TABLE OF ANNEXTURES
Annex1: Area details for Afghan prisons………………………………………………………………… 30
Annex2: Summary of UNODC UNOPS Afghan Prison construction costs………………………….. 31
Annex3: Graph showing Capital Cost(USD) per inmate in different countries……………………… 32

ACRONYMS
LPDC (Afghan) Law of Prisons and Detention Centers
ANDS Afghan National Development Strategy
UNISMR United Nations International Standard Minimum Rules
INL International Narcotics Law
CPD Central Prisons Department
USCSSP United States Corrections Sector Support Program
MoJ Ministry of Justice – Afghanistan
UNAMA United Nations Assistance Mission in Afghanistan UNODC United Nations Office on Drugs and Crime UNOPS United Nations Office for Project Services
CFC-A Coalition Forces C-A
PREFACE

This report is intended for use by any within the Afghan justice and prison institutions concerned with prison construction and rehabilitation. It gives an outline of United Nations Office of Drugs and Crime (UNODC) and United Nations Office for Project Services (UNOPS) experiences in Afghanistan. It may highlight the problems faced and possible solutions identified along with lessons learnt and success stories.



As contemporary pioneers dealing with Afghan prison construction & rehabilitation, the experience gained could be a useful instrument for Afghan institutions and the donor community for the planning and implementation of future prison projects.


UNODC commenced work within the Afghanistan justice and prison system refo
0/5000
Từ: -
Sang: -
Kết quả (Việt) 1: [Sao chép]
Sao chép!
XÂY DỰNG NHÀ TÙ VÀ PHỤC HỒI CHỨC NĂNG PHÁT HIỆN VÀ KHUYẾN NGHỊKinh nghiệm thu được bởi UNODC UNOPS tháng 6 năm 2003 – tháng 3 năm 2009 AcknowledgmentsBáo cáo này đã được chuẩn bị bởi bà Carla Ciavarella-tư pháp chương trình điều phối viên của Liên Hiệp Quốc văn phòng ma túy và tội phạm (UNODC) và ông Braye Sutherland-nhà tù và xây dựng chuyên gia thiết kế của Liên Hiệp Quốc văn phòng cho dự án dịch vụ (UNOPS).Các tác giả muốn cảm ơn tất cả tham gia với phục hồi chức năng nhà tù và xây dựng chương trình trong Afghanistan đến nay, tất cả mọi người tham gia đã cho thấy quan tâm bao la và lái xe để xây dựng một hệ thống nhà tù hoạt động, nhân đạo và hiệu quả. Đặc biệt, chúng tôi muốn cảm ơn:• Excellencies ông Abdul Rahim Karimi (cựu bộ trưởng tư pháp từ năm 2003-2005) và ông của mìnhSarwar Đan Mạch, bộ trưởng tư pháp hiện tại-Afghanistan.• Thủ trưởng của Trung tâm nhà tù vùng (CPD), tướng Abdul Salam Bakhshi (từ năm 2003 đến năm 2007)và Gen Abdul Salam Isamat trong khả năng hiện tại của mình cùng với tất cả nhân viên của họ.• UNODC nhân viên tại Kabul, cụ thể; Ông Radifullah Hamid, ông Sayed Yen Sherzad, Ms.Doris Buddenberg, trong khả năng của mình như UNODC quốc gia đại diện (từ 2004-2006), Ms Christina Oguz UNODC hiện CR, ông Alexandre Shimdt Mariacarmen Colitti, Matteo Pasquali.• UNOPS nhân viên tại Kabul; Enayatullah Zafarzai, Aziz Ahmad Hadad, Sher Afghanistan, Hedayatullah, Mangal, Abdul.Samad, Saifullah Sallimee, John McDonnell, Gordon Nuttall, Jan Ratts, tất cả trong các đơn vị cấu trúc theo chiều dọc. BẢNG NỘI DUNGACRONYMS ...................................................................................................................................... 4PREFACE .......................................................................................................................................... 51.0 TƯ PHÁP, LUẬT PHÁP VÀ NHÀ TÙ Ở AFGHANISTAN... 72.0 HỆ THỐNG NHÀ TÙ HIỆN TẠI... 83.0 INTENT ........................................................................................................................................ 104.0 INITIAL APPROACH .................................................................................................................... 115.0 NHÀ TÙ AFGHANISTAN THIẾT KẾ KHÓ KHĂN... 126.0 NHỮNG PHÁT HIỆN KỸ THUẬT CHUNG... 127.0 GIẢI PHÁP KỸ THUẬT CỤ THỂ... 137.1 External Boundary Walls ....................................................................................................... 147.2 nội bộ bức tường phân chia-thứ hai hàng rào... 157.3 thứ ba tường tích phân và khu vực tập thể dục... 157.4 Section ................................................................................................................................... 167.5 Female + Children ................................................................................................................. 187.6 Office and First Security ........................................................................................................ 197.7 Kitchen ................................................................................................................................... 197.8 Visits ...................................................................................................................................... 217.9 Vocational .............................................................................................................................. 227.10 Clinic .................................................................................................................................... 237.11 Doors and Windows ............................................................................................................ 237.12 Infrastructure........................................................................................................................ 247.12.1 Electricity..................................................................................................................... 247.12.2 Heating........................................................................................................................ 257.12.3 Water........................................................................................................................... 257.12.4 Sewerage .................................................................................................................... 258.0 FINDINGS .................................................................................................................................... 268.1 Negative factors..................................................................................................................... 268.2 Cost ....................................................................................................................................... 268.3 Ongoing Problems ................................................................................................................. 279.0 RECOMMENDATIONS.............................................................................................................. 2810.0 REFERENCES........................................................................................................................... 29TABLE OF FIGURESFigure 1:Kabul male detention centre – prior to rehabilitation……………………………………………5Figure 2:Masons building new wall Kabul Female & Juvenile Facility…………………………………..6Figure 3:Female & Juvenile Facility Visits Centre…………………………………………………………6Figure 4:Pol-e-Charki Damaged prison now high security wiring………………………………………. 8Figure 5:Gardez prison damaged wing - now repaired…………………………………………………. 8Figure 6:Gardez toilets inside the section…………………………………………………………………. 9Figure 7:Kabul male detention centre dormitory prior to works…………………………………………. 9Figure 8:Pol-e-Charki new high security compound for serious drug offenders……………………..10Figure 9:3D image of the proposed new Gardez medium security provincial prison……………….. 11Figure 10:Prison kitchen - showing open plan, central food preparation bench & fire brick stoves.. 13Figure 11:Gardez under construction winter…………………………………………………………….. 13Figure 12:Gardez Mud wall – rehabilitated & heightened……………………………………………… 14Figure 13:Gardez prison mud boundary wall prior to rehabilitation works…………………………….14Figure 14:Mazar provincial prison new excavation for boundary wall ……………………………….. 15Figure 15:Schematic diagram showing the principle floor plan & security room view area………… 16Figure 16:Schematic diagram showing inmate flow and control …………………………………….…17Figure 17:Female and children section under construction – Kabul August 2007……………………18Figure 18: New wood fired stove. Fire brick and steel construction with steel covers……………..…20Figure 19: Secure single visit – High Security Facility ….……………………………………...……..…21Figure 20: High security cell door ….…………………………………..………………………….…….…23Figure 21: Corridor partition gate………………………….……………………………………….…….…23Figure 22: Generators and fuel store – Expensive to run and install ………………………….……….24Figure 23: Juvenile Female yard showing inner fence and visual barrier with outer fence behind….27 TABLE OF GRAPHSGraph 1: Table showing contemporary inmate population……………………………………………… 5Graph 2: Table showing floor area per inmate………………………………………………………… 27TABLE OF ANNEXTURESAnnex1: Area details for Afghan prisons………………………………………………………………… 30Annex2: Summary of UNODC UNOPS Afghan Prison construction costs………………………….. 31
Annex3: Graph showing Capital Cost(USD) per inmate in different countries……………………… 32

ACRONYMS
LPDC (Afghan) Law of Prisons and Detention Centers
ANDS Afghan National Development Strategy
UNISMR United Nations International Standard Minimum Rules
INL International Narcotics Law
CPD Central Prisons Department
USCSSP United States Corrections Sector Support Program
MoJ Ministry of Justice – Afghanistan
UNAMA United Nations Assistance Mission in Afghanistan UNODC United Nations Office on Drugs and Crime UNOPS United Nations Office for Project Services
CFC-A Coalition Forces C-A
PREFACE

This report is intended for use by any within the Afghan justice and prison institutions concerned with prison construction and rehabilitation. It gives an outline of United Nations Office of Drugs and Crime (UNODC) and United Nations Office for Project Services (UNOPS) experiences in Afghanistan. It may highlight the problems faced and possible solutions identified along with lessons learnt and success stories.



As contemporary pioneers dealing with Afghan prison construction & rehabilitation, the experience gained could be a useful instrument for Afghan institutions and the donor community for the planning and implementation of future prison projects.


UNODC commenced work within the Afghanistan justice and prison system refo
đang được dịch, vui lòng đợi..
Kết quả (Việt) 2:[Sao chép]
Sao chép!














XÂY DỰNG NHÀ TÙ VÀ KẾT QUẢ VÀ ĐỀ XUẤT CẢI TẠO Kinh nghiệm thu được bởi UNODC UNOPS tháng 6 năm 2003 - tháng 9 năm 2007 Lời cảm ơn Báo cáo này được chuẩn bị bởi bà Carla Ciavarella - Điều phối viên Chương trình Tư pháp của Văn phòng Liên Hiệp Quốc về Ma túy và Tội phạm (UNODC) và ông Braye Sutherland - Prison và Xây dựng thiết kế chuyên gia của Văn phòng Liên Hiệp Quốc về dịch vụ dự án (UNOPS). Các tác giả xin cảm ơn tất cả liên quan đến việc phục hồi tù và chương trình xây dựng trong phạm vi Afghanistan cho đến nay, tất cả mọi người tham gia đã thể hiện sự quan tâm to lớn và lái xe tới xây dựng một chức năng, nhân đạo và hiệu quả hệ thống nhà tù. Đặc biệt chúng tôi muốn cảm ơn: • Thưa ông, ông Abdul Rahim Karimi (cựu Bộ trưởng Tư pháp 2003-2005) và ông. Sarwar Đan Mạch, hiện nay Bộ trưởng Bộ Tư pháp - Afghanistan • Người đứng đầu của nhà tù Trung Bộ (CPD), Tướng Abdul Salam Bakhshi (2003-2007) và Gen Abdul Salam Isamat trong khả năng hiện tại của mình cùng với tất cả các nhân viên của họ. • Nhân viên UNODC tại Kabul, nói riêng; Ông Radifullah Hamid, ông Sayed Afzal Sherzad, Ms.Doris Buddenberg, trong khả năng của mình như là UNODC Country Rep (2004-2006), bà Christina Oguz UNODC hiện CR, ông Alexandre Shimdt Mariacarmen Colitti, Matteo PASQUALI. • UNOPS Nhân viên tại Kabul; Enayatullah Zafarzai, Aziz Ahmad Hadad, Sher Afghanistan, Hedayatullah, Mangal, Abdul.Samad, Saifullah Sallimee, John McDonnell, Gordon Nuttall, Jan Ratts, tất cả nằm trong cấu trúc đơn vị dọc. MỤC LỤC TỪ VIẾT 4 LỜI NÓI ĐẦU 5 1.0 CÔNG LÝ, QUY LUẬT VÀ tù ở Afghanistan ....................................... ........... 7 2.0 HỆ THỐNG HIỆN HỮU TÙ ................................. .................................................. .......... 8 3.0 Ý ĐỊNH 10 4.0 PHƯƠNG PHÁP ĐẦU 11 5.0 Afghanistan HẠN TÙ DESIGN ............................................ .................................. 12 6.0 KẾT QUẢ CHUNG KỸ THUẬT ........... .................................................. ............................... 12 7.0 GIẢI PHÁP KỸ THUẬT CỤ .............. .................................................. ......................... 13 7.1 Walls ranh giới ngoài 14 7.2 Nội Divisional Walls - Fence Secondary .......................................... .............................. 15 Tập thể dục Area 7.3 Tường Thứ ba Integral và ............ .................................................. ..................... 15 7.4 Mục 16 7.5 Nữ + Trẻ em 18 7.6 Văn ​​phòng và An ninh đầu tiên 19 7.7 bếp 19 7.8 Thăm 21 7.9 Dạy nghề 22 7.10 Clinic 23 7.11 Cửa và Windows 23 7.12 24 7.12.1 24 7.12.2 25 7.12.3 25 7.12.4 thoát 25 8.0 KẾT QUẢ 26 8.1 Negative 26 8.2 Chi phí 26 8.3 Vấn đề đang thực hiện 27 9.0 28 10,0 29 MỤC HÌNH Hình 1: trung tâm giam giữ nam Kabul - trước khi phục hồi chức năng ................................................... 5 Hình 2: Masons xây dựng tường mới Kabul Nữ & Juvenile sở ............... ........................ ..6 Hình 3: Nữ & Juvenile thăm Cơ sở Trung tâm .................................................................. 6 Hình 4: Pol-e- Charki Hư tù bây giờ dây bảo mật cao .............................................. 8 Hình 5: tù Gardez cánh bị hư hỏng - lỗi đã được sửa .......................................................... 8 Hình 6: Gardez nhà vệ sinh bên trong phần ............................................................................ 9 Hình 7: Kabul nam trung tâm giam giữ ký túc xá trước khi công trình ................................................. 9 Hình 8: Pol-e-Charki mới hợp chất bảo mật cao cho tội phạm ma túy nghiêm trọng ........................ ..10 Hình 9: hình ảnh 3D của các nhà tù an ninh vừa đề xuất mới Gardez tỉnh .................. .. 11 Hình 10: Prison bếp - hiện kế hoạch mở, trung tâm băng ghế dự bị chế biến thực phẩm & bếp gạch chịu lửa .. 13 Hình 11: Gardez dưới mùa đông xây dựng ............................................................... ...... .. 13 Hình 12: Gardez Mud tường - cải tạo & nâng cao ...................................................... 14 Hình 13: Gardez tù bùn tường ranh giới trước khi trình phục hồi ............ ..................... .14 Hình 14: Mazar tù tỉnh khai quật mới cho bức tường ranh giới .................................... .. 15 Hình 15: Sơ đồ cho thấy các kế hoạch sàn & phòng an ninh khu vực xem nguyên tắc ............ 16 Hình 16: Sơ đồ cho thấy lưu lượng tù nhân và kiểm soát .......................................... ... 17. Hình 17: Nữ và trẻ em phần được xây dựng - Kabul tháng 8 năm 2007 ............... ......... 18 Hình 18: gỗ mới bị sa thải lò. Gạch chịu lửa và thép xây dựng với thép bao gồm ............... .. ... 20 Hình 19:. Bảo single lần - cao An ninh ... .......................................... ... ...... .. ... 21 Hình 20: cửa ô an ninh cao ... ....................................... .. .............................. ...... ... 23... Hình 21: cổng phân vùng Hành lang ...... ... ........................ ............................................. ...... ... 23 Hình 22: Máy phát điện và cửa hàng xăng dầu - đắt để chạy và cài đặt ..................... . ......... ......... .24 Hình 23: Vị Thành Niên Nữ sân cho thấy hàng rào bên trong và rào cản thị giác với hàng rào bên ngoài phía sau ... 0,27 TABLE của đồ thị Biểu đồ 1: Bảng hiển thị tù nhân đương đại ................................. dân ..................... 5 Biểu đồ 2: Bảng hiển thị diện tích sàn mỗi tù nhân .................................................................. 27 BIỂU ANNEXTURES Annex1: Các chi tiết Khu nhà tù Afghanistan ........................................................................... 30 Annex2: Tóm tắt của UNODC UNOPS chi phí xây dựng nhà tù Afghanistan .............................. .. 31 Annex3 : Biểu đồ cho thấy chi phí vốn (USD) cho mỗi tù nhân ở các nước khác nhau ........................... 32 CHỮ LPDC (Afghanistan) Luật của nhà tù và trung tâm giam giữ ands Afghanistan Quốc Chiến lược phát triển UNISMR United Nations International chuẩn tối thiểu quy luật INL International ma túy CPD Trung Tù cục USCSSP Hoa Kỳ sửa chữa Ngành Chương trình Hỗ trợ Bộ Tư pháp Tư pháp - Afghanistan Nhiệm vụ Hỗ trợ UNAMA Liên Hợp Quốc tại Afghanistan Văn phòng Liên Hợp Quốc UNODC về Ma túy và Tội phạm của Văn phòng UNOPS United Nations Dịch vụ Dự án CFC-A Lực lượng Liên minh CA LỜI NÓI ĐẦU Báo cáo này được dự định để sử dụng bởi bất kỳ trong công lý và tổ chức nhà tù Afghanistan liên quan đến xây dựng nhà tù và phục hồi chức năng. Nó đưa ra một phác thảo của Văn phòng Liên Hiệp Quốc về Ma túy và Tội phạm (UNODC) và Văn phòng Liên Hợp Quốc về dịch vụ dự án (UNOPS) kinh nghiệm ở Afghanistan. Nó có thể làm nổi bật những vấn đề phải đối mặt và giải pháp có thể được xác định cùng với những bài học và câu chuyện thành công. Là người tiên phong hiện đại đối phó với việc xây dựng nhà tù Afghanistan và phục hồi chức năng, các kinh nghiệm thu được có thể là một công cụ hữu ích cho các tổ chức Afghanistan và cộng đồng các nhà tài trợ cho việc lập kế hoạch và thực hiện dự án tù tương lai. UNODC bắt đầu làm việc trong Afghanistan công lý và hệ thống nhà tù refo

































































































































đang được dịch, vui lòng đợi..
 
Các ngôn ngữ khác
Hỗ trợ công cụ dịch thuật: Albania, Amharic, Anh, Armenia, Azerbaijan, Ba Lan, Ba Tư, Bantu, Basque, Belarus, Bengal, Bosnia, Bulgaria, Bồ Đào Nha, Catalan, Cebuano, Chichewa, Corsi, Creole (Haiti), Croatia, Do Thái, Estonia, Filipino, Frisia, Gael Scotland, Galicia, George, Gujarat, Hausa, Hawaii, Hindi, Hmong, Hungary, Hy Lạp, Hà Lan, Hà Lan (Nam Phi), Hàn, Iceland, Igbo, Ireland, Java, Kannada, Kazakh, Khmer, Kinyarwanda, Klingon, Kurd, Kyrgyz, Latinh, Latvia, Litva, Luxembourg, Lào, Macedonia, Malagasy, Malayalam, Malta, Maori, Marathi, Myanmar, Mã Lai, Mông Cổ, Na Uy, Nepal, Nga, Nhật, Odia (Oriya), Pashto, Pháp, Phát hiện ngôn ngữ, Phần Lan, Punjab, Quốc tế ngữ, Rumani, Samoa, Serbia, Sesotho, Shona, Sindhi, Sinhala, Slovak, Slovenia, Somali, Sunda, Swahili, Séc, Tajik, Tamil, Tatar, Telugu, Thái, Thổ Nhĩ Kỳ, Thụy Điển, Tiếng Indonesia, Tiếng Ý, Trung, Trung (Phồn thể), Turkmen, Tây Ban Nha, Ukraina, Urdu, Uyghur, Uzbek, Việt, Xứ Wales, Yiddish, Yoruba, Zulu, Đan Mạch, Đức, Ả Rập, dịch ngôn ngữ.

Copyright ©2025 I Love Translation. All reserved.

E-mail: