- Final drawings and information corresponding to above sub-clause (5);- Preliminary wiring drawings and arrangements of the electrical equipment, items and cubicles;- Preliminary cabling arrangement diagrams for the whole of equipment, and preliminary fire alarm arrangement drawings;- Preliminary cable schedules and termination diagrams.
đang được dịch, vui lòng đợi..
