Stage 1: 15th Dec 2015: Sign Contract
Stage 2: 31st Dec 2015: Deposit 30% : 16,500 USD
Stage 3: 15th January 2016
: 60% After Receive and approve : 33,000 USD
1. Flagship & department Store Design Concept in 2D & 3D
2. Image college
3. Floor Plan 1/50
4. Ceiling Plan 1/50
5. Image Perspective
6. Main material Plan
7. Interview and choose the Constructor
Stage 4: 31st March 2016: Supervision Construction and finish for Flagship Store: 10%: 5,500 USD