Crude oil is stabilized on the FPU-DH-01 and offloaded to the Floating Storage and Offloading Vessel (FSO) which is moored to the Catenary Anchor Leg Mooring (CALM) buoy. Crude oil can be transferred to the CALM buoy by two dedicated 150 mm NB subsea flowlines, and then from the CALM buoy to the FSO-Kamari by means of a 150 mm NB floating hose. The dynamic parts of flowlines and umbilicals are supported by Mid-depth buoys, the larger one from Starboard side of FPU-DH-01 with 20 slots, the second one from aft side of FPU-DH-01 with 12 slots, the third one from forward side with 9 slots and the last one for export flowline to Calm Buoy. The fixed WHP is located in South West direction of existing production platform (DH-01) at a distance of approximate 5km. WHP-DH2 is based on an unmanned wellhead platform located over a drilling template with 12 slots. The platform was tied back to and remotely operated from the FPU-DH1. Two 6” flowlines were used to transport liquids from the WHP-DH2 to the FPU-DH1 and one pipeline 16’’ gets a distance of approximate 20km to transport the export gas to Thien Ung platform. WHP DH-02 is controlled and supplied energy from FPU DH-01 by a submarine cable.
đang được dịch, vui lòng đợi..
