Aim:To examine the process of planning as a function of managementTasksA team leader is chosen. This position will rotate through all activities.Each team will be given drinking straws, a roll of sticky tape and a pair of scissors.The task is for the team to design then build a tower structure out of straws and sticky tape. Time allowedfor construction is 30 minutes. Time will be allowed for planning.The structure MUST: Be free standing and self supporting. Carry the names of each team member on a flag that must be secured to the structure, but mustNOT be secured by sticky tape. The flag must be more than 20 cm from the base and must not be fixed to the top of the structure.A plan must be completed prior to commencing construction and must be presented, confidentially to yourtutor. Your group does not have to stay with this plan if they feel during construction other options are moreworthwhile.