YR001Swan River Pedestrian Bridge ProjectForStructural Design Report - dịch - YR001Swan River Pedestrian Bridge ProjectForStructural Design Report - Việt làm thế nào để nói

YR001Swan River Pedestrian Bridge P

YR001
Swan River Pedestrian Bridge Project
For
Structural Design Report - 15%
Document No: SRPB-001-REP-ST-1001
Designer Document No:
Copy No. Revision Registered Holder Location
1 A York/Rizzani de
Eccher
1st Floor, 140 Abernethy Road
Belmont, WA 6984
2 A Main Roads Western
Australia
Don Aitken Centre, Waterloo Crescent,
East Perth, WA 6004
Revision Date Details Developed By:
(Name/Title)
Authorised By:
(Name/Title) Signature
A 06/07/2015 Issued for 15%
Design
Massimo
Majowiecki
Discipline Design
Manager
Giammaria
Gentile
Design Manager
YR001 - Swan River Pedestrian Bridge Project | Structural Design Report - 15%
Revision History
Rev Detailed Description
A Issued for 15% Design
Designer Document Control
Revision Date Details Prepared By:
(Name/Title/Sign)
Reviewed By:
(Name/Title/Sign)
Approved By:
(Name/Title/Sign)
A 06/07/2015 Issued for 15%
Design
Giovanni Berti
Discipline
Engineer
Michele Rizzato
Senior Discipline
Engineer
Massimo
Majowiecki
Discipline Lead
Engineer
YR001 - Swan River Pedestrian Bridge Project | Structural Design Report - 15%
Table of Contents
1. Introduction ................................................................................................................................... 1
1.1 Project Description .................................................................................................................. 1
1.2 Purpose of this Report ............................................................................................................ 1
1.3 Compliance with SWTC .......................................................................................................... 1
1.4 Abbreviations and Definitions.................................................................................................. 2
2. Scope of Work ............................................................................................................................... 3
2.1 Principal items to be designed ................................................................................................ 3
3. Previous Work ............................................................................................................................... 4
3.1 Tender Design......................................................................................................................... 4
4. Design Criteria and Standards..................................................................................................... 5
4.1 Design Compliance ................................................................................................................. 5
4.2 Constraints, Limitations and Assumptions ............................................................................ 18
4.3 Design References and Inputs.............................................................................................. 19
4.4 Structural Design................................................................................................................... 22
5. Design Description ..................................................................................................................... 32
5.1 15% Design........................................................................................................................... 32
5.2 Interdisciplinary Design Interface.......................................................................................... 32
5.3 Alternative designs and associated cost estimates .............................................................. 33
5.4 Bridge .................................................................................................................................... 35
5.5 Approaches ........................................................................................................................... 48
6. Safety in Design .......................................................................................................................... 49
7. Constructability and Staging ..................................................................................................... 50
7.1 Safety .................................................................................................................................... 50
7.2 Erection stages...................................................................................................................... 50
8. Operations and Maintenance..................................................................................................... 52
9. Design Verification Trough WT Test ......................................................................................... 53
9.1 Investigations about wind loads ............................................................................................ 53
9.2 Investigations about comfort for vibration due to pedestrian loads....................................... 54
YR001 - Swan River Pedestrian Bridge Project | Structural Design Report - 15%
10. Conclusion and Recommendations.......................................................................................... 58
10.1 Conclusion............................................................................................................................. 58
10.2 Recommendations ................................................................................................................ 58
Appendix A .......................................................................................................................................... 59
Validation of the F.E. program in accordance with AS 4100 ............................................................ 59
YR001 - Swan River Pedestrian Bridge Project | Structural Design Report -
15% 1
1. Introduction
1.1 Project Description
The State Government of Western Australia is planning a new 60,000 to 70,000 seat major sports
stadium and sports precinct at Burswood, Western Australia. The proposed transport infrastructure
associated with this sports precinct includes the construction of an approximately 400 m long Swan
River Pedestrian Bridge that will cross the Swan River from the East Perth foreshore (western river
bank) to the western side of the Burswood Peninsula (eastern river bank). The primary objective of the
Project is to produce an innovative signature structure that will serve as an entry statement to the new
Perth Stadium and the precinct parkland from an integrated, design-lead approach.
The project will be delivered as a Design and Construct contract and the scope of works will broadly
include:
 design and construction of Footbridge No. 9406 over the Swan River;
 eastern approach connecting the bridge to the new Perth Stadium path network at the Burswood
Peninsula;
 western approach connecting the bridge to the northern end of the Nelson Avenue Special Events
Bus Stand in East Perth;
 earthworks, footpath and street lighting;
 design and installation of landscaping and revegetation;
 lighting;
 public art;
 utilities relocation;
 roadworks.
1.2 Purpose of this Report
The Structural Design Report demonstrates how the design of the Structures meets the requirements
nominated in the RFP and SWTC. This report will:
 Describe the main structures across the project, including the bridge;
 Document assumptions and key design criteria;
 Provide a description of the design highlighting value, safety and quality considerations;
 Describe technical inputs to the design;
 Demonstrate compliance to the SWTC key criteria.
1.3 Compliance with SWTC
The Structural Design Report and the drawings have been developed in compliance with the SWTC
requirements. Specifically, they detail the structural design and documentation and contain the relevant
information to demonstrate the ability to meet the design obligations detailed in the Scope of Works and
Technical Criteria.
YR001 - Swan River Pedestrian Bridge Project | Structural Design Report -
15% 2
1.4 Abbreviations and Definitions
1.4.1 Abbreviations
 AS: Australian Standard
 AS/NZS : Australian / New Zealand Standard
 DCD: Detailed Concept Design
 FWHA: Federal Highway Administration - USA
 MRWA: Main Roads Western Australia
 SWTC : Scope of Work and Technical Criteria
1.4.2 Definitions
No relevant definitions requiring clarifications are adopted.
YR001 - Swan River Pedestrian Bridge Project | Structural Design Report -
15% 3
2. Scope of Work
2.1 Principal items to be designed
The Scope of Works includes all structural design activities concerning the Structural design of:
 Bridge superstructure (arches and deck);
 Bridge substructure (piers);
 Bridge foundation (piles, geotechnical design not included);
 Approaches (superstructure, substructure and piles, geotechnical design not included).
YR001 - Swan River Pedestrian Bridge Project | Structural Design Report -
15% 4
3. Previous Work
3.1 Tender Design
During the Tender design the following activities have been performed:
 Preliminary analysis of arches and deck;
 Preliminary analysis of piers under the actions transmitted by the arches and the deck;
 Preliminary analysis of action transmitted to piles of piers;
 Preliminary analysis of approaches.
YR001 - Swan River Pedestrian Bridge Project | Structural Design Report -
15% 5
4. Design Criteria and Standards
4.1 Design Compliance
The structural design has been developed in compliance with the SWTC requirement. The
table below demonstrates compliance with the requirements and summaries the key technical
requirements.
TAB. 4.1-1
Clause Item Description
R:Required
O:Optional
Design
assumption
DESIGN QUALITY & PERFORMANCE REQUIREMENTS
3.4 Component
Design Life Component design Life:
Bridge works and retaining walls
– 100 years R
Earthquake
values; cover to
reinforcement
Protective coatings to steelwork
– 25 years R
To be assessed in
the future stage of
design
DURABILITY
3.6(c)(i) Durability
To provide assurance to Main
Roads that the durabilit
0/5000
Từ: -
Sang: -
Kết quả (Việt) 1: [Sao chép]
Sao chép!
YR001Dự án cầu người đi bộ Sông SwanChoBáo cáo thiết kế cấu trúc - 15%Tài liệu không: SRPB-001-REP-ST-1001Không có nhà thiết kế tài liệu:Bản sao số Phiên bản đăng ký giữ vị trí1 A York/Rizzani deEcchertầng 1, 140 Abernethy RoadBelmont, WA 69842 một tuyến đường chính TâyÚcTrung tâm Don Aitken, Waterloo Crescent,East Perth, WA 6004Xem chi tiết ngày phát triển bởi:(Tên/tiêu đề)Được ủy quyền bởi:(Tên/tiêu đề) Chữ kýMột 06/07/2015 phát hành 15%Thiết kếMassimoMajowieckiKỷ luật thiết kếQuản lýGiammariaGentileQuản lý thiết kếYR001 - dự án Swan River Pedestrian cầu | Báo cáo thiết kế cấu trúc - 15%Lịch sử sửa đổiRev mô tả chi tiếtA phát hành cho 15% thiết kếKiểm soát thiết kế tài liệuXem chi tiết ngày chuẩn bị bởi:(Tên/tiêu đề/dấu hiệu)Xem xét lại bởi:(Tên/tiêu đề/dấu hiệu)Được chấp thuận bởi:(Tên/tiêu đề/dấu hiệu)Một 06/07/2015 phát hành 15%Thiết kếGiovanni BertiKỷ luậtKỹ sưMichele RizzatoKỷ luật cao cấpKỹ sưMassimoMajowieckiKỷ luật chìKỹ sưYR001 - dự án Swan River Pedestrian cầu | Báo cáo thiết kế cấu trúc - 15%Bảng nội dung1. Introduction ................................................................................................................................... 11.1 Project Description .................................................................................................................. 11.2 Purpose of this Report ............................................................................................................ 11.3 Compliance with SWTC .......................................................................................................... 11.4 chữ viết tắt và định nghĩa... 22. Scope of Work ............................................................................................................................... 32.1 chính mục được thiết kế... 33. Previous Work ............................................................................................................................... 43.1 Tender Design......................................................................................................................... 44. thiết kế tiêu chuẩn và các tiêu chuẩn... 54.1 Design Compliance ................................................................................................................. 54.2 những hạn chế, hạn chế và giả định... 184.3 thiết kế tài liệu tham khảo và đầu vào... 194.4 Structural Design................................................................................................................... 225. Design Description ..................................................................................................................... 325.1 15% Design........................................................................................................................... 325.2 liên ngành thiết kế giao diện... 325.3 thay thế thiết kế và ước tính chi phí liên quan đến... 335.4 Bridge .................................................................................................................................... 355.5 Approaches ........................................................................................................................... 486. Safety in Design .......................................................................................................................... 497. constructability và dàn... 507.1 Safety .................................................................................................................................... 507.2 Erection stages...................................................................................................................... 508. Operations and Maintenance..................................................................................................... 529. thiết kế quy trình xác minh các thử nghiệm WT Trough... 539.1 các điều tra về gió tải... 539.2 các điều tra về sự thoải mái cho rung động do người đi bộ tải... 54YR001 - dự án Swan River Pedestrian cầu | Báo cáo thiết kế cấu trúc - 15%10. kết luận và khuyến nghị... 5810.1 Conclusion............................................................................................................................. 5810.2 Recommendations ................................................................................................................ 58Appendix A .......................................................................................................................................... 59Xác nhận của chương trình F.E. phù hợp với AS 4100... 59YR001 - dự án Swan River Pedestrian cầu | Báo cáo thiết kế cấu trúc-15% 11. giới thiệu1.1 Mô tả dự ánChính phủ tiểu bang Tây Úc đang có kế hoạch một môn thể thao chính 60.000 tới 70,000 chỗ mớistadium and sports precinct at Burswood, Western Australia. The proposed transport infrastructureassociated with this sports precinct includes the construction of an approximately 400 m long SwanRiver Pedestrian Bridge that will cross the Swan River from the East Perth foreshore (western riverbank) to the western side of the Burswood Peninsula (eastern river bank). The primary objective of theProject is to produce an innovative signature structure that will serve as an entry statement to the newPerth Stadium and the precinct parkland from an integrated, design-lead approach.The project will be delivered as a Design and Construct contract and the scope of works will broadlyinclude: design and construction of Footbridge No. 9406 over the Swan River; eastern approach connecting the bridge to the new Perth Stadium path network at the BurswoodPeninsula; western approach connecting the bridge to the northern end of the Nelson Avenue Special EventsBus Stand in East Perth; earthworks, footpath and street lighting; design and installation of landscaping and revegetation; lighting; public art; utilities relocation; roadworks.1.2 Purpose of this ReportThe Structural Design Report demonstrates how the design of the Structures meets the requirementsnominated in the RFP and SWTC. This report will: Describe the main structures across the project, including the bridge; Document assumptions and key design criteria; Provide a description of the design highlighting value, safety and quality considerations; Describe technical inputs to the design; Demonstrate compliance to the SWTC key criteria.1.3 Compliance with SWTCThe Structural Design Report and the drawings have been developed in compliance with the SWTCrequirements. Specifically, they detail the structural design and documentation and contain the relevantinformation to demonstrate the ability to meet the design obligations detailed in the Scope of Works andTechnical Criteria.YR001 - Swan River Pedestrian Bridge Project | Structural Design Report -15% 21.4 Abbreviations and Definitions1.4.1 Abbreviations AS: Australian Standard AS/NZS : Australian / New Zealand Standard DCD: Detailed Concept Design FWHA: Federal Highway Administration - USA MRWA: Main Roads Western Australia SWTC : Scope of Work and Technical Criteria1.4.2 DefinitionsNo relevant definitions requiring clarifications are adopted.YR001 - Swan River Pedestrian Bridge Project | Structural Design Report -15% 32. Scope of Work2.1 Principal items to be designedThe Scope of Works includes all structural design activities concerning the Structural design of: Bridge superstructure (arches and deck); Bridge substructure (piers); Bridge foundation (piles, geotechnical design not included); Approaches (superstructure, substructure and piles, geotechnical design not included).YR001 - Swan River Pedestrian Bridge Project | Structural Design Report -15% 43. Previous Work3.1 Tender DesignDuring the Tender design the following activities have been performed: Preliminary analysis of arches and deck; Preliminary analysis of piers under the actions transmitted by the arches and the deck; Preliminary analysis of action transmitted to piles of piers; Preliminary analysis of approaches.YR001 - Swan River Pedestrian Bridge Project | Structural Design Report -15% 54. Design Criteria and Standards4.1 Design ComplianceThe structural design has been developed in compliance with the SWTC requirement. Thetable below demonstrates compliance with the requirements and summaries the key technicalrequirements.TAB. 4.1-1Clause Item DescriptionR:RequiredO:OptionalDesignassumptionDESIGN QUALITY & PERFORMANCE REQUIREMENTS3.4 ComponentDesign Life Component design Life:Bridge works and retaining walls– 100 years REarthquakevalues; cover toreinforcementProtective coatings to steelwork– 25 years RTo be assessed inthe future stage ofdesignDURABILITY3.6(c)(i) DurabilityTo provide assurance to MainRoads that the durabilit
đang được dịch, vui lòng đợi..
Kết quả (Việt) 2:[Sao chép]
Sao chép!
YR001
sông Swan Pedestrian Dự án Cầu
Đối với
cấu Báo cáo Thiết kế - 15%
văn bản số: SRPB-001-REP-ST-1001
thiết kế văn bản số:
Sao chép số Revision Thành Chủ Location
1 A York / Rizzani de
Eccher
1st Floor, 140 Abernethy Road
Belmont , WA 6984
2 A Đường Main Tây
Úc
Don Aitken Centre, Waterloo Crescent,
Đông Perth, WA 6004
Chi tiết Revision Ngày Phát triển bởi:
(Tên / Title)
ủy quyền bởi:
(Tên / Title) Signature
Một 2015/06/07 Ban hành 15 %
Thiết kế
Massimo
Majowiecki
Kỷ luật Thiết kế
Quản lý
Giammaria
Gentile
Design Manager
YR001 - Sông Swan Pedestrian Dự án Cầu | Kết cấu Báo cáo Thiết kế - 15%
Revision History
Rev Chi tiết
A đã cấp với 15% Kiểu dáng
thiết kế tài liệu kiểm soát
chi tiết Revision ngày chuẩn bị bởi:
(Tên / Tên / Đăng nhập)
Đánh giá bởi:
(Tên / Tên / Đăng nhập)
được chấp thuận bởi:
(Tên / Tên / Đăng nhập)
Một 2015/06/07 đã cấp với 15%
Thiết kế
Giovanni Berti
Kỷ luật

Michele Rizzato
Senior Kỷ luật

Massimo
Majowiecki
Kỷ luật Lead
Engineer
YR001 - Swan Dự án sông Cầu bộ hành | Kết cấu Báo cáo Thiết kế - 15%
Mục lục
1. Sự giới thiệu 1
Mô tả 1.1 Dự án 1
1.2 Mục đích của Báo cáo này 1
1.3 Tuân thủ SWTC 1
1.4 Các chữ viết 2
2. Phạm vi công việc 3
2.1 mục chính được thiết kế ........................................... .................................................. ... 3
3. Làm việc trước 4
3.1 Tender 4
4. Tiêu chí thiết kế và 5
4.1 Thiết kế Tuân 5
4.2 Các ràng buộc, hạn chế và giả định ........................................... ................................. 18
4.3 Tài liệu tham khảo Thiết kế và đầu vào ........... .................................................. ................................. 19
4.4 Kết cấu 22
5. Thiết kế Mô tả 32
5.1 15% 32
5.2 Thiết kế giao diện liên ngành ............................................. ............................................. 32
5.3 thiết kế thay thế và dự toán chi phí liên quan ............................................... ............... 33
5.4 Cầu 35
5.5 Phương pháp tiếp cận 48
6. An toàn trong thiết kế 49
7. năng xây dựng và Staging 50
7.1 An toàn 50
7.2 Lắp máy 50
8. Vận hành và 52
9. Thiết kế Verification Trough WT nghiệm .......................................... ............................................... 53
9.1 Điều tra về tải trọng gió ............................................... ............................................. 53
9.2 Điều tra về thoải mái rung động do tải trọng người đi bộ ....................................... 54
YR001 - Sông Swan Dự án cầu cho người đi bộ | Kết cấu Báo cáo Thiết kế - 15%
10. Kết luận và 58
10.1 58
10.2 Các khuyến nghị 58
Phụ lục A 59
Xác nhận của chương trình FE theo AS 4100 ....................................... ..................... 59
YR001 - Sông Swan bộ hành dự án cầu | Kết cấu Báo cáo Thiết kế -
15% 1
1. Giới thiệu
1.1 Mô tả dự án
Nhà nước Chính phủ của bang Tây Úc kế hoạch 60.000 đến 70.000 chỗ ngồi thể thao lớn mới
sân vận động và thể thao khu vực bầu cử tại Burswood, Western Australia. Các cơ sở hạ tầng giao thông vận tải đề xuất
kết hợp với khuôn viên thể thao này bao gồm việc xây dựng một khoảng 400 m dài Swan
cầu cho người đi bộ sông đó sẽ băng qua sông Swan từ bờ Đông Perth (sông phía tây
của ngân hàng) tới phía tây của bán đảo Burswood (bờ sông phía đông ). Mục tiêu chính của
dự án là tạo ra một cấu trúc chữ ký sáng tạo sẽ phục vụ như là một tuyên bố nhập cảnh vào mới
sân vận động Perth và công viên khu vực bầu cử từ một phương pháp thiết kế-dẫn tích hợp.
Dự án sẽ được cung cấp như một Thiết kế và Xây dựng hợp đồng và phạm vi công việc rộng sẽ
bao gồm:
 Thiết kế và xây dựng các Footbridge số 9406 trên sông Swan;
 cách tiếp cận phía đông nối cầu với mạng đường Perth Sân vận động mới tại Burswood
bán đảo;
 cách tiếp cận phía tây nối cầu đến cuối phía bắc của sự kiện Nelson Avenue đặc biệt
Bus Đứng ở Đông Perth;
 đào đắp, lối đi bộ và chiếu sáng đường phố,
thiết kế và lắp đặt các cảnh quan và hệ thực vật ;
 chiếu sáng;
 nghệ thuật công cộng;
 tiện ích di dời;
 công trường thi công.
1.2 Mục đích của Báo cáo này
Các cấu Báo cáo Thiết kế trình bày cách thiết kế của các cấu trúc đáp ứng được các yêu cầu
đề cử trong RFP và SWTC. Báo cáo này sẽ:
 Mô tả các cấu trúc chính trên toàn dự án, bao gồm cả cây cầu;
 giả tài liệu và tiêu chuẩn thiết kế trọng điểm;
 Cung cấp một mô tả thiết kế làm nổi bật những cân nhắc giá trị, độ an toàn và chất lượng;
 Mô tả đầu vào kỹ thuật để thiết kế;
 Thể hiện việc tuân thủ các tiêu chí quan trọng SWTC.
1.3 Tuân thủ SWTC
Báo cáo thiết kế kết cấu và các bản vẽ đã được xây dựng phù hợp với các SWTC
yêu cầu. Cụ thể, họ chi tiết thiết kế cấu trúc và tài liệu hướng dẫn và chứa những liên quan
thông tin để chứng minh khả năng đáp ứng các nghĩa vụ thiết kế chi tiết trong phạm vi công trình và
tiêu chuẩn kỹ thuật.
YR001 - Sông Swan Pedestrian Dự án Cầu | Kết cấu Báo cáo Thiết kế -
15% 2
1.4 Các từ viết tắt Các định nghĩa và
1.4.1 viết tắt
 AS: Tiêu chuẩn Úc
 AS / NZS: Úc / New Zealand chuẩn
 DCD: Khái niệm Thiết kế chi tiết
 FWHA: Federal Highway Administration - USA
 MRWA: Đường Main Western Australia
 SWTC: Phạm vi công việc và kỹ thuật Tiêu chuẩn
1.4.2 Định nghĩa
Không có định nghĩa liên quan cần làm rõ được thông qua.
YR001 - Sông Swan bộ hành dự án cầu | Kết cấu Báo cáo Thiết kế -
15% 3
2. Phạm vi công việc
2.1 mục chính được thiết kế
Phạm vi công trình bao gồm tất cả các hoạt động liên quan đến việc thiết kế kết cấu Thiết kế kết cấu của:
 Cầu trúc thượng tầng (vòm và sàn);
 Cầu substructure (trụ);
 Cầu móng (cọc, thiết kế địa kỹ thuật không bao gồm);
 Phương pháp tiếp cận (cấu trúc thượng tầng, nền móng và cọc, thiết kế địa kỹ thuật không bao gồm).
YR001 - Swan Dự án sông Cầu bộ hành | Kết cấu Báo cáo Thiết kế -
15% 4
3. Làm việc trước
3.1 Đấu thầu Thiết kế
Trong Tender thiết kế các hoạt động sau đây đã được thực hiện:
 Phân tích sơ bộ vòm và boong;
 Phân tích sơ bộ các trụ dưới các hành động lây truyền qua các vòm và boong;
 Phân tích sơ bộ của hành động truyền tới đống trụ
cầu;.  Phân tích sơ bộ của phương pháp tiếp cận
YR001 - Sông Swan Pedestrian Dự án Cầu | Kết cấu Báo cáo Thiết kế -
15% 5
4. Tiêu chí thiết kế và tiêu chuẩn
4.1 Thiết kế Tuân
The thiết kế kết cấu đã được xây dựng phù hợp với yêu cầu SWTC. Các
bảng dưới đây minh chứng phù hợp với các yêu cầu và tóm tắt các kỹ thuật quan trọng
yêu cầu.
TAB. 4,1-1
khoản Item Description
R: Bắt buộc
O: Tùy chọn
Thiết kế
giả định
THIẾT KẾ CHẤT LƯỢNG & THI YÊU CẦU
3.4 Component
Design Cuộc sống phần thiết kế Life:
công trình cầu và tường chắn
- 100 năm R
Earthquake
giá trị; trang trải để
tăng cường
lớp phủ bảo vệ kết cấu thép để
- 25 năm R
Để được đánh giá trong
giai đoạn tương lai của
thiết kế
ĐỘ BỀN
3.6 (c) (i) Độ bền
Để đảm bảo với chính
Roads rằng durabilit
đang được dịch, vui lòng đợi..
 
Các ngôn ngữ khác
Hỗ trợ công cụ dịch thuật: Albania, Amharic, Anh, Armenia, Azerbaijan, Ba Lan, Ba Tư, Bantu, Basque, Belarus, Bengal, Bosnia, Bulgaria, Bồ Đào Nha, Catalan, Cebuano, Chichewa, Corsi, Creole (Haiti), Croatia, Do Thái, Estonia, Filipino, Frisia, Gael Scotland, Galicia, George, Gujarat, Hausa, Hawaii, Hindi, Hmong, Hungary, Hy Lạp, Hà Lan, Hà Lan (Nam Phi), Hàn, Iceland, Igbo, Ireland, Java, Kannada, Kazakh, Khmer, Kinyarwanda, Klingon, Kurd, Kyrgyz, Latinh, Latvia, Litva, Luxembourg, Lào, Macedonia, Malagasy, Malayalam, Malta, Maori, Marathi, Myanmar, Mã Lai, Mông Cổ, Na Uy, Nepal, Nga, Nhật, Odia (Oriya), Pashto, Pháp, Phát hiện ngôn ngữ, Phần Lan, Punjab, Quốc tế ngữ, Rumani, Samoa, Serbia, Sesotho, Shona, Sindhi, Sinhala, Slovak, Slovenia, Somali, Sunda, Swahili, Séc, Tajik, Tamil, Tatar, Telugu, Thái, Thổ Nhĩ Kỳ, Thụy Điển, Tiếng Indonesia, Tiếng Ý, Trung, Trung (Phồn thể), Turkmen, Tây Ban Nha, Ukraina, Urdu, Uyghur, Uzbek, Việt, Xứ Wales, Yiddish, Yoruba, Zulu, Đan Mạch, Đức, Ả Rập, dịch ngôn ngữ.

Copyright ©2025 I Love Translation. All reserved.

E-mail: