1 The Contractor is referred to the specifications and drawings to be read in conjunction for all details related to this section of the works and he is to include for complying with all the requirements contained therein, whether or not they are specifically mentioned within the items. The Contractor shall familiarize himself with the Technical Specification and refer to clauses appearing under the relevant work sections. 2 The Contractor shall carefully study the Technical Specifications, and satisfy himself as to the full extent, character and nature of the Works to be performed under this Contract. The Employer shall not entertain any claim arising from the Contractor's failure to study these Documents. 3 Site preparation and setting out 4 Mobilization and demobilization of equipment and plants 5 Site investigation and setting out 6 Site surveying and site clearance 7 General project coordination procedures 8 Coordination Drawings 9 Administrative and supervision personnel 10 Cleaning and protection 11 REFERENCED STANDARDS PROJECT MEETINGS 12 Pre-construction conferences 13 Pre-installation conferences 14 Progress meetings 15 Coordination meetings 16 Post-construction conference SUBMITTALS 17 Submittal procedures 18 Construction progress schedule 19 Product data 20 Samples 21 Manufacturer's Instruction 22 Shop drawings QUALITY CONTROL 23 Quality assurance and control of installation 24 Field samples 25 Manufactures' field services and reports 26 TESTING LABORATORY SERVICES CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS 27 Temporary electricity & lighting including connection fees 28 Site layout organization plan 29 Safety Barriers MATERIAL AND EQUIPMENT 30 Transportation, delivery, receiving and handling 31 Storage and protection CONTRACT CLOSEOUT 32 Substantial completion 33 Final completion 34 Provision of as-built drawings 35 Closeout submittals 36 Statement of Adjustment of Accounts 37 Application for final payment 38 FINAL CLEANING PROJECT RECORD DOCUMENTS 39 Maintenance of record documents and samples 40 Submittal of record document and samples 41 OPERATION AND MAINTENANCE DATA WARRANTIES & BONDS 42 Insurance (except concrete wall code CB, and washbasin walls where tiling will be applied)
đang được dịch, vui lòng đợi..
