From the final reachability matrix, the structural model is generated known as diagraph. After removing the transitivity links and replacing the node numbers by statements, the ISM model is generated which has been shown in Figure 3. It has been observed from Figure 3 that ‘Top management commitment’ has been very significant variable for lean manufacturing system implementation in the Indian automobile industry as it comes at the base of the ISM hierarchy. ‘Relative cost benefits’ has been identified as the top level variable in the model.
đang được dịch, vui lòng đợi..
