2. Project Chief Engineer
1) Be responsible for the Project Manager; assist the Project Manager in work; perform the responsibility and authority of Project Manager on behalf of Project Manager when Project Manager goes out.
2) Direct daily construction production scheduling, scientifically organize and deploy personnel, property and material used in the project construction to ensure the completion of the project progress on schedule,
3) Take responsibility of construction technology, safety and quality of works in this construction section, and organize the preparation of major construction scheme of the Project and joint examination of construction drawings.
4) Take responsibility of the identification of technical performance of all tools and equipment used in the Project, and provide technical guidance to the Project. The technical scheme of general measures shall be finally approved by the Project Chief Engineer.
5) Take responsibility of implementation of integrated management system standard and ensure the effective operation of the system in the Project.
6) Take responsibility of pre-job technical training and examination, and verify the conditions for starting construction.
7) Take responsibility of periodical update of the project progress and the application of "Project Information Management System".
8) Organize the collection, compilation, handover and filing of project data of this construction section.
3. Technical Director
1) Under the leadership of the Project Chief Engineer, he shall take responsibility of the construction technology of this construction section, and be responsible for the Project Chief Engineer.
2) Carry out relevant national construction technology policies, as well as relevant technical regulations, specifications and technology management system issued by higher authorities.
3) Prepare construction technology materials for the Project Department, organize the technical disclosure to construction by the Project Management Department, and solve technical problems occurred during construction of the construction section.
4) Take responsibility of the preparation of construction quality and safety ensuring measures.
5) Take responsibility of the metrological management of the Project.
4. Quality Director
1) Take responsibility of the daily quality management, and perform comprehensive inspection and control to each process which will influence the project quality.
2) Participate the collection, compilation, handover and filing of project data of this construction section. Supervise and inspect the project quality.
3) Prepare the quality report and submit to the project entity and related departments.
5. Safety Director
1) Perform daily safety management to the works in this construction section, and supervise and inspect the safety of the Project.
2) Implement relevant safety system and regulations, find and correct unsafety though site patrol, audit the safety measures to ensure a safe construction, check whether tools and equipment used on site can ensure the safety of personnel and equipment, and whether site arrangement meets the regulations and requirements of relevant technical scheme.
3) Collect and archive safety records; prepare safety report and submit to the project entity and related departments.
0/5000
Từ: -
Sang: -
Kết quả (Việt) 1: [Sao chép]
Sao chép!
2. Project Chief Engineer1) Be responsible for the Project Manager; assist the Project Manager in work; perform the responsibility and authority of Project Manager on behalf of Project Manager when Project Manager goes out.2) Direct daily construction production scheduling, scientifically organize and deploy personnel, property and material used in the project construction to ensure the completion of the project progress on schedule,3) Take responsibility of construction technology, safety and quality of works in this construction section, and organize the preparation of major construction scheme of the Project and joint examination of construction drawings.4) Take responsibility of the identification of technical performance of all tools and equipment used in the Project, and provide technical guidance to the Project. The technical scheme of general measures shall be finally approved by the Project Chief Engineer.5) Take responsibility of implementation of integrated management system standard and ensure the effective operation of the system in the Project.6) Take responsibility of pre-job technical training and examination, and verify the conditions for starting construction.7) Take responsibility of periodical update of the project progress and the application of "Project Information Management System".8) Organize the collection, compilation, handover and filing of project data of this construction section.3. Technical Director1) Under the leadership of the Project Chief Engineer, he shall take responsibility of the construction technology of this construction section, and be responsible for the Project Chief Engineer.2) Carry out relevant national construction technology policies, as well as relevant technical regulations, specifications and technology management system issued by higher authorities.3) Prepare construction technology materials for the Project Department, organize the technical disclosure to construction by the Project Management Department, and solve technical problems occurred during construction of the construction section. 4) Take responsibility of the preparation of construction quality and safety ensuring measures.5) Take responsibility of the metrological management of the Project.4. Quality Director1) Take responsibility of the daily quality management, and perform comprehensive inspection and control to each process which will influence the project quality.2) Participate the collection, compilation, handover and filing of project data of this construction section. Supervise and inspect the project quality.3) Prepare the quality report and submit to the project entity and related departments.5. Safety Director1) Perform daily safety management to the works in this construction section, and supervise and inspect the safety of the Project.2) Implement relevant safety system and regulations, find and correct unsafety though site patrol, audit the safety measures to ensure a safe construction, check whether tools and equipment used on site can ensure the safety of personnel and equipment, and whether site arrangement meets the regulations and requirements of relevant technical scheme. 3) Collect and archive safety records; prepare safety report and submit to the project entity and related departments.
đang được dịch, vui lòng đợi..
Kết quả (Việt) 2:[Sao chép]
Sao chép!
2. Dự án Kỹ sư trưởng
1) Chịu trách nhiệm về quản lý dự án; hỗ trợ quản lý dự án trong công việc; thực hiện trách nhiệm và quyền hạn của Quản lý dự án thay mặt cho Giám đốc dự án Quản lý dự án khi đi ra ngoài.
2) trực tiếp hàng ngày xây dựng kế hoạch sản xuất, tổ chức khoa học và triển khai nhân sự, tài sản và vật liệu sử dụng trong việc xây dựng dự án để đảm bảo hoàn thành tiến độ dự án trên lịch trình,
3) Chịu trách nhiệm về công nghệ xây dựng, an toàn và chất lượng công trình xây dựng trong phần này, và tổ chức việc lập đề án xây dựng lớn của dự án và kiểm tra chung của các bản vẽ xây dựng.
4) Chịu trách nhiệm về việc xác định các hoạt động kỹ thuật của tất cả các công cụ và thiết bị được sử dụng trong các dự án, và cung cấp các hướng dẫn kỹ thuật cho dự án. Đề án kỹ thuật của các biện pháp chung được cuối cùng đã được phê duyệt bởi các kỹ sư trưởng dự án.
5) Chịu trách nhiệm thực hiện các tiêu chuẩn hệ thống quản lý tích hợp và đảm bảo hoạt động hiệu quả của hệ thống trong các dự án.
6) Chịu trách nhiệm đào tạo kỹ thuật trước công việc và kiểm tra, xác minh và các điều kiện để khởi công xây dựng.
7) Chịu trách nhiệm về bản cập nhật định kỳ về tiến độ dự án và việc áp dụng "Hệ thống quản lý thông tin dự án".
8) Tổ chức thu, biên soạn, bàn giao và nộp các dữ liệu dự án xây dựng của phần này .
3. Giám đốc kỹ thuật
1) Dưới sự lãnh đạo của kỹ sư trưởng dự án, ông phải chịu trách nhiệm của các công nghệ xây dựng đoạn xây dựng này, và chịu trách nhiệm cho các kỹ sư trưởng dự án.
2) Thực hiện chính sách công nghệ xây dựng quốc gia có liên quan, cũng như các kỹ thuật có liên quan quy định, thông số kỹ thuật và quản lý hệ thống công nghệ do chính quyền cao hơn.
3) Chuẩn bị vật liệu xây dựng công nghệ cho các phòng Dự án, tổ chức công bố kỹ thuật để xây dựng do Cục Quản lý Dự án, và giải quyết các vấn đề kỹ thuật xảy ra trong quá trình xây dựng phần xây dựng.
4) Hãy trách nhiệm của việc chuẩn bị chất lượng xây dựng và các biện pháp an toàn bảo đảm.
5) Chịu trách nhiệm về quản lý đo lường của các dự án.
4. Chất lượng đốc
1) Chịu trách nhiệm về việc quản lý chất lượng hàng ngày và thực hiện kiểm tra, kiểm soát toàn diện cho mỗi quá trình đó sẽ ảnh hưởng đến chất lượng dự án.
2) Tham gia các bộ sưu tập, biên soạn, bàn giao và nộp các dữ liệu dự án của phần xây dựng này. Giám sát và kiểm tra chất lượng công trình.
3) Chuẩn bị các báo cáo chất lượng và trình các dự án thực thể và các phòng ban liên quan.
5. An toàn Giám đốc
1) Thực hiện quản lý an toàn hàng ngày cho các công trình xây dựng trong phần này, và giám sát, kiểm tra sự an toàn của dự án.
2) Triển khai hệ thống an toàn có liên quan và các quy định, tìm và chính xác, an toàn mặc dù trang tuần tra, kiểm toán các biện pháp an toàn để đảm bảo một xây dựng an toàn, kiểm tra xem các công cụ và thiết bị được sử dụng trên trang web có thể đảm bảo sự an toàn của người và thiết bị, và liệu sắp xếp trang web đáp ứng các quy định và yêu cầu của chương trình kỹ thuật có liên quan.
3) Thu thập và lưu trữ hồ sơ an toàn; chuẩn bị báo cáo an toàn và nộp cho tổ chức dự án và các phòng ban liên quan.
đang được dịch, vui lòng đợi..
 
Các ngôn ngữ khác
Hỗ trợ công cụ dịch thuật: Albania, Amharic, Anh, Armenia, Azerbaijan, Ba Lan, Ba Tư, Bantu, Basque, Belarus, Bengal, Bosnia, Bulgaria, Bồ Đào Nha, Catalan, Cebuano, Chichewa, Corsi, Creole (Haiti), Croatia, Do Thái, Estonia, Filipino, Frisia, Gael Scotland, Galicia, George, Gujarat, Hausa, Hawaii, Hindi, Hmong, Hungary, Hy Lạp, Hà Lan, Hà Lan (Nam Phi), Hàn, Iceland, Igbo, Ireland, Java, Kannada, Kazakh, Khmer, Kinyarwanda, Klingon, Kurd, Kyrgyz, Latinh, Latvia, Litva, Luxembourg, Lào, Macedonia, Malagasy, Malayalam, Malta, Maori, Marathi, Myanmar, Mã Lai, Mông Cổ, Na Uy, Nepal, Nga, Nhật, Odia (Oriya), Pashto, Pháp, Phát hiện ngôn ngữ, Phần Lan, Punjab, Quốc tế ngữ, Rumani, Samoa, Serbia, Sesotho, Shona, Sindhi, Sinhala, Slovak, Slovenia, Somali, Sunda, Swahili, Séc, Tajik, Tamil, Tatar, Telugu, Thái, Thổ Nhĩ Kỳ, Thụy Điển, Tiếng Indonesia, Tiếng Ý, Trung, Trung (Phồn thể), Turkmen, Tây Ban Nha, Ukraina, Urdu, Uyghur, Uzbek, Việt, Xứ Wales, Yiddish, Yoruba, Zulu, Đan Mạch, Đức, Ả Rập, dịch ngôn ngữ.