the other which forms the fully welded membrane enclosure of the horizontal convection pass floor. The second section (10HAD30BG002) turns up at back-end pass inlet and extends to the horizontal gas pass and forms rear screen (S1=225mm). Finally, it connects to the upper header of the rear water wall (10HAD30AC017, 018).
đang được dịch, vui lòng đợi..
