High-speed rail
The planned route is located on the north boundary line of Phnom Penh New Town, and a passenger station and a freight station are set up.
Expressway
The planned routes are located on the north and east boundary lines of Phnom Penh New Town. Four entrances/exits are set up, and the expressways will lead development of the industry, logistics, modern service industry and tourism industry.
Urban expressway
Form the structure of “one ring and one connection”. The ring road is composed of the north inner ring road, east inner ring road, south inner ring road and west east inner ring road, and the connection is the Tongjin Avenue.
Arterial roads
The arterial roads are rationally arranged based on conditions of the land and are connected to the urban expressway. Establish a road network with a reasonable structure and clear levels.
Traffic facilities
Port: 5,000 tonnage, in the southeast part of the New Town and downstream area of Mekong
Airport: grade 4D; it is suggested that the airport should be built on the northeast of the New Town. Highway bus station: 2 in total; one is integrated into the high-speed rail passenger station to form a highway- railway passenger terminal, and the other is located in the initiation area of the New Town and its location is selected based on the cross-river channel.