The procedure when seeking code approval for any project involves the submittal of a code-compliantdesign to the local building code official, along with the building permit application. The project then goesthrough a plan review. If the building official finds the project meets the intent of the code, then the projectwill be approved and the building permit issued. This is true regardless of how common a design mightbe; even a traditional concrete pier footing typically accepted by a code official as prescribed inR403.1.4.1 must be reviewed to ensure that site-specific conditions and the application meet the intent ofthe code. There may be cases where the prescriptive code is not satisfactory and additional means andmeasures are required. There is no product, design, or method of construction that is approved until abuilding official stamps the project as approved.
đang được dịch, vui lòng đợi..