2.10 Auxiliary Support 2.10.1 Forepoling Φ 38, L=4.0m 2.10.2 Umbrella arch method 1) Steel Pipe Number 2) Length of Drilling Φ60.5 3) Steel Pipe Installation 4) Caulking 5) Sealing 6) Packer Installation 7) Equipment Installation and removal
đang được dịch, vui lòng đợi..
