The savings in losses for the one year period, using the lumped-load more and the Heuristic Search465 MWH. This compares favorably with the results of the Pennsylvania Power and Light (PPL) project [2]. A comparison is detailed in Table 7. The higher savings for the PPL system are attributed to the higher total load, higher system losses and, most importantly, to the greater number of possible switching options. Considering the relatively smill size of the Kingston 44 kV system, the savings are quite significant
đang được dịch, vui lòng đợi..
