to aimed at speeding up the construction. The upper part of the manhole is constructed by closing the formwork, installation of steel trunk, then pouring concrete, after about 2-3 days to remove formwork.The upper part of the manholes are constructed by closing formwork, slab formwork, steel erection, then pour the concrete, after about 2-3 days is removing the formwork.