Generation additions and retirements in 2015 About 950 MW of new summer peak capacity began commercial operation within the ISO system in 2015. About 400 MW of this capacity was installed in the PG&E area and about 550 MW came on-line in the SCE and SDG&E areas. On a nameplate basis, about 450 MW of wind capacity and more than 1,200 MW of additional solar capacity came on-line in 2015. A more detailed listing of units added in 2015 is provided in Table 1.6. More than 1,000 MW of summer peak capacity was retired in 2015. The retired resources were relatively old natural gas steam turbine generators located in the SCE and SDG&E areas. Figure