The scheduling parameter that is to be set when you start material requirements planning enables you to decide which of the two alternatives you want to use (see Section 8.4.2, Parameters for Material Requirements Planning). The basic date determination based on in-house production time is the more commonly used method in material requirements plan•ning and is described in the following section.